This document is a draft request for proposal for the A-10 Thunderbolt Advanced Wing Continuation Kitting program. The Air Force Materiel Command Lifecycle Management Center is seeking proposals to develop and deliver technical manuals and provide sustainment services for the A-10 aircraft. Products and services required include inspection, flight, structural repair, and maintenance manuals along with time compliance technical orders, source data updates, and certification support. Proposals are due by an anticipated formal solicitation release date in the near future. Manuals must comply with specifications including MIL-DTL-5096, MIL-DTL-7700, MIL-DTL-9854, and MIL-DTL-38804. Delivery requirements specify quantities and formats for in-process reviews, verification, and final distribution in paper, PDF, XML and other media.
TMCR A029
View the file
Other files for this federal contract opportunity
Show all 50
A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TM-86-01Q 27 Oct 2017 1-01: AF TMSS Linear TMs
Air Force Technical Manual Contract Requirements (TMCR) for
A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) (Program/Modification/Military System)
ATTACHMENT , TO CDRL SEQUENCE NUMBER , EXHIBIT
REQUEST FOR PROPOSAL/CONTRACT: , CLIN
Date: 14 Dec 2017
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing, additional tailoring to the Technical Order Manager Agency/Agent (TOMA), Government Program Manager (PM), and Procuring Contracting Officer (PCO) for consideration. The tailored TMCR shall be attached to the Contract Data Requirements List (CDRL) for Technical Order (TO) delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal Statement Of Work (SOW). Proposals shall be compatible with the A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) Technical Order Concept of Operations (TO CONOPS). Air Force (AF) TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Management, located at http://www.tinker.af.mil/Home/TechnicalOrders.aspx. A copy may also be obtained from the Program TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The Contractor shall develop and deliver technical manuals in accordance with (IAW) this TMCR that supports the A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) requirements for technically usable manuals concurrent with the program’s TO CONOPS. The Contractor may recommend additional Section 2 tailoring to propose new TO types (Table 1) and source data and TO updates (Table 2) required to support the A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) program’s objectives.
3. Commercial Manuals. N/A
4. Technical Manual Specifications and Standards (TMSS) Tailoring. AF TMSS tailoring options and some Joint Service TMSS have been documented in preliminary Specification/Standard Interface Records (SIRS) included in Section 3. These preliminary SIRs provide the starting point for further tailoring.
Contractors may recommend additional tailoring of the Joint Service TMSS SIRs and provide recommended SIRs for other TMSS as applicable. Tailoring must not change or delete mandatory requirements which are part of the Document Type Definition (DTD) located in Section 2, Table 1.
NOTE: TMSS requirements marked “(F)” are specifically for Air Force use; “(A)” is for Army, “(M)” is Marine Corps and “(N)” is Navy. Comply with all unmarked and “(F)” TMSS requirements as modified by the tailoring options in each TMSS.
4.1. Questions concerning TMSS requirements may be resolved by written request and justified suggestions for resolution submitted through the PCO and Mr. Len Mian, AFLCMC/WWALE, 6067 Box Elder Lane Bldg 1284, Hill AFB, UT 84056 (801) 586-7150. Deficiencies and suggested improvements shall be submitted to the TMSS Preparing Activity (PA). Approved recommendations, corrections and clarifications will be maintained with contract documentation.
5. Subsequent TO/Data Requirements. When new TO requirements are identified the Contractor shall notify the Government utilizing DI-TMSS-80067C, Technical Manual (TM) Contractor Furnished http://www.tinker.af.mil/Home/TechnicalOrders.aspx
Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices, or approved Contractor formats. This process shall require Government review and approval of recommended additional requirements prior to developing additional data.
6. TO Development. TOs shall be written to a scope and depth of coverage to support the A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) operations and maintenance concepts.
6.1. Standard Generalized Markup Language (SGML) tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. Graphic updates shall be delivered as vectorized cgm. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, Graphics Format Guidelines. For assistance with illustration requirements contact AF TMSS via (e-mail:
SGMLSupport@us.af.mil).
6.2. Page-oriented Military Specification (MIL-SPEC) TOs shall be formatted with text, graphics and delivered according to the TMSS specified in Section 2. The Contractor shall develop TO files (tagged instances) using SGML according to the DTDs referenced in the appendix to MIL-STD-38784 and each applicable military detail specification (MIL-DTL). Multiple SGML file instances for a single TO document are not authorized.
7. TO Numbering. Contractors shall notify the Government, in writing, of manuals which require TO numbers. TO numbers are not required for manuals to be used exclusively by the Contractor’s own personnel. Requests for new TO numbers shall be submitted to the TOMA utilizing the TO numbering worksheet (Attachment 2, Request for Technical Order Number).
8. Data Rights. Contractors shall comply with 10 U.S.C. 2320 and cognizant Defense Federal Acquisition Regulation Supplement (DFARS) provisions and clauses in providing Unlimited Rights for all source data, TO publications, and TO updates prepared specifically for the contract. Government rights in data are specified in the DFARS, 252.227-7013, Rights in Technical Data, Noncommercial Items, 252.227- 7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, and 252.227-7015, Technical Data-Commercial Items. The Government shall be given Unlimited Rights for all Government-funded business rules (tailoring and application methods and procedures) and documented business processes developed under the contract for the purpose of TO development. For all data delivered to the Government with other than Unlimited Rights, the Contractor shall assert their data rights IAW DFARS 252.227-7017, Identification and Assertion of Use, Release, or Disclosure Restrictions. The Contractor shall pass through and enforce all requirements in this TMCR to all sub-Contractors.
9. Classification, Distribution, Destruction, Disclosure, Export Control Notices, and Cyber Security.
Contractors shall recommend the correct markings and controls for classified and restricted distribution data and TOs IAW the program’s Security Classification Guide (SCG) and Department of Defense Manual (DODM) 5200.01, Department of Defense Instruction (DODI) 5230.24, Department of Defense Directive (DODD) 5230.25, Air Force Instruction (AFI) 16-1404, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or https://assist.dla.mil/online/start/index.cfm). The markings and notices shall be reviewed during In-Process Reviews (IPR). The Contractor shall also apply policy and procedures for Cyber Security Protection IAW AFI 33-200, Information Assurance (IA) Management, AFMAN 17-1301, Computer Security (COMPUSEC), and MPTO 00-33B-5008, Remanence Security for Information Systems. NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
10. TO Quality. Contractor proposals shall describe how the Government will be allowed to interact with the Contractor’s TO development team. The Contractors shall ensure prepared TOs are: a) technically accurate and safe; b) written to a scope and depth of coverage to support the operations and maintenance mailto:SGMLSupport@us.af.mil http://www.e-publishing.af.mil/ https://assist.dla.mil/online/start/index.cfm concepts; c) properly classified and marked with export control and distribution limitation statements.
The Contractor shall maintain a Technical Manual Quality Assurance (TMQA) Program Plan for this effort. The TMQA Program Plan shall be available for review at the TO Guidance Conference. The TMQA Program Plan shall be sufficiently detailed to support TO certification to include actual performance of procedures or desk-top analysis for non-procedural data. Simulation (walk-through/talk-through) should be reserved for those procedures which would activate explosive devices or present a hazard to personnel or equipment. NOTE: Quality requirements for the Joint Nuclear Weapons Publications System (JNWPS) and for Non-nuclear Explosive Ordnance Disposal (EOD) Data are contained in TO 11N-1-1 Joint Nuclear Weapons Publication System Operating Procedures, Specifications and Standards, and DODD 5160.62, Single Manager Responsibility for Military Explosive Ordnance Disposal Technology and Training, respectively. The Government will conduct performance-tests on all JNWPS and EOD TOs.
10.1. Initial Technical Order Guidance Conference (TOGC). Working through the TOMA, the Contractor shall co-host and participate in a guidance conference for this effort. The TOGC will be held within 60 calendar days after contract award. The Technical Manual Schedule and Status will be formalized at this conference. The Contractor shall present a briefing on their interpretation of the basic contract, SOW/Performance Work Statement (PWS), CDRLs, (DIDs), MIL-SPEC, MIL-STD, SIRs, this document and the planned preparation and delivery of the TOs and related data.
10.2. In-Process Reviews. The Contractor shall participate and co-chair In-Process Reviews (IPR) of the data developed for this effort. In-Process Reviews are to ensure that data being developed as part of this effort is adequate and accurate and IAW contract requirements and cited specifications. The Contractor shall support IPRs with technical writers, engineers and QA personnel. IPRs will be held IAW TO 00-5-3 or as defined by the program office. During the IPRs the Contractor will be responsible to maintain a master markup of the document being reviewed. The Contractor shall develop meeting minutes after each review documenting all approved changes and concurrent agreements for Government review and approval. This master markup will be made available at the next scheduled review. A copy of the markup will be provided to the TOMA or designated individual at the conclusion of the review. The Contractor shall ensure all comments from previous IPRs have been incorporated prior to the next scheduled IPR. With prior approval of the TOMA, IPRs may be combined.
10.3. TO Delivery Requirements for In-Process Reviews. There will be two In-Process Reviews (IPRs) and a Pre-Publication Review (PPR) to ensure TOs are being developed according to contract requirements and that open discrepancies are cleared prior to publication. Contractor source data will be used at the IPRs. The contractor shall ensure all comments from previous IPR’s have been incorporated prior to next scheduled IPR. With the prior approval of the TOMA the IPRs may be combined. USAF Preliminary Technical Orders (PTOs) or authorized TO redlines will be used for Verification and Pre-Publication Review. IPR TO data shall be technically edited and reviewed according to the TMQA Program Plan. Manuscript (handwritten) data is not acceptable for any data to be reviewed. The TMQA Program Plan checklists shall be available for review by the Government during the IPRs. Delivery requirements are contained in Section 2, Table 3 of the TMCR.
10.4. TO Certification. The Contractor shall certify that new TO procedures and data developed to support the program are accurate, adequate, current, safe, and usable for their intended purpose. The Government may witness the certification activities. The Contractor shall incorporate comments generated by the certification process into the TOs prior to submitting the TOs for verification. At the completion of the certification, the Contractor shall submit a letter to the TOMA through the Government PCO and PM stating that certification has been completed, the certification method used, and that any deficiencies identified during the process have been corrected. The Contractor will ensure all necessary changes and corrections to affected manuals are accomplished in time to meet contract delivery schedule requirements. The Contractor shall notify the Government at least 180 days prior to the need date of any Government Furnished Information/Government Furnished Equipment (GFI/GFE) required to perform certification tasks. TO 00-5-1 and TO 00-5-3 shall be referenced for additional information on TO Certification requirements.
10.4.1. The Contractor shall propose opportunities to perform TO certification activities in conjunction with Government verification IAW TO 00-5-3, where applicable.
10.5. Verification Support. The Contractor shall support Government verification activities as required by the TOMA and the program Technical Order Life Cycle Verification Plan (TOLCVP).
Contractor verification support will consist of on station technical writing and engineering support.
The government team shall consist of Equipment Specialist (ES), Flight Manual Manager (FMM) (as required), TOMA (as required), and MAJCOM/field support personnel. A functional A-10C model aircraft with the necessary hardware and software, as well as any necessary on aircraft support (load crew, maintainers, pilots, etc.), will also be required at the verification. The Contractor shall maintain a master mark-up of the document and record minute items during the Government verification process. The Contractor shall also support all post verification reviews and ensure availability until 100% task verification is attained by the Government. Contractor source data will be incorporated into the baseline TOs by the USAF prior to verification of the manuals.
10.6. TO Prepublication Reviews (PPR). PPRs are examinations of TOs that ensure incorporation of agreed upon changes from previous reviews and verification activities. The Contractor shall prepare and deliver copies of TOs and TO updates in MIL-SPEC compliance for the PPR as shown in the delivery matrix. The TOs for PPR shall be approved by the Contractor’s QA, be in compliance with the MIL-SPECs/STDs, and incorporate all verification comments and corrections approved by the TOMA or program management office representative.
10.7. Technical Data Assessment (TDA). N/A
11. TO Delivery. TO file delivery requirements are located in Section 2, Table 3 of this document.
12. Source Data Maintenance. Contractors shall maintain accuracy, currency and configuration of TO source data, to include GFI, throughout the contract period of performance. The Contractor shall provide the Government a Configuration Control Management Plan. The Contractor will provide a minimum of annual updates throughout the life of the contract unless the Government determines otherwise.
Maintenance includes preparation of source data updates to incorporate corrections, equipment configuration changes, and maintenance and operational concept changes. Additionally, the Contractor shall ensure the accuracy, currency, and configuration of applicable data provided by their sub-Contractors as it effects the technical baseline. The Contractor shall update the source data to the latest available TO baseline as of 30 calendar days prior to final delivery of source data. NOTE: Contractors will protect GFI provided for the purposes of TO development IAW DFARS 252.227-7025, Limitations on the Use or Disclosure of Government Furnished Information Marked with Restrictive Legends.
13. TO Maintenance. N/A
14. Schedules. The Contractor shall develop and maintain an Integrated Technical Manual Schedule and Status throughout the period of performance for all TO development activities associated with this order for the life of the contract. The schedule shall be to the system/book or TCTO level and cover all major milestones of development. Any changes to the TM Schedule and Status after the TO Guidance Conference shall be coordinated with and approved by program TOMA and PCO.
15. Time Compliance Technical Orders (TCTOs). The Contractor shall prepare TCTOs, ITCTOs and resulting TO updates as required in support of A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK)
IAW TO 00-5-15 and MIL-DTL-38804 content requirements. TCTOs will be used to document all permanent modifications, initiate special “one time” inspections, or impose temporary restrictions on systems or equipment within specified time limits effecting A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK) Costs for TCTO package development must be IAW with AFI 65- 601Vol.1.
15.1. The contractor shall perform clean up of TCTO 1A-10C-520. This involves incorporating all supplements and adding all TDP changes. After all updated information/changes have been incorporated, the contractor shall deliver a finalized version of TCTO 1A-10C-520. In addition, the contractor shall deliver all TO source data for removal of TCTO 1A-10C-520 six months prior to the last wing delivered to the government. The Contractor shall deliver initial certified drafts of routine safety TCTOs to meet program office plans to satisfy requirements outlined in TO 00- 5-3/00-5-15. The Contractor shall deliver final drafts with “final” customer comments incorporated, within 5 business days of receipt of comments.
15.4. The Contractor shall deliver certified drafts of routine TCTOs to meet program office plans to satisfy requirements outlined in TO 00-5-3/00-5-15. The Contractor shall deliver final drafts with “final” customer comments incorporated, within 10 business days of receipt of comments.
SECTION 2. TM TYPE AND DELIVERY REQUIREMENTS
NOTES:
• Mark the TM Type Selection Tables indicating the applicable TO types and related specifications.
(NEW DEVELOPMENT) LINEAR TM TYPE (PUBLICATION) SELECTION TABLES.
TABLE 1
TMSS REQUIREMENTS FOR THE A-10 Thunderbolt Advanced Wing Continuation Kitting
(ATTACK) Program (System/Component)
Title or Type of Manuals Specification Required
1. Inspection TOs MIL-DTL-5096
a. Inspection and Maintenance Requirements (-6) Manual
b. Acceptance and Functional Check Flight (FCF) Procedures (-6CF)
Manual
c. Acceptance and Functional Check Flight (-6CL) Checklist
d. Inspection Workcards (-6WC)
e. Maintenance/Operations Checklists
2. Cargo Aircraft Loading and Offloading TOs MIL-DTL-5288
a. Loading Instructions Manual
b. Nuclear Weapon Cargo Loading Manual
c. Checklists
3. Weight and Balance (Aircraft) MIL-DTL-5920
a. Loading Data Manual
b. Sample Basic Weight Checklists
4. Flight Manuals MIL-DTL-7700
a. Flight Manual
b. Performance Data Manual
c. Mission Crew Manual
d. Supplemental Manual
e. Abbreviated Flight Crew Checklist
5. List of Applicable Publications MIL-DTL-8031
6. Structural Repair Manuals (for Aircraft) MIL-DTL-9854
7. Munitions/Weapons Loading Procedures, Non- nuclear and Nuclear TOs MIL-DTL-9977
a. Nuclear Weapons Basic Information and Loading Procedures
b. Nuclear Weapons Loading Procedures
c. Non-nuclear Munitions Basic Information
d. Non-nuclear Loading Procedures
e. Non-nuclear Munitions Loading Standard Data Packages (SDPs)
f. Loading Procedures Checklist
g. Single Loading Procedures Checklist
h. Integrated Loading Procedures Checklists
i. Family Group Loading Procedures Checklist
j. Nuclear Weapons Loading Procedure Checklists
k. Functional Check Procedures Checklist
l. NATO Stage B Cross-Servicing Checklists
m. End of Runway (EOR) Procedures Checklist
8. Space Operations and Support Documentation TOs -- MIL-SPEC (Intercontinental Ballistic Missiles)
MIL-PRF-38311
TMSS REQUIREMENTS FOR THE A-10 Thunderbolt Advanced Wing Continuation Kitting
(ATTACK) Program (System/Component)
Title or Type of Manuals Specification Required -- MIL-SPEC (Space) MIL-PRF-38314
a. Operations Manual
b. Operations Checklists
c. Technical Manuals and Related Checklists
9. Nuclear and Non-nuclear Weapon Delivery and Aircrew Procedures
Manuals and Checklists
MIL-DTL-38384
a. Non-nuclear Weapon Delivery Manual
b. Aircrew Nuclear Bomb Delivery Manual (Strategic Bomber Aircraft)
c. Aircrew Nuclear Missile Delivery Manual (Strategic Bomber Aircraft)
d. Aircrew Nuclear Bomb Delivery Manual (Tactical Aircraft)
e. Non-nuclear Weapon Delivery Checklist
f. Nuclear Weapon Delivery Checklist (Strategic Bomber Aircraft)
g. Aircrew Nuclear Bomb Delivery Checklist (Tactical Aircraft)
h. Non-nuclear Weapon Delivery Source Data Packages
10. Work Unit Code Manual
a. Standard WUC Manual
b. Two Chapter Manual
c. Three Chapter Manual
MIL-DTL-38769
11. Calibration Procedures MIL-DTL-38793
12. Time Compliance Technical Orders (TCTOs)
a. TCTO
b. TCTO Supplement
MIL-DTL-38804
13. Aircraft Battle Damage Assessment and Repair TOs MIL-DTL-87158
14. Illustrated Parts Breakdown MIL-DTL-38807
15. On-Equipment Organizational Maintenance Manual Set MIL-DTL-83495
a. General Equipment (GE) Manual
b. General System (GS) Manuals
c. Combined GE & GS Manual
d. Job Guide (JG) Manuals
e. Fault Reporting (FR) Manual
f. Fault Isolation (FI) Manual
g. Wiring Data (WD) Manual
h. Schematic Diagram (SD) Manual
TMSS REQUIREMENTS FOR THE A-10 Thunderbolt Advanced Wing Continuation Kitting
(ATTACK) Program (System/Component)
Title or Type of Manuals Specification Required
16. Operation and Maintenance Instructions in Work Package Format MIL-DTL-87929
a. Maintenance Manuals
(1) Organizational Maintenance
(2) Intermediate Maintenance
(3) Depot Maintenance
(4) Combined (I&D) Maintenance
(5) On Condition Maintenance
b. Operation & Maintenance Instruction Manuals
c. Special Manuals
(1) Aircraft Engine Testing and Trending Procedures
(2) Aircraft Power Package Testing Procedures
(3) Static Firing of Missile Motors
(4) System Peculiar Corrosion Control
(5) Nondestructive Inspection (NDI)
(6) Aircraft Structural Integrity Program (ASIP)
(7) ATE Operator Test Procedures
(8) Special Requirements for Storage and Maintenance Procedures;
AUR Munitions/Launchers and Associated Support Equipment, Conventional Components and CMBR Agents
(9) Parachute Packing Procedures
(10) Operators Instructions (Hand-Held Flight Computers)
(11) Installation-Engineering Facility (Ground C-E Equipment)
d. Checklists (IAW MIL-DTL-5096)
e. With Illustrated Parts Breakdown
17. Commercial Manuals (Evaluate according to MIL-PRF-32216)
18. Aircraft Cross-servicing Guide MIL-DTL-22202
TABLE 2
SUSTAINMENT/MODIFICATION UPDATES TM TYPE SELECTIONS
NOTES:
• Check all applicable boxes.
• For existing manuals not being updated to latest specification requirements, enter “Same style and format” under the specification heading.
TO Number, Title, or Type of Manual
Specification
Change
Revision
Supple-ment
Supple-mental
TM
Source Data
1. 1A-10C-01
MIL-DTL-
2. 1A-10C-2-1-1
MIL-STD-
38784
3. 1A-10C-2-110-1
MIL-STD-
83495
4. 1A-10C-2-110-1-1
5. 1A-10C-4-34
38807
6. 1A-10C-4-1
7. 1A-10C-4-93
8. 1A-10C-4-94-2
9. 1A-10C-23
10. 1A-10C-4-27
11. 1A-10C-4-29
Supple-
12. 1A-10C-4-32
13. 1A-10C-4-28
14. 1A-10C-4-51
15. 1A-10C-4-24
16. 1A-10C-36
17. 1A-10C-39
18. 1A-10C-3-1
19. 1A-10C-3-1-1
20. 1A-10C-2-27JG-1 MIL-DTL-
21. 1A-10C-2-27JG-2 MIL-DTL-
83495
22. 1A-10C-2-27JG-3 MIL-DTL-
83495
23. 1A-10C-2-27JG-4 MIL-DTL-
83495
24. 1A-10C-2-27JG-5 MIL-DTL-
83495
25. 1A-10C-2-27JG-6 MIL-DTL-
Supple-
26. 1A-10C-2-29JG-1 MIL-DTL-
83495
27. 1A-10C-2-51JG-3
28. 1A-10C-2-51JG-5-1
29. 1A-10C-2-94JG-8 MIL-DTL-
30. 1A-10C-520 MIL-DTL-
38804
TABLE 3 – LINEAR TM DELIVERY REQUIREMENTS
FOR A-10 Thunderbolt Advanced Wing Continuation Kitting (ATTACK)
(System/Item)
NOTES:
• For Paper media delivery indicate required quantity
• For all other media types indicate (Y)es or (N)o
• TCTO requirements are specified in the contract vehicle approving the TCTO.
If “Other” is selected, define media type and quantities: ________________
DELIVERY SCHEDULE
Event Number of days data required prior to event
In Process Review(s)
(10 Working Days)
Verification
(5 Working Days)
Prepublication Review
(10 Working Days)
Final TO Distribution
Enter physical mailing address, electronic delivery location or web access point
AFLCMC/WWALE
Attn: Tammy Heslop 6067 Box Elder Lane, Bldg 1284 Hill AFB, UT 84056-5811
Paper/
SGML/
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
AFLCMC/WWALE
Attn: Len Mian 6067 Box Elder Lane, Bldg 1284 Hill AFB, UT 84056-5811
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
Paper/
SGML/
IPDF / 1
XML /
Other/
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
Other/
Paper/
SGML/
IPDF /
XML /
Total Paper Copies Required: I/C/W-2
SECTION 3. SPECIFICATION/STANDARD INTERFACE RECORDS (SIRS)
NOTES:
• All TMSS applicable to this contract shall have an appropriately tailored SIR attached to this section.
• SIRs included in the untailored TMCR format represent the minimum tailoring requirements that must be included in the final contract, unless the entire SIR is not applicable; e.g., if MIL-DTL-22202D is not required, the entire SIR can be deleted.
• Utilize the TMSS Tailoring Tool located at https://techdata.wpafb.af.mil/tmss/index.html by selecting all applicable TMSS requirements, and the desired tailoring options expressed in paragraphs 6.2. Attach the TMSS Tailoring Tool spreadsheet output in the specified section listed below.
• Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from Acquisition Streamlining and Standardization Information System (ASSIST) web page, https://assist.dla.mil/online/start/index.cfm.
• TMSS entries designated with A, F, M or N refer to Army, Air Force, Marine Corps or Navy requirements.
• Comments (recommendations, additions, deletions) and any pertinent data which may be in use in improving Air Force
TMSS documents should be submitted to AFLCMC/HIAM, 4170 Hebble Creek Road, Bldg. 280, Door 15, Area A, Wright-Patterson AFB, Oh 45433-5653 or by email to; SGMLsupport@us.af.mil. Do not include the street address, a building number or a zip+4.
SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-DTL-22202D, 31 March 1999
Supplement 1, 31 March 1999 Manual, Technical, Aircraft Cross-Servicing Guide, Preparation of
The requirements of 6.2 are met in this SIR (see below).
1.1 In addition to paper delivery, when this specification is used to develop digital delivery files (document type definitions – DTDs) contact the PA for additional instructions.
2.3 Ensure the listing for STANAG/ASCC Air Standard Documents is current. List applicable STANAG/ASCC Air Standards below.
(List STANAG/ASCC Air Standard Documents here.)
2.2.1 (Added) “Other Government documents, drawings, and publications.”
DEPARTMENT OF DEFENSE
DODM 5200.1 DOD Information Security Program DOD 5220.22-M National Industrial Security Program Operating Manual
4. Replace with: “4. VERIFICATION.”
“All cross-servicing guides shall meet the requirements of sections 3 and 5 of this specification, as required by the acquiring activity. The requirements set forth in this specification shall become a part of the Contractor’s overall inspection system or quality program. The absence of any requirements in this specification shall not relieve the Contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Use of sampling inspections shall be at the discretion of the Contractor, and in accordance with commercially acceptable quality assurance procedures. However, use of sampling in QA procedures does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.”
https://techdata.wpafb.af.mil/tmss/index.html https://assist.dla.mil/online/start/index.cfm mailto:SGMLsupport@us.af.mil
5. Replace with: “5. PACKAGING.”
“5.1 Packaging Requirements. For acquisition purposes, the packaging requirements shall be as specified in the contract or order. When the actual packaging of material is to be performed by DoD personnel, these personnel need to contact the responsible packaging activity to determine packaging requirements. Packaging requirements are maintained by the Inventory Control Point’s packaging activity within the Military Department’s System Command. Packaging data retrieval is available from the Military Department’s or Defense Agency’s automated packaging files, CD-ROM products, or the responsible packaging activity.”
“5.1.1 Encoded Computer Products. Packaging of encoded computer products for delivery shall be in accordance with the requirements of MIL-STD-1840C, Automated Interchange of Technical Information.”
“5.1.2 Classified Material. Classified material shall be packaged and identified in accordance with DODM 5200.1, DOD 5220.22-M, and the implementing Service regulations.”
6.2a Title, number, and date of the specification are listed above.
6.2b Issue of DODISS: (fill in issue of DODISS applicable to this contract) 6.2c Packaging requirements (see above).
6.2d Verification requirements (see above).
Specification/Standard Interface Record for A-10 Thunderbolt Advanced Wing Continuation Kitting
(ATTACK)
The TMSS Tailoring Tool will be used to specify all Project SIR 6.2 options. It can be accessed utilizing the following URL https://techdata.wpafb.af.mil/tmss/index.html. The user will attach the output of the tailoring tool under the Project SIR Requirements heading listed below.
PROJECT SIR REQUIREMENTS
https://techdata.wpafb.af.mil/tmss/index.html
ATTACHMENT 1
Graphics Format Guidelines
GENERAL GUIDELINES
• Single column graphics should not exceed 51 Picas High by 20 Picas Wide. (Paper only)
• Full page graphics should not exceed 51 Picas High by 42 picas Wide. (Paper only)
• Fold Out graphics should not exceed 51 Picas High (width on foldouts is not important). (Paper only)
Encapsulated Post Script (EPS):
• Raster based images will not be saved as EPS.
• EPS files shall not be a mix of vector and raster images. Vector only.
• Any source data (photos used for tracing etc.); used in aiding of creation of EPS (templates, etc.)
will be deleted from illustration prior to saving/exporting.
• If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues.
Tagged Image File Format (TIFF):
• Black and white raster images should only be saved as Bitmap and not Grayscale, RGB or
CMYK.
• Grayscale or Color images (screenshots, etc.) will be saved as such (Grayscale, RGB or CMYK) and will not be bitmap converted using a halftone screen.
• To further aid in file size reduction for storage purposes, images should be compressed using
Group 4 compression when saving/exporting.
Computer Graphics Metafile (CGM):
• Raster based images will not be saved as CGM.
• Any source data used in aiding of creation of CGM (templates, etc.) will be deleted from illustration prior to saving/exporting.
• CGM files shall not be a mix of vector and raster images. Vector only.
• If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues.
• Unless Version 4 is specifically required for hotspots and/or hyper linking, CGMs should be exported as version 3 to increase cross platform compatibility.
DWG File Format:
• Raster based images will not be saved as DWG.
• DWG files shall not be a mix of vector and raster images. Vector only.
• Any source data used in aiding of creation of DWG (templates, etc.) will be deleted from illustration prior to saving/exporting.
• If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues.
Joint Photographic Expert Group (JPEG):
• JPEG File format should be used as last resort. Color screenshots/photos should be saved as
TIFFs due possible system compatibility issues.
• B&W Bitmaps should not be saved as JPEGs.
Portable Network Graphics (PNG):
• Used for raster graphics
• Supports lossless data compression
Bitmap (BMP):
• Used for raster graphics
Scalable Vector Graphic (SVG)
• Two-dimensional vector and mixed vector/raster graphics
ATTACHMENT 2
REQUEST FOR TECHNICAL ORDER NUMBER
1. *PRIME SYSTEM APPLICATION (If Applicable or N/A)_______________________________
2. *CONTRACT NUMBER/PURCHASE REQUEST (PR) NUMBER: _____________________
3. *MISSION DESIGN SERIES/NOMENCLATURE (Name Of Equipment) __________________
4. *FEDERAL STOCK CLASS:_______________________________________________________
5. *PART NUMBER(s):______________________________________________________________
6. *NSN/FSN: (or temp NSN) __________________________________________________________
7. *PUBLICATION TYPE (Opn & Maint with IPB, Overhaul, WUC, IPB, LOAP, etc.)
8. *SUGGESTED TECHNICAL ORDER NUMBER:_____________________________________
9. *RECOMMENDED TITLE OF MANUAL (Leave Blank if Classified) ____________________
10. *CLASSIFICATION OF MANUAL: ________________________________________________
11. *CLASSIFICATION OF TITLE: ___________________________________________________
12. *KIND OF EQUIPMENT (Airborne / Ground / Not Applicable):___________________________
13. *TEST EQUIPMENT? Yes / No
14. PROGRAM ELEMENT CODE (PEC): ________________________________________________
15. LEAD COMMAND: _______________________________________________________________
16. DOES MANUAL EXIST FOR SAME/SIMILAR EQUIPMENT? Yes / No
17. EXISTING MANUAL TO NUMBER: _________________________________________________
18. COMMERCIAL OFF THE SHELF (COTS) ITEM: Yes / No
19. CONTRACTOR INFORMATION: (If Applicable)
a. NAME OF VENDOR: _____________________________________________________
b. ADDRESS: _____________________________________________________________
c. MANUFACTURER'S CODE: ______________________________________________
d. POINT OF CONTACT: ____________________________________________________
20. FOREIGN MILITARY SALES (FMS) YES ___ NO ____ (If YES, complete item 21)
21. COUNTRY CODES (For CSTO/FMS manuals): (See TO 00-5-19) __________________________
22. COMMENTS:______________________________________________________________________
* = Mandatory Field
| Section 1. Technical Order (TO) Program Requirements |
| Project SIR Requirements |
File details come from the government source that posted it. Updated .