CDRL_A008_TMCR.pdf

PDF 239 KB Posted

Attached to
A-10 Technical Order Engineering Support
Solicitation number
FA8202-16-R-1000
Issued by

About this file

CDRL A008

View the file

Other files

File Type Posted
FA820216R1000_______0006.pdf PDF
RFP_Attachment_16-Task_Order__1_PWS.pdf PDF
RFP_Attachment_2-Section_M_A10_TO_Support.pdf PDF
RFP_Attachment_1-Section_L_A10_TO_Support.pdf PDF
RFP_Attachment_20_TMCR_TM-86-01P_Change_Package.pdf PDF
RFP_Attachment_19_TOLCMP_Guide.pdf PDF
RFP_Attachment_12-PWS.pdf PDF
Technical_Questions_Set_11.pdf PDF
RFP_Attachment_12-Performance_Work_Statement.pdf PDF
RFP_Attachment_3-Sample_Task_1.pdf PDF
RFP_Attachment_17-Task_Order_1_CDRLs.pdf PDF
RFP_Attachment_11-Pricing_Worksheet_and_Task_Order_1_Proposed_Pricing.xls XLS spreadsheet
Solicitation_CDRLs.pdf PDF
RFP_Attachment_1-Section_L_A10_TO_Support.pdf PDF
RFP_Attachment_16-Task_Order__1_PWS.pdf PDF
RFP_Attachment_5-Sample_Task_3.pdf PDF
RFP_Attachment_18-TOLCMP_A-10.pdf PDF
FA820216R1000_______0005.pdf PDF
RFP_Attachment_4-Sample_Task_2.pdf PDF
RFP_Attachment_2-Section_M_A10_TO_Support.pdf PDF
FA820216R1000_______0004.pdf PDF
Question_set__10.docx DOCX document
Question_Set__9.docx DOCX document
FA820216R1000_______0003.pdf PDF
RFP_Attachment_2-Section_M_A10_TO_Support_13_June_2016.docx DOCX document
Question_Set__8.docx DOCX document
Question_Set__7.docx DOCX document
FA820216R1000_______0002.pdf PDF
RFP_Attachment_1-Section_L_A10_TO_Support_8_June_2016.docx DOCX document
Question_Set__6.docx DOCX document
38784STD-BV9a.dtd DTD file
38784STD-BV9a_releasenotes.doc DOC document
38784STD-BV9a_TDT.pdf PDF
38784STD-BV8a_scripts.zip ZIP file
isoentities.zip ZIP file
Question_Set__5.docx DOCX document
readme.txt TXT text file
Question_Set__4.docx DOCX document
RFP_Attachment_13-Labor_Category_Description.pdf PDF
83495C1CV9D0P1_TDT.pdf PDF
PLM_Data_Exchange_Specification_12-A10DOC-002_Appendix_Table_Fv0.5.xlsx XLSX spreadsheet
7700H-CV9D0P0_TDT.pdf PDF
readme.txt TXT text file
MIL-DTL-9977_Rev_M.pdf PDF
83495C1CV9D0P1.fosi —
7700H-CV9D0P05x11.fosi —
7700H-CV9D0P0_scripts.zip ZIP file
83495C1CV9D0P1_Release_Notes.docx DOCX document
38784STD-BV8a_scripts.zip ZIP file
7700H-CV9D0P0.fosi —
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A008
title: Air Force Technical Manual Contract Requirements (TMCR)
sub: A-10 TO Support for Sustainment and/or Mods and MIL-STD-1808/S1000D Conversion/Migration
auth: TM-86-01P
ref: PWS Paragraph 3.0, 4.0
req_ofc: AFLCMC/WWALE
dd250: LT
appcode: A
dist: E
freq: As Req'd
asof: N/A
firstsub: See Blk 16
subsub: As Req'd
addressee1: AFLCMC/WWALE
draft1:
reg1:
repro1:
addressee2: (TO)
draft2:
reg2:
repro2: 1
addressee3: 6067 Box Elder Lane
draft3:
reg3:
repro3:
addressee4: Bldg 1284
draft4:
reg4:
repro4:
addressee5: Hill AFB, UT 84056
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: AFLCMC/WWAEJ
draft8:
reg8:
repro8:
addressee9: (DM)
draft9:
reg9: 1
repro9:
addressee10: 6067 Box Elder Lane
draft10:
reg10:
repro10:
addressee11: Bldg 1284
draft11:
reg11:
repro11:
addressee12: Hill AFB, UT 84056
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15: AFLCMC/WWAL
draft15:
reg15:
repro15:
addressee16: (PM)
draft16:
reg16: 1
repro16:
addressee17: 6058 Aspen Avenue
draft17:
reg17:
repro17:
addressee18: Bldg 1295N
draft18:
reg18:
repro18:
addressee19: Hill AFB, UT 84056
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 1
remarks: BLK 8: APP Code A. A-10 SPO approval/disapproval/comments within thirty (30) calender

days of receipt of each submittal.

Block 12: For TO sustainment and/or modifications, a tailored draft TMCR is due 60 days after first order of CLIN A008 (Block cycle, RACs, etc.)

For MIL-STD-1808/S1000D, a tailored draft TMCR is due 60 days post receipt of MIL-STD-1808/S1000D task order (if CLIN 0006 or CLIN 0007 is ordered). Final tailored TMCR due date is 24 months (if CLIN 0006 is ordered) or 36 months (if CLIN 0007 is ordered) after start of migration/conversion effort for S1000D/MIL-STD-1808.

Block 9: DISTRIBUTION STATEMENT E - Distribution authorized to DoD Components only (Direct Military Support) (5 Oct 2016). Other requests for this document shall be referred to AFLCMC/WWALE, 6067 Box Elder Lane, Hill AFB, UT 84056-5811.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.

HANDLING AND DESTRUCTION NOTICE – Comply with Distribution Statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Blk 14: These deliverables shall be submitted to Program Manager identified in contract and all addressees on government COR address list.

Deliverable shall be made via e-mail for files less than 5M bytes. For files over 5M bytes, deliverables shall be made via CD/DVD ROM. Format shall be compatible with Adobe Acrobat Pro in Portable Document Format (PDF) or Microsoft Office 7 or 2013. The contractor shall use US DoD PKI compliant encryption mechanism when submitting sensitive but unclassified data as attachments to e-mails.

group:
total_price:
prep_name:
line_item: 0008
exhibit: A
xtdp: Yes
xtm: Off
othercat:
system: A-10C Thunderbolt II
ctr_no: FA8202-16-R-1000
contr:
remarksb:
Page2:
Reset:
2016-10-05T14:06:59-0600
GROHS.EDWARD.C.1035844321
prep_date: 5 OCT 2016
app_by:
2016-10-05T14:22:32-0600
MIAN.LEONARD.D.1184803077
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .