A024_CDRL.pdf

PDF 299 KB Posted

Attached to
A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) Federal contract opportunity
Solicitation number
FA8202-18-R-1001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document package includes a Contract Data Requirements List (CDRL) and details regarding a federal contract opportunity for engineering data and technical drawings to support the A-10 Thunderbolt aircraft.

The CDRL outlines requirements for the contractor to deliver product drawings, models, and associated lists to support the A-10 aircraft wing assembly. It specifies the required drawing standards, formats, and metadata for CAD models and PDF drawings, as well as submission procedures and distribution instructions. A TDP Option Selection Worksheet is also included, calling for 3D CAD models in Siemens NX format along with 2D PDF drawings and lists. The contractor must update engineering data as needed and submit samples to the government for review and acceptance prior to final delivery.

The related federal contract opportunity is a solicitation to provide an A-10 Thunderbolt Advanced Wing Continuation Kit. Only contractors registered with the Defense Logistics Agency and having an approved DD Form 2345 may obtain a copy of the technical data package, which includes export-controlled information. The solicitation is issued by the Air Force Life Cycle Management Center at Hill Air Force Base.

CDRL A024

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK), newest first.
File Type Posted
Section_L.docx DOCX document
Form_260.pdf PDF
ATTACHMENT_F_-_Government_Furnished_Information_List_Rev_A.pdf PDF
Non_Proprietary_Questions_141-161.pdf PDF
SOW_ATTACHMENT_D_Operational_and_Flight_Check_Requirements.pdf PDF
A027_CDRL.pdf PDF
SOW_ATTACHMENT_G_Government_Furnished_Property_List.pdf PDF
A038_CDRL.pdf PDF
A005_CDRL.pdf PDF
A041_CDRL.pdf PDF
A025_CDRL.pdf PDF
RFP_Attach_5_Client_Authorization.docx DOCX document
A017_CDRL.pdf PDF
RFP_Attach_4_Past_Performance_Questionnaire.docx DOCX document
A037_CDRL.pdf PDF
SOW_ATTACHMENT_A_Engineering_Data_Requirements.pdf PDF
Form_260.pdf PDF
A039_CDRL.pdf PDF
SOW_ATTACHMENT_E_Delivery_Kitting_List.pdf PDF
A032_CDRL.pdf PDF
A043_CDRL.pdf PDF
SOW_ATTACHMENT_F_Government_Furnished_Information_List.pdf PDF
A007_CDRL.pdf PDF
FA820218R1001.pdf PDF
RFP_Attach_1_Instruct_to_Offerors.pdf PDF
RFP_Attach_3_SubKtr_and_Joint_Venture_Partner_Consent.docx.pdf PDF
Schedule_Incentive_CLIN_0005.pdf PDF
A012_CDRL.pdf PDF
SOW_ATTACHMENT_B_Critical_Safety_Items_CSI_List.pdf PDF
A016_CDRL.pdf PDF
A035_CDRL.pdf PDF
A010_CDRL.pdf PDF
A011_CDRL.pdf PDF
A023_CDRL_-.pdf PDF
A003_CDRL.pdf PDF
A009_CDRL.pdf PDF
A008_CDRL.pdf PDF
RFP_Attach_7_SUPPLEMENT_Data_Entry_Form.pdf PDF
Section_L.docx DOCX document
Section_M.docx DOCX document
A030_CDRL.pdf PDF
SOW_ATTACHMENT_C_Contract_Data_Requirements_List_CDRL_and_Distribution.pdf PDF
A029_CDRL.pdf PDF
ATTACK_SOW.pdf PDF
A014_CDRL.pdf PDF
A019_CDRL.pdf PDF
A026_CDRL.pdf PDF
A034_CDRL.pdf PDF
DD_form_2345.pdf PDF
A036_CDRL.pdf PDF
Show all 50

A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MIL-STD-31000

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO.

B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s).

1. TDP Level (X and complete as applicable .)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable .)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODELS ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) ____________________________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO 32000 PORTABLE DOCUMENT FORMAT ________________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY ___________________________________________________

REMARKS : ______________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE:

C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: ______________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply )

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS

6. ASSOCIATED LIST (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA

PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS

APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED YES NO

8. OTHER TAILORING (Attach additional sheets as necessary)

FIGURE 1: TDP Option Selection Worksheet

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

xTDP: Off xTM: Off

OTHER:

DSYSTEMITEM:

E_CONTRACTPR_NO:

FCONTRACTOR:

16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.

Page2: 2 of_pages:

Reset:

xtm: Off
1_DATA_ITEM_NO: A024
2_TITLE_OF_DATA_ITEM: PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
3_SUBTITLE: TECHNICAL DATA PACKAGE
4_AUTHORITY_Data_Acquisit: DI-SESS-81000E/T
5_CONTRACT_REFERENCE: SEE BLK 16
6_REQUIRING_OFFICE: A-10 SPO
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: D
10_FREQUENCY: SEE BLK 16
11_AS_OF_DATE: ASREQ
12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16
addressee1: See Blk 16
draft1:
reg1:
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: Drawings shall be IAW ASME Y14.100-2013 (including Appendices B,C,D,E) ASME Y14.5, ASME Y14.3-2012, ASME Y 14.24, ASME Y14.34, ASME Y14.35, ASME Y14.41.

Block 4: Tailor Dl-SESS-81000E per information in this document and SOW Paragraphs: 3.3.1.1, 3.3.3.3.2.1 and 3.3.3.3.2.2.

Block 5: SOW 3.1.1, 3.3.3.3.2.1 and 3.3.3.3.2.2

A shipping list shall be provided with each shipment of engineering data. This shipping list shall identify, in alphanumeric document number order, each document furnished in the package.

The prime contractor may choose to request changes to the TDP, or in certain circumstances, find that changes to the TDP are necessary.

The contractor shall update and provide engineering data for the items designed, developed, modified, and produced by this contract and shall incorporate all changes IAW the following: Any engineering changes which affects form, fit, function, interface, or requires a part number re-identification.

The format of the CAD model files shall be Siemens NX 8.5 or current A-10 SPO version.

Block 6: AFLCMC/WWAP, 6067 Box Elder Lane, Bldg 1284, Hill AFB, 84056-5811

Block 8: A-10 SPO approval/disapproval/comments within twenty one 21 working days after receipt of each submittal.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Brian Thompson
H_DATE: 2018-04-26
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 0
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
xTDP: Yes
OTHER:
DSYSTEMITEM: A-10C Wing Assembly
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 3
Reset:
xTM: Off
16_REMARKS_Continued: Block 9: The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DOD) and US DOD contractors only Administrative or Operational use, 12 April 2018.

Other requests for this document shall be referred to A-10 SPO, Hill AFB, UT 84056

HANDLING AND DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of the contents or reconstruction of document.

WARNING: This document contains technical data whose export is restricted by the Arms Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administrative Act of 1979, as amended (Title 50, U.S.C., App 2401, et seq.). Violations of these export laws are subject to severe criminal penalties. Dissemination of this document is controlled under DOD Directive 5230.25.

Blocks 10,12, and 13:

The prime contractor may choose to request changes to the TDP, or in certain circumstances, find that changes to the TDP are necessary.

The contractor shall update and submit (as needed) engineering data for the items being requested to change the TDP for government approval/disapproval/comments within twenty one 21 working days after receipt of each submittal.

Block 14:

A) Deliver to each addressee indicated on the Distribution List (Attachment C of SOW).

B) Deliveries shall be provided electronically into the contractor's data repository for retrieval by data management for import into Teamcenter using the "A-10 Data Exchange Specification" 12-A10DOC-002, CD/DVDs shall be produced upon Government request. Contractor shall deliver 2-D assembly engineering drawings in PDF and associated list media PDF version 2003 or newer.

Contractor shall deliver applicable 3-D CAD model in native file format of Siemens NX.

ISO 10303 Standard for Exchange of Product Model data- STEP the following shall be delivered as applicable:

Element Title Comments

AP 202 Associative Drafting Includes 3-D geometry imbedded in 2-D raster-necessary in some circumstances

AP 203 Configuration Controlled 3-D Principle application of STEP for DoD Models (design) AP 209 Structural Analysis For handling analysis data- usually not exchanged or saved

AP 210 Electromechanical Assembly Particular constructs for electronics

AP 238 Machining (STEP NC)

Page2: 2
Page4: 3
Block16_Cont:
2:

ASME Y14.100-2013

(5) (Drawing Verification and Approval) para 4.28 - For newly created Drawings and Associated Lists contractor signature block format is acceptable provided it meets the requirements of ASME Y14.1. In addition the following blocks shall be added to signature block: AF Authentication and Approval Date, AF Release and Approval Date. Contractor names shall be used for Checker, Engineer, Engineering Approval, and Drafter. AF names shall be used for AF Authentication and AF Release.

NOTE: AF Authentication and AF Release names will be provided to contractor by the Engineering Data Management Officer from A-10 SPO prior to final release of the engineering drawings. In addition, at the time of Government acceptance of TDP, the contractor and government shall sign AF Form 2602 (Engineering Document Release Record) for each newly created Drawings and Associated List. Government will provide AF Form 2602 to the contractor. Release dates on AF Form 2602, Drawings and Associated Lists shall match.

(6) Drawing numbers shall be A-10 Air Force drawing numbers that will be assigned by Carla.Poling@us.af.mil. All unused drawing numbers shall be turned back to Carla Poling.

Teamcenter Requirements (Instructions) for All documents (Drawings and Associated Lists) submitted in PDF Format, all other documents/files in their native formats. Metadata shall be prepared IAW latest version of A-10 Date Exchange Specification (ADES), 12-A10DOC-002, Hill Air Force Base.

Contractor shall submit a Digital Data Sample, including Metadata (indexing file) for Drawings and Associated Lists Sample shall be submitted on CD ROM or as agreed upon by the government to AFLCMC/WWAEJ thirty (30) working days prior to final delivery. The Government requires ten (10) working days for inspection and acceptance of sample files. Metadata shall be submitted in PLMXML and must conform to the neutral file format specified in the ADES.

Final Delivery

(b) Contractor shall submit Drawings and Associated Lists to BLK 14 addressees. Final delivery format shall match sample formats defined above or as agreed upon by the government. Government requires forty five (45) working days for final inspection and acceptance of delivery. CD-ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number and System.

A CONTRACT NO:
B EXHIBITATTACHMENT NO:
C CLIN:
D CDRL DATA ITEM NOs:
1 TDP Level X and complete as applicable:
CONCEPTUAL LEVEL: Off
DEVELOPMENTAL LEVEL: Off
PRODUCTION LEVEL: On
B REMARKS:
2 TYPE AND FORMAT X all that apply and complete as applicable:
TYPE 2D 2D DRAWINGS: Off
TYPE 3D 3D MODELS ONLY: On
TYPE 3D 3D MODELS WITH: Off
undefined: Siemens NX
NATIVE CAD SPECIFY TYPE: On
ISO 10303 STEP FORMAT Specify STEP PROTOCOL AP203 AP 214 etc: On
ISO 32000 PORTABLE DOCUMENT FORMAT: Off
OTHER ELECTRONIC FORMAT SPECIFY TYPE: Off
HARDCOPY: Off
undefined_2:
undefined_3:
undefined_4:
undefined_5:
REMARKS:
CONTRACTOR CAGE AND DOCUMENT NUMBERS: Off
GOVERNMENT CAGE COMPLETE 3B 3C OR 3D: On
B USE CAGE CODE: 98747
C USE DOCUMENT NUMBERS:
D To Be Assigned By: Carla Poling
4 DRAWING FORMATS X one and complete as applicable:
CONTRACTOR FORMAT: On
GOVERNMENT FORMAT: Off
REMARKS_2:
5 TDP ELEMENTS REQUIRED X all that apply:
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR OR THE FOLLOWING ARE REQUIRED: Off
CONCEPTUAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off
DEVELOPMENTAL DESIGN DRAWINGSMODELS AND ASSOCIATED LISTS: Off
PRODUCT DRAWINGSMODELS AND ASSOCIATED LISTS: On
COMMERCIAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off
QUALITY ASSURANCE PROVISIONS: Off
SPECIAL INSPECTION EQUIPMENT SIE DRAWINGSMODELS AND ASSOCIATED LISTS: Off
SPECIAL TOOLING ST DRAWINGSMODELS AND ASSOCIATED LISTS: Off
SPECIFICATIONS: Off
SOFTWARE DOCUMENTATION: Off
SPECIAL PACKAGING INSTRUCTIONS SPI DRAWINGSMODELS AND ASSOCIATED LISTS: Off
6 ASSOCIATED LIST X and complete as applicable:
A PARTS LIST X ONE:
undefined_6: On
1 INTEGRAL: Off
2 SEPARATE:
undefined_7: On
B DATA LISTS X ONE:
undefined_8: Off
1 NOT REQUIRED: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY: Off
C INDEX LISTS X ONE:
undefined_9: Off
1 NOT REQUIRED_2: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_2: Off
D WIRING LISTS X ONE: Off
1 NOT REQUIRED_3: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_3: Off
E INDENTURED DATA LISTS X ONE: Off
1 NOT REQUIRED_4: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_4: Off
F APPLICATION LISTS X ONE: Off
1 NOT REQUIRED_5: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_5: Off
F APPLICATION LISTS X ONERow1:
1 NOT REQUIREDRow1:
2 REQUIRED SPECIFY LEVELS OF ASSEMBLYRow1:
ASME Y14100 ENGINEERING DRAWING PRACTICES WITH APPENDICES B C D E:
ASME Y14100: On
ASME Y1424 TYPES AND APPLICATIONS OF: On
OTHER STANDARDS: Off
ASME Y1434 ASSOCIATED LIST: On
ASME Y1435M REVISION OF ENGINEERING: On
B: On
C: On
D: On
E: On
ASME Y1441 DIGITAL PRODUCT DEFINITION DATA: On
COMPANY STANDARDS: NO
ASME Y145 DIMENSIONING AND TOLERANCING: On
8 OTHER TAILORING Attach additional sheets as necessary:
2018-04-26T15:26:14-0600
THOMPSON.BRIAN.L.1393111921

File details come from the government source that posted it. Updated .