Solicitation # FA820122R0010
Request for Information
Q1. How many of our past performance projects must be listed for the last three years.
A1. 6
Q2. Does the pipe flashing surrounding the large pipe flue on the metal roof need to remain? Is it giving necessary structural support to the pipe?
A2. Flue pipe and flashing needs to remain. Flashing will need to be raised to meet new roof height or a new flashing recommended/designed by the roof panel manufacturer will need to be installed.
The weight of the pipe is supported by some brackets on the bottom side of existing roof. It may help provide some vertical support along with some existing guide wires.
Q3. Can the new 5-in gutter and down spout be aluminum?
A3. No
Q4. The spreadsheet has a built-in multiplier of 3%, but we have recently been seeing substantially higher inflation rates. With the current inflationary conditions, will there be provisions to account for this?
A4. The preset multiplier of 3% can be adjusted on all years as you see fit. As stated in the Total
Evaluated Price worksheet, sheet 1 “Total Evaluated Summary” instruction #5 states, “years 2 thru 5 have a preset formula that can be adjusted or removed as desired.”
Narrative of Items of importance
1. Line item PP – ½” cover board square footage is figured for cover board under both roof types.