RFP_Attachment_12-Performance_Work_Statement.pdf
PDF 559 KB Posted
- Attached to
- A-10 Technical Order Engineering Support
- Solicitation number
- FA8202-16-R-1000
About this file
Attachment 12 - Performance Work Statement
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12
Performance Work Statement (PWS) for
A-10 Technical Order Engineering Support
29 March 2016
Rev 1, 12 September 2016
Prepared by:
AFLCMC/WWALE
Fighter/Bomber Directorate
Hill AFB, Utah 84056
CHANGE RECORD
PWS
Section
Pages Revision
TOC 2 1
Acronym 1 1
1.2 2 1
2.1.3 4 1
2.1.5 5 1
2.1.7 6 1
3.0 6 1
3.0.1 6 1
3.1 6-7 1
3.2 7 1
3.2.2 8 1
3.2.3 8 1
3.3.1 8 1
3.3.2.1 9 1
3.3.5 9-10 1
3.4 10 1
3.5 10 1
3.5.1 10 1
3.6 10 1
3.7 10 1
4.0 11 1
4.1 11 1
4.2 11 1
4.3 11 1
4.4 11 1
4.5 12 1
4.6 12 1
4.7 12 1
5.0 13 1
6.0 13 1
6.1 15 1
6.1.4.2 15 1
6.1.5.2 15 1
7.1 16 1
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Background
2.0 REFERENCE DOCUMENTS
2.1 Government Documents
2.1.1 Department of Defense Specifications
2.1.2 DoD Standards
2.1.3 Other Government Publications
2.1.4 Air Force Instructions and Air Force Material Command Instructions
2.1.5 USAF TOs
2.1.6 Forms
2.1.7 Other Documents
3.0 REQUIREMENTS
3.0.1……Contractor Performance Objectives………………………..……………………….6
3.1 Contractor Requirements
3.2 Technical Order Support Services
3.2.1 Engineering and Logistics Support
3.2.2 Engineering Analysis and Trade Studies
3.2.3 Data and Software Assessment
3.2.4 Technical Support for Technical Order Improvement Projects
3.2.5 Technical Support to Assess Source Data
3.3 Technical Order Sustainment Services
3.3.1 Technical Order Sustainment
3.3.2 Sustainment Delivery
3.3.2.1 Routine Changes…………………………………………………………………..9
3.3.2.2 Urgent Changes……………………………………………………………………9
3.3.2.3 Emergency Changes……………………………………………………………….9
3.3.3 Time Change Technical Order (TCTO) Development Support
3.3.4 Redline Text
3.3.5 Technical Order Development
3.4 Block Cycle Update
3.5 Rapid Action Change Delivery
3.5.1 Priority out of Cycle Changes
3.6 Data Management
3.7 Interactive Wiring Diagrams
3.8 Information Assurance Training and Workforce Management
4.0 MIL-STD-1808/S1000D CONVERSION, MIGRATION, SUSTAINMENT, AND
DATA MANAGEMENT
4.1 MIL-STD-1808 Compliance
4.2 Legacy Data Cleanup
4.3 Quality Control
4.4 Compliance with latest MIL specs……………………………………………………..12
4.5 S1000D Phased Delivery of Data….………………………………………………….. 12
4.6 TeamCenter Data Incorporation………………………………………………………..12
4.7 S1000D/MIL-STD-1808 Training………………………………………………………12
5.0 SERVICE SUMMARY…………………………………………………………………13
6.0 DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE
6.1 Program Management Support
6.1.1 Program Management……………………………………………………………..14
6.1.2 Program Management Plan………………………………………………………..14
6.1.3 Integrated Master Schedule………………………………………………………..15
6.1.4 Transition………...………………………………………………………………..15
6.1.4.1 Phase-In………………………………………………………………………15
6.1.4.2 Phase-Out…………………………………………………………………….15
6.1.5 Meetings…………………………………………………………………………..15
6.1.5.1 Kick-off Meeting……………………………………………………………..15
6.1.5.2 Program Status Review/Technical Interchange Meetings……………………15
6.1.5.3 Technical Order Rewrite/Flight Manual Review Conference (FMRC) Spt….16
6.1.5.4 Integrated Product Team (IPT) Meetings……………………………………16
7.0 SPECIAL CONSIDERATIONS………………………………………………………..16
7.1 Security……………………………………………………………………………….16
7.2 Access to Facilities and Property……………………………………………………..17
7.3 Base Support - Government Provided Office Space………………………………….17
7.4 Government Program and Contract Management…………………………………
7.4.1 Government Program Management……………………………………………..17
7.4.2 Government Contract Management……………………………………………...17
8.0 TRAVEL REQUIREMENTS
9.0 CONTRACTING OFFICER REPRESENTATIVE
ACRONYM LIST
ACO Administrative Contracting Officer
AFI Air Force Instructions
AFMCI Air Force Material Command Instructions
AIS Automated Information Systems
BCU Block Cycle Update
BCR Block Cycle Release
CAC Common Access Card
CDRL Contract Data Requirements Lists
CONOP Concept of Operations
COR Contracting Officer Representative
DoD Department of Defense
DSS Digital Support Suite
DTD Document Type Definition
ETIMS Enhanced Technical Information Management System
FAT First Articles to be Test
FMRC Flight Manuel Review Conference
FOSI Formatted Output Specification Instance
GFE Government Furnished Equipment
GFI Government Furnished Information
GFM Government Furnished Material
GFS Government Furnished Software
IAW In Accordance With
ILS Integrated Logistics Support
IMS Integrated Master Schedule
IPT Integrated Product Team
ITPS Identifying Technical Publications Sheet
OFP Operational Flight Program
OOC Out of Cycle Changes
PCO Procurement Contracting Officer (Government)
PCR Proposed Change Request
PLM Product Lifecycle Management
PM Program Manager
PMP Program Management Plan
PNDB Part Number Database
POOC Priority Out of Cycle
PIWG Product Improvement Working Group
PWS Performance Work Statement
RAC Rapid Action Change
SGML Standard Generalized Markup Language
SPO System Program Office
TCTO Time Compliance Technical Order
TMSS Technical Manual Specifications and Standards
TO Technical Order
TOMA Technical Order Management Agency
WBS Work Breakdown Structure
XML eXtensible Markup Language
1.0 INTRODUCTION
1.1 Purpose
The purpose of this effort is to provide non-personal technical services to the A-10 System
Program Office (SPO) in support of A-10 Technical Order (TO) sustainment activities, support the goals of AFLCMC/WWALE technical order platforms, and deliver technical expertise in direct support of Air Force TO Concept of Operations (CONOPs) by providing user friendly, technically accurate, and up-to-date digital technical data at the point of use that is acquired, sustained, distributed and available in digital format for all technical data users.
1.2 Scope
The PWS requirements described herein identify the contractor technical support required by the
A-10 SPO Technical Support Branch. Technical and engineering data processes and services are to be provided in the following major categories:
Engineering and Logistics Support
Trade Studies
Data and Software Assessment
Technical support required for technical order improvement projects
Development of enhanced technical data tools
TO Development and Sustainment
1.3 Background
The A-10 SPO, Technical Support Branch (AFLCMC/WWALE), serves as technical advisor to the warfighter for resolving complex and sophisticated equipment problems of weapon systems employed around the globe. Branch personnel manage technical aspects of major systems, subsystems and equipment improvements, maintainability, reliability and development of data on existing equipment and modifications. Finally, they evaluate operational capability of systems/equipment and recommend tests, modifications, and corrections to design deficiencies.
TO Managers of this Branch are involved with development of information and analysis to select and present information on the specialized subject in a form and at a level suitable for the warfighter customer. They draw on a substantial knowledge of a particular subject-matter area in the development of training, operating, or maintaining manuals associated with assigned weapon systems. TOs are distributed world-wide to Air Force users and are vital elements that constitute a total weapon system. TOs are used by pilots to fly aircraft, by maintenance personnel to maintain and service equipment both in a combat and non-combat environment and are used by depot technicians to rebuild and rework equipment.
2.0 REFERENCE DOCUMENTS
The following documents are part of this PWS to the extent identified herein; applicability to the most recent version unless otherwise specified. In the event of a conflict is found, the Contractor shall seek Government direction.
2.1 Government Documents
Department of Defense Specifications
Department of Defense (DoD) Specifications can be accessed through the Air Force Technical
Manual Specifications and Standards web site: https://techdata.wpafb.af.mil/tmss/index.html.
https://techdata.wpafb.af.mil/tmss/index.html
Publication
Number
Title Basic Date Latest Chg
Number
Latest Chg
Date
MIL-DTL-7700H Flight Manuals, Air
Refueling Procedures, and Abbreviated
Checklists
13 May 2002 25 Apr 2014
MIL-DTL-87929D Work Package 1 Feb 2002 20 Apr 2012
MIL-DTL-9977M Manuals, Technical and
Checklists:
Munitions/Weapons
Loading Procedures, Nonnuclear and Nuclear and Packages, Standard
Data: Munitions Loading
Procedures, Nonnuclear
28 May 2015
MIL-DTL-38384E Checklists and Source
Data Packages, Aircraft
Weapon Delivery
10 Sep 2014
MIL-DTL-38769F Work Unit Codes -
Preparation of
25 Sep 2015
MIL-DTL-38804D Time Compliance
Technical Orders
10 Nov 2014 Amend 1 10 Nov 2014
MIL-DTL-38807D Illustrated Parts
Breakdown
17 Sep 2012
MIL-DTL- 5096G Inspection and
Maintenance
Requirements;
Acceptance and
Functional Check Flight
Procedures and
Checklists; Inspection
Work Cards; and
Checklists
6 Feb 2014
MIL-DTL-5920G Sample Basic Weight
Checklists and Loading
Data
15 May 2015 Amend 1 15 May 2015
MIL-DTL-8031H List of Applicable
Publications (LOAPS) -
Preparation
11 Aug 2014
MIL-DTL-83495D On-Equipment
Maintenance Manual Set
24 Nov 2015
MIL-DTL-9854E Structural Repair
(Aircraft)
10 Jan 2015
MIL-DTL-87268D Manuals, Interactive
Electronic Technical -
General Content, Style, Format, and User-
Interaction Requirements
22 Sep 2014
DoD Standards
Publication
Title Basic Date Latest Chg
Number
Latest Chg
Date
MIL-STD-38784A Standard Practice for
Manuals, Technical:
General Style and
Format Requirements
25 Aug 2011
DLM 4000.25,
Volume 1
Concepts and
Procedures
13 Jul 2012 Change 2 23 Oct 2015
DoDi 5220.22 National Industrial
Security Program
(NISP)
18 Mar 2011
DoDMi 4140.01 DoD Supply Chain
Material Management
Procedures
10 Feb 2014
Other Government Publications
Publication Number Title Basic Date Latest Chg
Latest Chg
Date
MIL-HDBK-38790 Printing Production of
Technical Manuals
24 Feb 1997 Notice 2 19 Jan 2013
MIL-HDBK-863A Handbook for Wiring
Data and System
Schematic Diagrams
Preparation of
13 Oct 2015
PDF Digital Weapons
Checklist Requirements
12 Sep 2016
Air Force Instructions and Air Force Material Command Instructions
Latest Chg
Date
AFMCI 21-401 Engineering Data
Storage, Distribution and Control
12 Mar 2015 30 Mar 2015
AFI 31-101 Air Force Installation
Security Notice (FOUO)
01 Mar 2003 8 Oct 2009
AFMAN 31-116 Air Force Motor
Vehicle Traffic
Supervision
9 May 2012
AFI 16-1404 Information Security
Program Management
29 May 2015
Latest Chg
Date
AFI 11-215 Flight Manuals Program 22 Dec 2008
AFI 63-101/20-101 Integrated Lifecycle
Management
7 Mar 2013 Change 2 18 Sep 2015
AFMCI 23-103 Diminishing
Manufacturing Sources and Materiel Shortages
(DMSMS) Program
13 Oct 2000
AFH 36-2235V2 Information For
Designers Of
Instructional Systems
2 Sep 2002
USAF TOs
Latest Chg
Date
TM-86-01N Technical Manual
Contract Requirements – tailored for the A-10
Program
01 Apr 2009
TO 00-1 United States Air Force
TO Catalog
01 Jul 2004
TO 00-5-1 AF Technical Order
System
01 Oct 2014
TO 00-5-3 AF Technical Order Life
Cycle Management
01 Apr 2015
TO 00-5-15 TCTOs 22 Sep 2014
TO 00-5-18 AF Technical Order
Numbering System
01 Oct 2015
PDF Flight Manual
Hyperlinking
Requirements
12 Sep 2016
Forms
If necessary, the responsible Contractor or TO Manager shall ensure latest revisions of all forms are completed IAW corresponding directives as follows:
Form Number Form Title Directive
Document
Basic Date
AFTO Form 276 Special Requisition for
Air Force Technical
Order
TO 00-5-2 01 Apr 2001
DD Form 1348-1A Issue Release/Receipt
Document
DoD 4000.25-1-M 1 Jul 1991
AFTO Form 158 Technical Order Review
Comment Sheet
13 Aug 2008
Form Number Form Title Directive
Document
Basic Date
AFTO Form 22 Technical Manual
Change Recommedation and Reply
15 May 2013
AFTO Form 252 Technical Order
Publication Change
Request
27 Jun 2012
Other Documents
Latest Chg
Date
S1000D International
Specification for
Technical Publications utilizing a Common
Source Database
Issue 4.1 1 Aug 2008
MIL-STD-1808C DoD Interface Standard
System Subsystem Sub-
Subsystem Numbering
24 Jan 2014 Change 1 2 Sept 2016
TOCR Technical Order
Conversion
Requirements
Revision 2 17 Oct 2009
TOLCMP Tech Order Life Cycle
Management Plan
25 Feb 2014
Currently, TMSS is not accessible by non-CAC holders. For access to TMSS material, non-
CAC holders shall contact the TO Program Manager requesting the specific material required, and the TO Program Manager will provide the appropriate material. CAC holders will have access to the TMSS website and will be able to maintain a normal relationship with TMSS website and TMSS personnel. The contractor will be granted CACs as required, see Section 7.1.
3.0 REQUIREMENTS
The Contractor shall provide engineering/technical services for the efforts described within
Section 3 below. The Contractor shall perform all work in accordance with standard policies and procedures as listed in Section 2.0. All required deliverables are delineated in subparagraphs. The documents shall be prepared IAW the Contract Data Requirements Lists (CDRLs), DD Form
1423-1. Unless otherwise designated, all deliverable documents shall be submitted to the
Government via electronic means as Microsoft compatible email attachments. The Air Force reserves the right to review and audit Contractor’s compliance to those procedures identified herein.
3.0.1 Contractor Performance Objectives
A-10 SPO will issue task orders for servicies in support of this PWS. When performing individual task orders, the contractor shall utilize an integrated approach to efficiently meet all requirements of each task order.
3.1 Contractor Requirements
The Contractor shall provide technical order consulting and support services as well as product development and sustainment services with the following skills for the effort detailed throughout
Section 3. The contractor shall perform tasks in accordance with separately issued task orders, as specified therein.
Extensive working knowledge in all areas of TO usage, development, sustainment, distribution, management and STINFO requirements. Extensive working knowledge of USAF technical data digitization standards, policies, procedures and processes.
Skill with PTC Epic Editor software and screen FOSI development
Skill with PTC IsoDraw software
Skill with developing Omnimark scripts and XSL transformations
Skill with Part Number Database (PNDB)
Skill with S1000D formatting, editing, and publishing using viewers such as Arbortext®
IETP
Skill with MIL-STD-1808 including legacy data
Skills with IPDF
Skill with developing and sustaining technical orders, technical architecture, and style formatting specifications (spec bundles) in support of A-10 Technical Orders
The Government will not dictate use of specific software for technical data digitalization, nor will specific software be provided by the Government. Knowledge of programs discussed above is required due to already existing software infrastructures. TO conversion from the currently utilized software to the contractor’s preferred software may be required during the performance of this contract. If the contractor’s software is not the current TO sustainment software, a contractor validation and a government verification shall be required.
3.2 Technical Order Support Services
The Contractor shall assist the Government program management staff on data development, conversion/migration, sustainment, usability, distribution processes, and management activities by providing expertise related to technical data standards and processes as identified by individual task order. The Contractor shall provide support and representation for the A-10 TO Sustainment program in technical and policy functions as requested by the A-10 SPO Technical Support Branch
PM. Technical Support can include, but not limited to:
Engineering and Logistics Support
Trade Studies
Data and Software Assessment
Technical support required for technical order improvement projects
Development of enhanced technical data tools
Source data review relating to A-10 technical data management requirements
Deliverables required:
CDRL Sequence No. A004 Technical Report – Study/Services
CDRL Sequence No. A005 Scientific and Technical Reports
Engineering and Logistics Support
The Contractor shall provide assessment of source data provided in support of related A-10 aircraft modifications for technical accuracy, engineering completeness, schedule viability, and specification conformance. The Contractor shall coordinate with other support entities (i.e. TO
Integrated Logistics Support (ILS)) while performing tasks. This includes integration with, data cleansing, Product Lifecycle Management (PLM), and organic software and hardware development activities.
Engineering Analysis and Trade Studies
The Contractor shall provide engineering analysis and trade studies as requested by the AF TO
Program Manager to support PWS technical data efforts. The Contractor shall provide support in the development and execution of digital data support strategies and data management efforts. The
Contractor shall assess emerging technologies and initiatives to determine their application to existing Technical Order support requirements. These include software engineering assessments, computer hardware and software technology assessments, standardization assessments, configuration item/software documentation assessments, and accompanying life cycle cost projections. Examples of trade studies in support of the PWS would include alternate file format investigations, assessments of TMSS specification updates, schedule optimization of Block Cycle
Updates (BCUs) with major modifications, and usability studies for alternate presentation devices.
Design data and calculations used for Engineering Analysis and Trade Studies shall be documented. (CDRL A004)
Data and Software Assessment
The Contractor shall provide engineering and design expertise in supporting USAF TMSS Digital
Support Suite (DSS) changes, and shall provide recommendations on A-10 TMSS DSS use cases representing Air Force interests. The Contractor shall provide data and software assessment associated with PWS technical elements including document type definition (DTD), formatted output specification instance (FOSI), schema, and GFI software. Design data and calculations used for software assessment shall be documented. (CDRL A005)
Technical Support for Technical Order Improvement Projects
The Contractor shall provide technical support for Technical Order improvement projects to include technical order rewrites to accommodate data consolidation and usability improvements.
The Contractor shall provide subject matter expertise to accommodate these efforts. (CDRL
A005)
Technical Support to Assess Source Data
The Contractor shall assess the source data provided in support of A-10 aircraft modifications for technical accuracy, engineering completeness, schedule viability, and specification conformance.
(CDRL A005)
3.3 Technical Order Sustainment Services
Technical Order Sustainment
The Contractor shall provide support in the conversion, integration, development and/or incorporation of Technical Order sustainment and modification requirements as identified by individual task order. The Contractor shall provide conversion services to update from paper or electronic source data into a format specified by the TO Manager and/or government technical manager designee(s). The Contractor shall assist in source data exchange with TO modification contractors to support modification schedules by providing tagging guidelines and TO source files when required by the System Program Manager/TO Management Agent (TOMA). The Contractor shall furnish all labor, equipment, and other services necessary to deliver the required products.
Support to be provided includes:
A-10 TO and flight manual updates
Creation of technical data
Digitization of existing technical data
Preparation of TCTOs
Sustainment Delivery
Preparation of flight manual supplements, maintenance manual supplements, Identifying
Technical Publications Sheet (ITPS)
Sustainment Delivery
The Contractor shall edit and maintain TOs to support routine, urgent, and emergency changes in both electronic and hard copy IAW TO 00-5-3.
3.3.2.1 Routine Changes
Routine changes shall be denoted on the receipt of AFTO Form 252s. Routine deliveries shall be delivered as an update package only during the BCU delivery unless an out-of-cycle task order is requested by the Technical Order Management Authority (TOMA).
3.3.2.2 Urgent Changes
Urgent changes shall be completed and ready for shipping in five (5) working days. The Contractor shall be notified prior to task order issuance identifying an accelerated task order and of any unique
Rapid Action Change (RAC) delivery requirements.
3.3.2.3 Emergency Changes
Periodically, emergency TO update requirements dictate that accelerated delivery time parameters are necessary to satisfy using command priority operation and maintenance schedules. The Contractor shall deliver an emergency change within two (2) days for safety of personnel/damage to equipment or three (3) days for work stoppage after receipt of Government furnished source data. The Contractor shall be notified prior to task order issuance identifying an accelerated task order and of any unique
RAC delivery requirements.
Time Change Technical Order (TCTO) Development Support
The Contractor shall provide TCTO development support for routine, urgent, and emergency type requirements IAW T.O. 00-5-1, T.O. 00-5-3, T.O. 00-5-15, and MIL-PRF-38804C. The Contractor
QA reviewed TCTOs shall be delivered in the Enhanced Technical Information Management System
(ETIMS) compatible format to the Government.
Redline Text Redline text changes that are identified as a result of Government pre-publication reviews or additional changes required to other TO as a result of BCUs, Out of Cycle Changes (OOCs), RACs or other
Government-directed changes will be provided to the Contractor for final update to the TO prior to delivery.
Technical Order Development
The Contractor shall create Technical Order data using SGML/XML, or other adopted standards, with appropriate TMSS DTDs. The Contractor shall prepare line drawings, schematics, and diagrams for incorporation into the Technical Order data. The Contractor is responsible for incorporating changes derived from AFTO 22/AFMC 252s into the existing TO baseline. The
Contractor is responsible for incorporating validated source data (aircraft modifications and A-10
Operational Flight Program (OFP) Suite upgrades) into the existing TO baseline maintained in
Enhanced Technical Information Management System (ETIMS). The Contractor shall parse and compose SGML/XML-tagged TO document files prior to delivery to the Government.
The Contractor shall verify that tagging has been accomplished to the levels provided in the DTDs and the content fulfills directives in the appropriate specifications and standards. Composed instances shall be compatible with the appropriate TMSS DSS. The Contractor shall prepare and deliver all First Articles Test (FAT) by TMSS at Wright-Patterson AFB for compliance with Air
Force requirements and report findings to the Government. (CDRL A005)
3.4 Block Cycles
The Contractor shall deliver a complete Block Cycle Update (BCU) required by the TOMA as identified by individual task order. The Contractor shall provide a secure means for two-way pre-publication transmittal (i.e., SharePoint) from Contractor to Government and Government to
Contractor for the BCU to AFLCMC/WWALE via the TOMA. Inspection and acceptance shall be IAW TO 00-5-1. The final publication deliverable shall be via CD/DVD. A-10 SPO is currently on three (3) Block Cycle Releases (BCR) a year which is subject to change as directed by the TO
Program Manager. The BCRs typically fall on February, June, and October. Because the block cycle timelines overlap, the Contractor shall be required to receive and store files (Government work in progress files - pending Proposed Change Requests (PCR) and attachments) related to the subsequent block cycles.
3.5 Rapid Action Change Delivery
The Contractor shall prepare RACs in conformance with USAF TMSS and A-10 TO policy (TO
00-5-3) as identified by individual task order. RACs are intended to fulfill urgent and emergency update requirements to electronic technical manuals when published information is required to be fielded prior to a scheduled BCU. RACs shall be delivered by the Contractor through secure electronic processes (per paragraph 3.4). The Government anticipates utilizing a RAC delivery no more than three (3) times during a twelve month period.
Priority out of Cycle Changes
The Contractor shall adhere to Government direction on the prioritization of large tech order changes that cannot wait until normal BCU dates due to immediate need requirements as identified by individual task order. As these large workloads are prohibitive to meet normal RAC time limits, they will be processed as Priority Out of Cycle changes (POOC) to meet the needs of the end-users. The government anticipates utilizing a Priority Out of Cycle delivery no more than twenty-five (25) times during a twelve month period.
3.6 Data Management
The Contractor shall establish and maintain a complete, comprehensive data repository for all A-
10 technical data to include an archive section for prior version of the technical data as identified by individual task order. The Contractor shall design, develop, and deliver a method for secure delivery of interim, review, and final deliverables. (CDRL A005)
3.7 Interactive Wiring Diagrams
The Contractor shall create and maintain vectorized interactive wiring diagrams in accordance with current publications of the 1A-10C-2-110-1 and 1A-10C-2-110-1-1 technical orders as identified by individual task order. The Contractor shall provide fully functional interactive wiring diagrams compatible with a standard web browser. (CDRL A005)
3.8 Information Assurance Training and Workforce Management
The Contractor shall comply with all computer and network access requirements and instructions including DoD Directive 8570.1, Information Assurance Training, Certification, and Workforce
Management.
4.0 MIL-STD-1808 Conversion/S1000D, Migration, Sustainment, and Data
Management
The contractor shall update the current TO Life-Cycle Management Plan (TOLCMP), in accordance with TO 00-5-3, prior to the migration and conversion to MIL-STD-1808/S1000D.
(CDRL A006)
The contractor shall provide a PWS revision to this section (4.0) which will consider requirements as discussed below in sections 4.1-4.7. (CDRL A006)
The Contractor shall convert the current A-10 TO library from SGML to S1000D specifications for publication as identified by individual task order. The contractor shall correct any existing legacy errors or duplication of data as part of the conversion to S1000D.
4.1 MIL-STD-1808 Compliance
The contractor shall migrate the current library up to current MIL-STD-1808 compliance as identified by individual task order. The contractor shall correct any legacy issues to ensure the
MIL-STD-1808, System Subsystem Sub-Subsystem Numbering (SSSN) is implemented correctly and accurately to the entire A-10 maintenance TO library.
4.2 Legacy Data Cleanup
Contractor shall provide a plan for legacy data conversion to ASD S1000D version 4.1 as identified by individual task order. Conversion plan shall provide the following:
a. MIL-DTL-3048, USAF S1000D Business Rules
b. S1000D Business Rules Exchange (BREX)
c. Data module (DM) development and sustainment
d. Data Module Requirements List (DRML) development and sustainment
e. Publication Module development and sustainment
f. Common Source Database (CSDB) Management
g. Legacy applicability tagging that conforms to USAF Business Rules
h. Size of data modules (should be the smallest reusable object, typically follows the break-down of the weapon system’s SNS)
i. Identify potential reuse of data modules
j. Appropriate graphic standard as written by S1000D
k. Distribution and delivery of S1000D
4.3 Quality Control
The contractor shall develop a data validation and reconciliation process to ensure that all required legacy data has been accurately converted to MIL-STD-1808 in USAF compliant
S1000D version 4.1 as identified by individual task order. The contractor shall ensure a comprehensive process that tests the data as it is migrated through different stages to determine whether the converted data is an accurate translation of the existing legacy data sources. (CDRL
A006)
4.4 Compliant with latest MIL Specs.
The contractor shall follow all specification requirements/business rules in S1000D and MIL-
STD-3048 as identified by individual task order. Contractor shall ensure all project level business rules are documented and maintained that cover decision points in S1000D and in MIL-
STD-3048 as well as any other decision point relevant to TO development and delivery for the program.
4.5 S1000D Phased Delivery of Data
The sustainment releases will be combined and incorporated in the first phase of S1000D delivery as identified by individual task order. During the S1000D conversion all modification and sustainment TO changes will be frozen. The second phase delivery will incorporate all aircraft modification and any new sustainment data accumulated during the period while S1000D migration and conversion was in progress. The contractor shall provide all MIL-STD-1808 and
S1000D final data to the government per the Technical Manual Contract Requirements (TMCR) for sustainment after final migration and conversion has taken place. (CDRL A008)
4.6 TeamCenter Data Incorporation
The contractor shall meet the minimum requirements to ensure current data and S1000D data is compatible with USAF TeamCenter PLM environment delivery and creation/updating as identified by individual task order:
A. All S1000D data deliverables in this PWS shall be formatted for import into the A-10
TeamCenter environment using the TeamCenter Content Management module and the
“A-10 Data Exchange Specification” 12-A10DOC-002. Data delivery schedule/frequency requirements are found in the CDRL for each specific task.
a. The contractor shall analyze the A-10 Data Exchange Standard, the TeamCenter
Content Management module requirement and the S1000D requirements to ensure the necessary data elements and structure exist in the A-10 Data Exchange
Specification and the A-10 TeamCenter environment to adequately manage the
TOs and S1000D TO content developed under this effort. The contractor shall propose a implementation plan and changes to the A-10 Data Exchange Standard to be able to store, modify and use these technical orders under CM control in the
A-10 TeamCenter environment (including 252 processing) CDRL (A006).
4.7 S1000D/MIL-STD-1808 Training
The contractor shall provide S1000D MIL-STD-3048, Business Rules/BREX, S1000 Interactive
Electronic Technical Publishing (IETP), and familiarization training for government verification teams as identified by individual task order.
5.0 SERVICE SUMMARY
Performance
Objectives PWS Para. Performance Threshold
Work Performance
Requirements
3.0 All actions accomplished IAW Government-
approved contractor quality assurance plan with
98 percent accuracy.
CDRL Deliverables 3.2.1.1, 3.2.1.3, 3.2.1.4, 3.2.1.5, 3.2.1.6, 3.2.1.7, 3.3, 3.3.4, 3.4, 3.5, 3.5.1, 3.6, 3.11.2
90% reporting accuracy. 90% on time receipt of deliverables.
Incorporated TO
Changes
Routine Changes
AFTO Form 252 with 96 % accuracy.
Deficiencies to be corrected to 100% within 10 working days.
Urgent Changes
5 calendar days from receipt of AFTO Form 252 with 95% accuracy.
Deficiencies to be corrected to 100% upon receipt of errors from the TOMA.
Emergency/Rapid Action Changes
2 calendar days from receipt of AFTO Form 252 for safety changes and 3 calendar days for work stoppage, with 95% accuracy.
Deficiencies to be corrected to 100% upon receipt of errors form the TOMA.
DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE
6.0 Contact Data Requirements Lists (CDRLs)
Paragraph Description CDRL Due Date
6.1.4.2 Conference Agenda A001 2 working days before
milestone/conference/meeting
6.1.4.2 Conference Minutes A002 5 working days after
milestone/conference/meeting
3.3.2, 3.3.3, 3.3.4, , 3.4, 3.5, 3.5.1, 6.1.4.2, Contractor’s Progress, Status, and Management
Report
A003 Bi-weekly, as identified by individual task order
3.2, 3.2.2, 6.1.4.2
Technical Report –
Study/Services
A004 As requested
3.2, 3.2.3, 3.2.4, 3.2.5, 3.3.5, 3.6, 3.7
Scientific and Technical
Report
A005 As requested
Paragraph Description CDRL Due Date
4.0, 4.1-4.7 Program Management Plan
(PWS Revision)
A006 45 calendar days after individual task order award
4.0, 6.1.2, 6.1.2, 6.1.4.1, 6.1.4.2
Program Management
Plan/TOLCMP Update
120 calendar days after contract award and/or as identified by individual task order
6.1.3 Integrated Master Schedule A007 10th of each month for
previous calendar month support
4.5 Technical Manual Contract
Requirements (TMCR)
A008 36 months after task for
S1000D/MIL-STD-1808
migration/conversion has started
6.1 Program Management Support
6.1.1 Program Management
a. The Contractor shall provide for management, planning, financial, and administrative support services, to include schedule, status, and cost reporting for all efforts supported under this contract. The Contractor shall assume responsibility for all technical, cost, schedule, quality, and configuration control program elements for this effort.
b. The Contractor shall generate and maintain documentation libraries, and shall support program reviews.
CDRL Sequence No. A003 Contractors Progress, Status and Management Report
c. The Status Report shall contain:
1) Progress of the previous month
2) Status of contract milestones
3) Sustainment deliverable schedules status by TO for this current, previous and next periods
4) Resource expenditures for the project, issues/concerns and associated recommendations.
d. Contractor shall provide a Government accessible web-based system for electronic delivery of all CDRLs as well as real-time status reporting of all deliverables
6.1.2 Program Management Plan (PMP)
The Contractor shall provide and maintain a PMP. The established PMP shall be updated throughout the program to reflect the current status as identified by individual task order. The
Contractor’s PMP is a supplemental part of the overall TOLCMP. The PMP will include as a minimum, the Contractor’s:
a. Integrated document showing technical, cost and schedule data as they relate to the
PWS. It shall also provide information on the contractor’s organization, practices and techniques to be used in managing the program
b. Issues/concerns and associated program recommendations
c. Staffing profile
d. Quality Assurance Plan
e. Method proposed for electronic delivery for interim deliveries
f. Transition (phase-in/phase-out)
CDRL Sequence No. A006 Program Management Plan
6.1.3 Integrated Master Schedule
The Contractor shall provide an Integrated Master Schedule to reflect TO program milestone accomplishment and change delivery schedules. The Contractor shall coordinate and integrate technical data activities as they pertain to all A-10 Technical Orders including modifications, S1000D migration/conversion, SERP efforts, and rewrites. (CDRL A007)
6.1.4 Transition
6.1.4.1 Phase-In
If there is a change in Contractor, the new Contractor shall coordinate with the incumbent contractor to establish a secure method for receiving and storing the entire historic TO baseline
(SGML, CGM, PDF, and all A-10-tailored DSS files) for the A-10 TO Library. The new
Contractor shall coordinate with the incumbent Contractor to receive workload familiarization, and create a low-risk transition with no break in service. The new Contractor shall take possession of Government work in progress files (pending PCRs and attachments, not otherwise tasked to the incumbent Contractor) immediately upon receipt of an executed contract. The Contractor’s PMP shall describe a reasonable timeline for the transition. The timeline shall not be impacted based on differences between incumbent and new Contractors’ software. (CDRL A006)
6.1.4.2 Phase-Out
If there is a change in Contractor, the incumbent Contractor will provide familiarization, to the
Government and/or the follow-on Contractor. The Contractor’s PMP shall describe a low-risk transition method that will demonstrate the ability to provide the expertise and experience to accomplish the required tasks during the transition with no break in service. The Contractor shall prepare and submit a phase-out transition method that details a clear and orderly transition of workload and responsibility to future Contractor(s) or Government organization. During the phase-out familiarization period, the incumbent Contractor shall be fully responsible to provide services as specified within this PWS through the end of the period of performance. (CDRL A006)
6.1.5 Meetings
6.1.5.1 Kick-off Meeting
The Contractor shall support a kickoff meeting no later than ten (10) working days upon contract award.
6.1.5.2 Program Status Reviews/Technical Interchange Meetings
a. The Contractor shall attend regular (bi-weekly) program status reviews, as approved by the
Government Program Manager. The purpose of these meetings shall be to brief the progress of each assigned task, and to solicit input and concurrence of work performed.
