Attachment 15 - SABER Section L.pdf

PDF 1 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA820121R0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This notice provides information about an upcoming Simplified Acquisition of Base Engineering Requirements (SABER) construction services contract opportunity with the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation will seek proposals for a multiple award indefinite delivery/indefinite quantity contract with a six year period of performance to provide streamlined construction services at Hill Air Force Base. The set aside is for 8(a) small businesses located near Hill AFB, Utah. Interested parties may submit responses to draft documents and attend a mid-January 2021 site visit for the seed project, which will be an evaluation area. The final solicitation is expected in early January 2021 with a 40 day response timeframe. The contract will utilize firm fixed pricing and have a potential structure of construction project, post-award conference, and construction project contract line items.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment 07- Wage Determination - Box Elder County - 3 Jan 2020.pdf PDF
Attachment 10- Wage Determination - Sublette County WY - 14 Jan 2020.pdf PDF
Attachment 13 - SABER Seed Project SOW - Bldg. 100.pdf PDF
Attachment 14 - Seed Project Pricing Matrix.xlsx XLSX spreadsheet
SABER Question-Comment Matrix.xlsx XLSX spreadsheet
Solicitation - FA820121R0007.pdf PDF
Attachment 04 - BASE FACILITY DESIGN STANDARD 19 OCT 2020.docx DOCX document
Attachment 08- Wage Determination - Daggett-Duchesne-Rich-Summit Counties - 3 Jan 2020.pdf PDF
Attachment 11- Wage Determination - Davis County - 3 Jan 2020.pdf PDF
Attachment 12 - Wage Determination - Salt Lake County - 31 Jan 2020.pdf PDF
Attachment 02 - SABER TEP Matrix.xlsx XLSX spreadsheet
Attachment 03 - Architectural Compatibility Plan (ACP).pdf PDF
Attachment 09- Wage Determination - Morgan-Weber Counties - 3 Jan 2020.pdf PDF
Attachment 16 - SABER Section M.pdf PDF
Attachment 01 - SABER 2021 DRAFT SOW.pdf PDF
Attachment 05 - Hill AFB Construction and Demolition Waste Diversion Report.pdf PDF
Attachment 06- Bona Fide Office Requirements.pdf PDF
SABER 2021 DRAFT SOW.pdf PDF
Draft SABER Solicitation - FA820121R0007.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER: Section L

Section L

Instructions to Offerors

SIMPLIFIED ACQUISITION BASE ENGINEERING REQUIREMENTS

(SABER)

XX January 2021

Table of Contents

1.0 PROPOSAL PREPARATION INSTRUCTIONS

2.0 PROGRAM STRUCTURE AND OBJECTIVES

2.1 BUDGET/FUNDING INFORMATION

3.0 GENERAL INSTRUCTIONS

3.1 INCLUDE SUFFICIENT DETAIL

3.2 EMBELLISHMENTS

3.3 PROPOSAL ACCEPTANCE PERIOD

3.4 GOVERNMENT CONTRACT FILES

3.5 POINT OF CONTACT

3.6 DEBRIEFINGS

3.6.1 Pre Award Debriefings

3.6.2 Post Award Debriefings

3.7 DISCREPANCIES

3.8 ELECTRONIC REFERENCE DOCUMENTS

3.9 ORAL PRESENTATION

3.10 AMENDMENTS TO SOLICITATION

3.11 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS

3.12 RECEIPT OF PROPOSAL

3.13 PROPOSAL WITHDRAWAL

3.14 TITLE PAGE

3.15 PROPOSAL ORGANIZATION

3.16 PAGE LIMITATIONS

3.17 PRICING INFORMATION

3.18 CROSS REFERENCING

3.19 CROSS REFERENCE MATRIX

3.20 INDEXING

3.21 PAGE SIZE AND FORMAT

3.22 TABLES, CHARTS, GRAPHS AND FIGURES

3.23 BINDING AND LABELING

3.24 ELECTRONIC OFFERS

3.25 DISTRIBUTION

4.0 VOLUME I – PRICE (FACTOR 1)

4.1 GENERAL INSTRUCTIONS

4.2 TOTAL EVALUATED PRICE (TEP)

4.2.1 Seed Project Pricing

4.3 COST OR PRICING INFORMATION REQUIREMENTS

4.3.1 Rounding

4.3.2 Pricing Assumptions

4.3.3 Estimating Techniques and Methods

4.3.4 Construction Wage Rate Requirements Wage Determinations

5.0 VOLUME II – TECHNICAL (FACTOR 2)

5.1 ADEQUATE RESPONSES

5.2 VOLUME ORGANIZATION

5.3 TECHNICAL ACCEPTABILITY

5.3.1 Subfactor 1: Seed Project

5.3.2 Subfactor 2: Subcontractor Utilization Plan

5.3.3 Subfactor 3: Management Plan

5.3.4 Subfactor 4: Quality Control Plan

6.0 VOLUME III – PAST PERFORMANCE

6.1 RECENCY

6.2 RELEVANCY

6.3 PAST PERFORMANCE DISCREPANCY

6.4 JOINT VENTURE

6.5 PPI TOOL

6.6 PROPOSAL SUBMITTAL INFORMATION

7.0 VOLUME IV – CONTRACT DOCUMENTATION

7.1 MODEL CONTRACT/REPRESENTATIONS AND CERTIFICATIONS

7.1.1 Section A – Solicitation/Contract Form

7.1.2 Section B – Supplies or Services and Costs/Prices:

7.1.3 Section I – Contract Clauses

7.1.4 Section K – Representations, Certifications, and other Statements of Offerors

7.2 ABILITY TO OBTAIN ADEQUATE FINANCIAL RESOURCES

7.3 LIMITATIONS ON SUBCONTRACTING

7.4 TOTAL CASE INCIDENT RATE AND DAYS AWAY, RESTRICTED AND TRANSFERRED RATES

7.5 BONA FIDE OFFICE

7.6 SITE VISIT ATTENDEES

7.7 OTHER INFORMATION REQUIRED

7.7.1 Authorized Offeror Personnel

7.7.2 Small Business and Joint Venture

7.8 EXCEPTIONS TO SOLICITATION REQUIREMENTS

APPENDIX I: DOWNLOADING THE PPI TOOL

APPENDIX II: CROSS REFERENCE MATRIX

1.0 PROPOSAL PREPARATION INSTRUCTIONS

This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition

Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation

Supplement (AFFARS), DoD Source Selection Procedures, Appendix A. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability.

To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including all stated terms, conditions, representations, certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

Offerors shall submit all exceptions within 30 days from the release of the solicitation.

The Government highly encourages any exceptions to be submitted within 14 days from the release of the solicitation.

The offeror’s overall proposal shall consist of four (4) separate volumes:

1) Volume I – Price

2) Volume II – Technical

3) Volume III – Past Performance Information

4) Volume IV – Contract Documentation

Proposals must be received by the Contracting Officer at 6038 Aspen Ave. Bldg. 1289

NE Wing, Hill Air Force Base, UT 84056, Attention: Mr. Brady Smith, no later than the date and time specified in Section A of the solicitation. Please ensure proposal delivery is accomplished on a business day. Offerors are requested to submit Volume III Past

Performance Information, so that it is received ten (10) calendar days prior to the required due date for proposals. Failure to submit Volume III by the earlier date will not result in Offeror disqualification.

2.0 PROGRAM STRUCTURE AND OBJECTIVES

The Government intends to award a multiple award Indefinite Delivery/Indefinite

Quantity (IDIQ) contract for the SABER program. Competition is limited to 8(a) small businesses located within Utah or 8(a) construction firms outside of Utah that have an approved bona fide office in Utah (refer to Attachment 06) at the time of bid submittals, under the assigned North American Industry Classification System (NAICS) Code for the

SABER program. All other 8(a) participants are ineligible to submit offers.

