A024_CDRL.pdf
PDF 299 KB Posted
- Attached to
- A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) Federal contract opportunity
- Solicitation number
- FA8202-18-R-1001
About this file
This draft request for proposal concerns a technical data package for continued modernization of the A-10 Thunderbolt attack aircraft. The Air Force Materiel Command seeks to procure product drawings, models and associated lists documenting the aircraft's wing assembly. Respondents should follow ASME standards for engineering drawings and adopt Siemens NX file formats for three-dimensional computer-aided design models. The technical data package aims to incorporate engineering changes affecting form, fit, function or requiring part number reidentification. Documentation must include distribution statements and handling instructions. The solicitation targets a production-level data package delineating wing components and assemblies down to the lowest replaceable levels. Respondents must submit sample files for metadata and portfolio organization prior to finalizing the technical data package.
CDRL A024
View the file
Other files for this federal contract opportunity
Show all 50
A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MIL-STD-31000
TDP OPTION SELECTION WORKSHEET
SYSTEM: DATE PREPARED:
A. CONTRACT NO.
B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA
ITEM NO(s).
1. TDP Level (X and complete as applicable .)
A. CONCEPTUAL LEVEL
DEVELOPMENTAL LEVEL
PRODUCTION LEVEL
B. REMARKS:
2. TYPE AND FORMAT (X all that apply and complete as applicable .)
A.
TYPE 2D: 2D DRAWINGS
TYPE 3D: 3D MODELS ONLY
TYPE 3D: 3D MODELS WITH
ASSOCIATED 2D DRAWINGS
B.
NATIVE CAD (SPECIFY TYPE) ____________________________________
ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)
ISO 32000 PORTABLE DOCUMENT FORMAT ________________________
OTHER ELECTRONIC FORMAT (SPECIFY TYPE)
HARDCOPY ___________________________________________________
REMARKS : ______________________________________________________
3. CAGE Code AND DOCUMENT
NUMBERS
A. CONTRACTOR CAGE AND DOCUMENT NUMBERS
GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)
D. To Be Assigned By:
B. USE CAGE CODE:
C. USE DOCUMENT NUMBERS:
4. DRAWING FORMATS (X one and complete as applicable)
CONTRACTOR FORMAT.
GOVERNMENT FORMAT.
REMARKS: ______________________________________________________________________________________
5. TDP ELEMENTS REQUIRED (X all that apply )
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:
CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS
DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS
QUALITY ASSURANCE PROVISIONS
SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIFICATIONS
SOFTWARE DOCUMENTATION
SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS
6. ASSOCIATED LIST (X and complete as applicable)
A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE
B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)
ASME Y14.100
ENGINEERING DRAWING
PRACTICES
WITH APPENDICES:
B C D E
ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
ASME Y14.34 ASSOCIATED LIST
ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA
PRACTICES
ASME Y14.5 DIMENSIONING AND TOLERANCING
OTHER STANDARDS
APPLY AS
DESCRIBED:
COMPANY STANDARDS
PERMITTED YES NO
8. OTHER TAILORING (Attach additional sheets as necessary)
FIGURE 1: TDP Option Selection Worksheet
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
xTDP: Off xTM: Off
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.
Page2: 2 of_pages:
Reset:
| xtm: Off |
| 1_DATA_ITEM_NO: A024 |
| 2_TITLE_OF_DATA_ITEM: PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS |
| 3_SUBTITLE: TECHNICAL DATA PACKAGE |
| 4_AUTHORITY_Data_Acquisit: DI-SESS-81000E/T |
| 5_CONTRACT_REFERENCE: SEE BLK 16 |
| 6_REQUIRING_OFFICE: A-10 SPO |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| DIST_STATEMENT: D |
| 10_FREQUENCY: SEE BLK 16 |
| 11_AS_OF_DATE: ASREQ |
| 12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16 |
| addressee1: See Blk 16 |
| draft1: |
| reg1: |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: Drawings shall be IAW ASME Y14.100-2013 (including Appendices B,C,D,E) ASME Y14.5, ASME Y14.3-2012, ASME Y 14.24, ASME Y14.34, ASME Y14.35, ASME Y14.41. |
Block 4: Tailor Dl-SESS-81000E per information in this document and SOW Paragraphs: 3.3.1.1, 3.3.3.3.2.1 and 3.3.3.3.2.2.
Block 5: SOW 3.1.1, 3.3.3.3.2.1 and 3.3.3.3.2.2
A shipping list shall be provided with each shipment of engineering data. This shipping list shall identify, in alphanumeric document number order, each document furnished in the package.
The prime contractor may choose to request changes to the TDP, or in certain circumstances, find that changes to the TDP are necessary.
The contractor shall update and provide engineering data for the items designed, developed, modified, and produced by this contract and shall incorporate all changes IAW the following: Any engineering changes which affects form, fit, function, interface, or requires a part number re-identification.
The format of the CAD model files shall be Siemens NX 8.5 or current A-10 SPO version.
Block 6: AFLCMC/WWAP, 6067 Box Elder Lane, Bldg 1284, Hill AFB, 84056-5811
Block 8: A-10 SPO approval/disapproval/comments within twenty one 21 working days after receipt of each submittal.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Brian Thompson |
| H_DATE: 2018-04-26 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 0 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: |
| xTDP: Yes |
| OTHER: |
| DSYSTEMITEM: A-10C Wing Assembly |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| of_pages: 3 |
| Reset: |
| xTM: Off |
| 16_REMARKS_Continued: Block 9: The following information shall be included on the deliverable: |
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DOD) and US DOD contractors only Administrative or Operational use, 12 April 2018.
Other requests for this document shall be referred to A-10 SPO, Hill AFB, UT 84056
HANDLING AND DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of the contents or reconstruction of document.
WARNING: This document contains technical data whose export is restricted by the Arms Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administrative Act of 1979, as amended (Title 50, U.S.C., App 2401, et seq.). Violations of these export laws are subject to severe criminal penalties. Dissemination of this document is controlled under DOD Directive 5230.25.
Blocks 10,12, and 13:
The prime contractor may choose to request changes to the TDP, or in certain circumstances, find that changes to the TDP are necessary.
The contractor shall update and submit (as needed) engineering data for the items being requested to change the TDP for government approval/disapproval/comments within twenty one 21 working days after receipt of each submittal.
Block 14:
A) Deliver to each addressee indicated on the Distribution List (Attachment C of SOW).
B) Deliveries shall be provided electronically into the contractor's data repository for retrieval by data management for import into Teamcenter using the "A-10 Data Exchange Specification" 12-A10DOC-002, CD/DVDs shall be produced upon Government request. Contractor shall deliver 2-D assembly engineering drawings in PDF and associated list media PDF version 2003 or newer.
Contractor shall deliver applicable 3-D CAD model in native file format of Siemens NX.
ISO 10303 Standard for Exchange of Product Model data- STEP the following shall be delivered as applicable:
Element Title Comments
AP 202 Associative Drafting Includes 3-D geometry imbedded in 2-D raster-necessary in some circumstances
AP 203 Configuration Controlled 3-D Principle application of STEP for DoD Models (design) AP 209 Structural Analysis For handling analysis data- usually not exchanged or saved
AP 210 Electromechanical Assembly Particular constructs for electronics
AP 238 Machining (STEP NC)
| Page2: 2 |
| Page4: 3 |
| Block16_Cont: |
| 2: |
ASME Y14.100-2013
(5) (Drawing Verification and Approval) para 4.28 - For newly created Drawings and Associated Lists contractor signature block format is acceptable provided it meets the requirements of ASME Y14.1. In addition the following blocks shall be added to signature block: AF Authentication and Approval Date, AF Release and Approval Date. Contractor names shall be used for Checker, Engineer, Engineering Approval, and Drafter. AF names shall be used for AF Authentication and AF Release.
NOTE: AF Authentication and AF Release names will be provided to contractor by the Engineering Data Management Officer from A-10 SPO prior to final release of the engineering drawings. In addition, at the time of Government acceptance of TDP, the contractor and government shall sign AF Form 2602 (Engineering Document Release Record) for each newly created Drawings and Associated List. Government will provide AF Form 2602 to the contractor. Release dates on AF Form 2602, Drawings and Associated Lists shall match.
(6) Drawing numbers shall be A-10 Air Force drawing numbers that will be assigned by Carla.Poling@us.af.mil. All unused drawing numbers shall be turned back to Carla Poling.
Teamcenter Requirements (Instructions) for All documents (Drawings and Associated Lists) submitted in PDF Format, all other documents/files in their native formats. Metadata shall be prepared IAW latest version of A-10 Date Exchange Specification (ADES), 12-A10DOC-002, Hill Air Force Base.
Contractor shall submit a Digital Data Sample, including Metadata (indexing file) for Drawings and Associated Lists Sample shall be submitted on CD ROM or as agreed upon by the government to AFLCMC/WWAEJ thirty (30) working days prior to final delivery. The Government requires ten (10) working days for inspection and acceptance of sample files. Metadata shall be submitted in PLMXML and must conform to the neutral file format specified in the ADES.
Final Delivery
(b) Contractor shall submit Drawings and Associated Lists to BLK 14 addressees. Final delivery format shall match sample formats defined above or as agreed upon by the government. Government requires forty five (45) working days for final inspection and acceptance of delivery. CD-ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number and System.
| A CONTRACT NO: | |
| B EXHIBITATTACHMENT NO: | |
| C CLIN: | |
| D CDRL DATA ITEM NOs: | |
| 1 TDP Level X and complete as applicable: | |
| CONCEPTUAL LEVEL: Off | |
| DEVELOPMENTAL LEVEL: Off | |
| PRODUCTION LEVEL: On | |
| B REMARKS: | |
| 2 TYPE AND FORMAT X all that apply and complete as applicable: | |
| TYPE 2D 2D DRAWINGS: Off | |
| TYPE 3D 3D MODELS ONLY: On | |
| TYPE 3D 3D MODELS WITH: Off | |
| undefined: Siemens NX | |
| NATIVE CAD SPECIFY TYPE: On | |
| ISO 10303 STEP FORMAT Specify STEP PROTOCOL AP203 AP 214 etc: On | |
| ISO 32000 PORTABLE DOCUMENT FORMAT: Off | |
| OTHER ELECTRONIC FORMAT SPECIFY TYPE: Off | |
| HARDCOPY: Off | |
| undefined_2: | |
| undefined_3: | |
| undefined_4: | |
| undefined_5: | |
| REMARKS: | |
| CONTRACTOR CAGE AND DOCUMENT NUMBERS: Off | |
| GOVERNMENT CAGE COMPLETE 3B 3C OR 3D: On | |
| B USE CAGE CODE: 98747 | |
| C USE DOCUMENT NUMBERS: | |
| D To Be Assigned By: Carla Poling | |
| 4 DRAWING FORMATS X one and complete as applicable: | |
| CONTRACTOR FORMAT: On | |
| GOVERNMENT FORMAT: Off | |
| REMARKS_2: | |
| 5 TDP ELEMENTS REQUIRED X all that apply: | |
| ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR OR THE FOLLOWING ARE REQUIRED: Off | |
| CONCEPTUAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| DEVELOPMENTAL DESIGN DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| PRODUCT DRAWINGSMODELS AND ASSOCIATED LISTS: On | |
| COMMERCIAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| QUALITY ASSURANCE PROVISIONS: Off | |
| SPECIAL INSPECTION EQUIPMENT SIE DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| SPECIAL TOOLING ST DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| SPECIFICATIONS: Off | |
| SOFTWARE DOCUMENTATION: Off | |
| SPECIAL PACKAGING INSTRUCTIONS SPI DRAWINGSMODELS AND ASSOCIATED LISTS: Off | |
| 6 ASSOCIATED LIST X and complete as applicable: | |
| A PARTS LIST X ONE: | |
| undefined_6: On | |
| 1 INTEGRAL: Off | |
| 2 SEPARATE: | |
| undefined_7: On | |
| B DATA LISTS X ONE: | |
| undefined_8: Off | |
| 1 NOT REQUIRED: Off | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLY: Off | |
| C INDEX LISTS X ONE: | |
| undefined_9: Off | |
| 1 NOT REQUIRED_2: Off | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_2: Off | |
| D WIRING LISTS X ONE: Off | |
| 1 NOT REQUIRED_3: Off | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_3: Off | |
| E INDENTURED DATA LISTS X ONE: Off | |
| 1 NOT REQUIRED_4: Off | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_4: Off | |
| F APPLICATION LISTS X ONE: Off | |
| 1 NOT REQUIRED_5: Off | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_5: Off | |
| F APPLICATION LISTS X ONERow1: | |
| 1 NOT REQUIREDRow1: | |
| 2 REQUIRED SPECIFY LEVELS OF ASSEMBLYRow1: | |
| ASME Y14100 ENGINEERING DRAWING PRACTICES WITH APPENDICES B C D E: | |
| ASME Y14100: On | |
| ASME Y1424 TYPES AND APPLICATIONS OF: On | |
| OTHER STANDARDS: Off | |
| ASME Y1434 ASSOCIATED LIST: On | |
| ASME Y1435M REVISION OF ENGINEERING: On | |
| B: On | |
| C: On | |
| D: On | |
| E: On | |
| ASME Y1441 DIGITAL PRODUCT DEFINITION DATA: On | |
| COMPANY STANDARDS: NO | |
| ASME Y145 DIMENSIONING AND TOLERANCING: On | |
| 8 OTHER TAILORING Attach additional sheets as necessary: | |
| 2018-04-26T15:26:14-0600 | |
| THOMPSON.BRIAN.L.1393111921 |
File details come from the government source that posted it. Updated .