The Contractor shall generate presentation materials as required to aid in the discussion of technical issues and shall support Technical Interchange Meetings/Reviews. The
Contractor shall provide conference agendas, meeting minutes, and track Action Items associated with the aforementioned meetings/reviews. (CDRLs A001, A002, A003, A004)
b. The Contractor shall include, at a minimum, the following information in the Status Report;
narrative review of work accomplished during the reporting period and/or significant events, deliverable process status, problems encountered, anticipated activities for the next reporting period, description of any travel or unique services provided funds and man-hour expenditure status. (CDRL A003)
CDRL Sequence No. A001 Conference Agenda
CDRL Sequence No. A002 Conference Minutes
CDRL Sequence No. A003 Contractors Progress, Status and Management Report
CDRL Sequence No. A004 Technical Report (Action Items)
6.1.5.3 Technical Order Rewrite/Flight Manual Review Conference (FMRC) Support
The Contractor shall support tech order rewrite efforts for all A-10 flight and maintenance TOs as required. The Contractor shall provide real-time updates to the SGML and graphic sets during the rewrite/FMRC sessions.
6.1.5.4 Integrated Product Team (IPT) Meetings
The Contractor shall support Biannual IPT’s at the local contractor facility. The goal of the IPT is to provide all members early insight into technical and schedule problems as well as the
Contractor’s actions taken to initiate/manage adequate resolution plans.
6.2 Government Inspection and Acceptance of Deliverables
The Government Program Manager will have the right to reject or require correction of any deficiencies found in deliverables. In the event of rejection of any deliverable, the Contractor will be notified in writing by the Government Program Manager of the specific reasons why the deliverable was rejected. The Contractor shall have seven calendar days, or as outlined in the table in Section 7.0 (whichever is shorter), to correct the rejected deliverable and resubmit to the
Government Program Manager for re-inspection. If no comments are provided within 30 calendar days of deliverable receipt, the deliverable will be deemed to have been accepted by the
Government.
7.0 SPECIAL CONSIDERATIONS
7.1 Security
Contractor personnel shall not release or remove system documentation, data, or reports generated by or through use of Government systems. All requests for information shall be forwarded to
AFLCMC/WWALE, ATTN: A-10 TO Program Manager.
This effort may require access to, and storage of, classified information and equipment on
Government approved facilities and databases. Therefore, this contract will require the contract personnel to obtain a security clearance, as directed. A security clearance of SECRET will be required for all personnel having access to the classified data and a DD Form 254 shall be submitted.
Contractor personnel who will require access to DoD computer network systems and/or require the use of a Common Access Card (CAC) for installation entry control or physical access to facilities during normal business hours when government personnel are present shall request a
CAC through the A-10 TO Program Manager.
The Contractor shall not divulge any information regarding files, data, processing activities/functions, user IDs, passwords, or other knowledge that may be gained, to anyone who is not authorized to have access to such information. Contractor personnel shall abide by all
Government rules, procedures, and standard of conduct. Contractors requiring access to
Government Automated Information Systems (AIS) shall have background investigations and security awareness training completed, after task order award but prior to AIS access. When the period of performance is complete and/or contractor personnel stop working on this project they shall have 5 business days to terminate all their network user account and to return all access cards and base identification badges.
7.2 Access to Facilities and Property
Access to Government facilities is limited. Therefore, the Contractor shall coordinate required access/usage times and dates through the A-10 TO Program Manager at least fifteen working days prior to the need date.
7.3 Base Support – Government Provided Office Space
No base support is anticipated with this contract. All work efforts shall be performed at the
Contractor’s site and/or contractor personnel will spend minimal time at the Government’s location.
7.4 Government Program and Contract Management
7.4.1 Government Program Management
AFLCMC/WWALE will provide the Government TO Program Manager for this contract. The
Government TO Program Manager will provide the Contractor access to all technical data required to perform approved tasking. Only the Government TO Program Manager or their designee has authority to review and approve contract deliverables (see paragraph 4.3).
7.4.2 Government Contract Management
Responsibility for contracting activities rests solely with the Government Procurement Contracting
Officer (PCO). No conversation, recommendations, or direction, whether given directly by, or implied by Government personnel, that will affect the scope, schedule, or price of the program covered by this PWS, shall be acted upon by the Contractor unless specifically approved by the
PCO.
8.0 TRAVEL REQUIREMENTS
Travel will be required in support of the above requirements. Annual travel needs are estimated as follows.
Purpose - Destination No. Persons No. Trips No. Days
Kick-off Meeting (Sustainment/S1000D) 3 2 5
TO Rewrite 2 3 5
TO IPT Support 4 2 5
FMRC 1 1 5
PIWG Support 2 1 5
9.0 CONTRACTING OFFICER REPRESENTATIVE
The overall Program Management (PM)/Contracting Officer Representative (COR) responsibilities for this task order reside with the following office:
Office Symbol: AFLCMC/WWALE
Street Address: 6067 Box Elder Ln
Building Number: 1284
Hill AFB, UT 84056-5811
801-586-7150
The Contractor will be notified by letter at time of award of the Primary and Alternate CORs assigned to this task order.
File details come from the government source that posted it. Updated .