The Government intends to select approximately three 8(a) Small Business contractors for awards. However, the Government reserves the right to award more, fewer or no contract(s) at all if the Source Selection Authority (SSA) determines it is in the

Government's best interest. The SSA will consider the Government's expected volume of work, available funding, adequate competition, and the availability of best value proposals. If the Government determines to not award a contract the Government is not liable for the costs incurred.

The Government intends to award without discussions; therefore, it is imperative that offerors submit its best pricing and proposal terms initially. However, the Government reserves the right to hold discussions, if during the evaluation period it is determined to be in the best interest of the Government. During discussions offeror’s responses to

Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision.

2.1 Budget/Funding Information

Funds will not be obligated on the Basic IDIQ contract(s). Funding will be obligated on each task order awarded under the Basic IDIQ contract(s). The

Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the

Government has no obligation to reimburse an Offeror for any costs. The minimum guarantee for this contract(s) will be met with the issuance of the first task order.

3.0 GENERAL INSTRUCTIONS

This section provides general guidance for preparing proposals as well as specific instructions on format and content. The offeror's proposal shall include all data and information requested and shall be submitted in accordance with (IAW) these instructions. Any offeror who submits an incomplete package may be considered ineligible for award and eliminated from the competition. The offer shall be compliant with the requirements as stated in the Statement of Work (SOW), Seed Project SOW, Model Contract, and Solicitation. Non-conformance with these instructions shall result in an “Unacceptable” proposal evaluation.

3.1 Include Sufficient Detail

The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal shall NOT simply rephrase, restate, or be a copy-and-paste of the

Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their experience and certifications and will base its evaluation on the information presented in the offeror’s proposal.

3.2 Embellishments

Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

3.3 Proposal Acceptance Period

The proposal acceptance period is specified in Block 12 of Section A of the model contract/solicitation as 270 calendar days from the date specified for receipt of proposals. Offerors providing less than the specified calendar days for

Government acceptance after the date offers are due may be considered non-responsive and may be eliminated.

3.4 Government Contract Files

IAW FAR Subpart 4.8, Government Contract Files, the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the

Government will destroy extra copies of such unsuccessful proposals.

3.5 Point of Contact

Exchanges of source selection information between Government and offerors will be controlled by the Contracting Officer (CO). Exchanges of source selection information after submission of the initial proposal packages between the

Government and offerors will be controlled by the CO. Email may be used to transmit such information only if the email can be sent encrypted, and must include “Source Selection Information – See FAR 2.101 and 3.104” in the subject line of the email. The CO is the sole point of contact for this acquisition. Offeror shall address any questions or concerns they may have to the CO.

Written requests for clarification may be sent to the CO at the addresses below:

AFSC/OL:H/PZIEB

ATTN: Brady Smith

Contracting Officer

6038 Aspen Ave, Bldg. 1289 NE

Hill AFB, UT 84056

Office (801) 777-3484 brady.smith@us.af.mil

3.6 Debriefings

3.6.1 Pre Award Debriefings

The CO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505.

3.6.2 Post Award Debriefings

The CO will notify unsuccessful offerors included in the competitive range of the source selection decision IAW FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing.

Successful offerors will be notified of the source selection decision and may also request a debriefing IAW the requirements of FAR 15.506.

3.7 Discrepancies

If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale.

The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.

3.8 Electronic Reference Documents

All referenced documents for this solicitation are available at http://www.beta.sam.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

3.9 Oral Presentation

Oral presentations will not be allowed.

3.10 Amendments to Solicitation

If this Request for Proposal (RFP) is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this request by signing and returning the front page of each amendment with its proposal.

3.11 Submission, Modification, Revision, and Withdrawal of Proposals

Proposals and modifications to proposals shall be submitted in both paper and electronic media to the address located in paragraph 1.1 of this document, showing the time and date specified for receipt, the solicitation number, and the name and address of the Offeror. Late proposals will only be considered IAW

FAR 15.208.

Proposals may be withdrawn by written notice received at any time before award.

Proposals may also be withdrawn in person by an Offeror or an authorized representative, if the identity of the person requesting the withdrawal is established and the person signs a receipt for the proposal before award.

3.12 Receipt of Proposal

Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

3.13 Proposal Withdrawal

Proposals may be withdrawn by written notice received at any time before award.

Proposals may also be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting the withdrawal is established and the person signs a receipt for the proposal before award.

3.14 Title Page

The title page of each volume must show:

a) Solicitation Number

b) Company name, address, Commercial and Government Entity (CAGE)

Code and Data Universal Numbering System (DUNS) Number.

c) Primary point of contact name, telephone number and email address

d) Volume number and name (i.e. Volume I, Price) and copy number (i.e.

Original, Copy 1, Copy 2)

3.15 Proposal Organization

The offeror shall prepare the proposal as set forth in the Proposal Organization

Table below. The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies specified. The volumes identified in the Table shall be separately bound in three-ring, loose-leaf binders. The contents of each proposal volume are described in the Section L paragraph as noted in the Table below:

Table 1: Proposal Organization

Volume Section L

Paragraph # Title Copies Page Limit

I 4.0 Price

2 (Original plus 1 copy electronically on separate CDs)

Unlimited

(Pricing Assumptions limited to 4 pages)

II

5.0 Technical

Original plus 3

Hardcopies plus 2

CDs

50 pages

III 6.0 Past Performance

2 (Original plus 1 copy electronically on separate CDs)

3 pages per submission

IV 7.0

Contract

Documentation

2 (Original plus 1 copy electronically on separate CDs)

Unlimited

3.16 Page Limitations

Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. Page limitations may be placed on responses to Evaluation Notices (ENs) if applicable. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. Each page shall be counted except the following: blank pages, title pages, tables of contents, tabs, glossary of abbreviations and acronyms, cross reference matrix, and those noted in Table 1, Proposal Organization, as

“Unlimited.”

3.17 Pricing Information

All pricing information shall be addressed ONLY in the Price Volume.

3.18 Cross Referencing

Each volume of the proposal shall be written on a stand-alone basis so that its contents may be evaluated without cross-referencing to other volumes of the proposal. Information required for proposal evaluation that is not found in its designated volume will be assumed to have been omitted from the proposal.

3.19 Cross Reference Matrix

The offeror shall fill out the proposal section of the cross reference matrix in the format as provided in Appendix II, Cross Reference Matrix, of this document, indicating the proposal reference information as it relates to the Section L, Section

M and the SOW. The cross reference matrix shall be included in the Technical

Volume. The cross reference matrix addresses each requirement within the SOW, Section L and Section M. The offeror shall fill in the proposal section independently labeled with the appropriate paragraph number from its proposal that addresses the requirement. The offeror’s cross referencing matrix will not count against page limitations for its respected volume. The offeror’s approach shall address all requirements IAW the following Paragraphs and sub-paragraphs of the SOW unless otherwise noted:

3.20 Indexing

Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

Include an indexed list of tables and figures. Tables and figures do not count against the page limitations for their respective volumes.

Glossary of Abbreviations and Acronyms – Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

3.21 Page Size and Format

A page is defined as each face of a sheet of paper containing information. Page size shall be 8.5 x 11 inches, not including foldouts, and printed on both sides.

Sheets shall be double-sided which will count as two pages. Except for the reproduced sections of the solicitation document, the text shall be Times New

Roman and font size shall be no less than 12 points and lines shall be single spaced. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top, bottom, and side. Pages shall be numbered sequentially by volume. These limitations shall apply to both electronic and hard copy proposals.

3.22 Tables, