Local Roofing Site Visit RFI.pdf

PDF 404 KB Posted

Attached to
Roofing Repair, Hill AFB, UT Federal contract opportunity
Solicitation number
FA8201-22-R-0010
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # FA820122R0010

Request for Information

Q1. How many of our past performance projects must be listed for the last three years.

A1. 6

Q2. Does the pipe flashing surrounding the large pipe flue on the metal roof need to remain? Is it giving necessary structural support to the pipe?

A2. Flue pipe and flashing needs to remain. Flashing will need to be raised to meet new roof height or a new flashing recommended/designed by the roof panel manufacturer will need to be installed.

The weight of the pipe is supported by some brackets on the bottom side of existing roof. It may help provide some vertical support along with some existing guide wires.

Q3. Can the new 5-in gutter and down spout be aluminum?

A3. No

Q4. The spreadsheet has a built-in multiplier of 3%, but we have recently been seeing substantially higher inflation rates. With the current inflationary conditions, will there be provisions to account for this?

A4. The preset multiplier of 3% can be adjusted on all years as you see fit. As stated in the Total

Evaluated Price worksheet, sheet 1 “Total Evaluated Summary” instruction #5 states, “years 2 thru 5 have a preset formula that can be adjusted or removed as desired.”

Narrative of Items of importance

1. Line item PP – ½” cover board square footage is figured for cover board under both roof types.

File details come from the government source that posted it. Updated .