Question_146.pdf
PDF 41 KB Posted
- Attached to
- A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) Federal contract opportunity
- Solicitation number
- FA8202-18-R-1001
About this file
This document provides clarification regarding a request for proposals for the A-10 Thunderbolt Advanced-Wing Continuation Kit. The solicitation seeks proposals to provide the kit, which is subject to export control laws and regulations. Only contractors registered and certified with the Defense Logistics Services Center and approved on DD Form 2345 will receive copies of the solicitation or related export-controlled data. Offerors must submit formal requests along with the approved DD 2345 form to obtain the technical data package. The document clarifies that the past performance portion of proposals must use the Past Performance Information Tool to submit specific past performance information as instructed in an attachment, while the past performance team will have access to both the tool's data and information provided in another attachment. Character limits for the tool are set in one attachment, so page limits for the other attachment will not be affected by tool responses. Pictures and diagrams for past performance may still be included as instructed.
Question 146
View the file
Other files for this federal contract opportunity
Show all 50
A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final RFP, Attachment 2, 25
May 18
Past_Perf
Information
Sheet
Section L.II.D.1, RFP_Attach_1
Instruct_to_Offerors, RFP_Attach_2
Past_Perf_Info_Sheet
Section L.II.D.1 "General: Offerors must use the Past
Performance Information (PPI) Tool (Use latest version from https://www.FBO.gov) in order to electronically submit the PPI portion of the Past
Performance Volume."
RFP_Attach_1_Instruct_to_Offerors, #4 on Page 8 states: "Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be Tab 1 of the past performance volume."
RFP_Attach_2_Past_Perf_Info_Sheet instructions are to: "Complete a separate FACTS Sheet for each relevant contract."
Section L requires the use of the PPI
Tool, which does not allow pictures and tables.
Attachment 1 requires that the pages generated from the PPI Tool are to be placed in the Volume. Each contract citation is limited to 16 pages.
The Attachment 2 PPI Sheet requires offerors to provide examples of items such as rejection tags.
How are offerors to include pictures and diagrams in the Past Performance
Volume if the requirement is to use the sheets generated by the PPI Tool?
Please clarify the information required beyond that in the PPIT, if any, and where that information is to be placed in the Past
Performance Volume, e.g., rejection tag pictures.
Section L.II.D.1. updated to "Offerors must use the Past Performance
Information (PPI) Tool (Use latest version from https://www.FBO.gov) in order to electronically submit specific PPI portions, as instructed in
Past Performance Instructions for Offerors (See RFP Attachment 1), of the Past Performance Volume."
RFP Attach 1 has been updated to remove the language requiring redundant hard copies.
These changes will be relected in an RFP amendment.
The past performance team will have access to data provided by the
PPI tool and RFP Attach 2. Character limits for the PPI tool are established in RFP Attach 1, and therefore RFP Attach 2 page limits shall not be affected by responses provided in PPI Tool.
File details come from the government source that posted it. Updated .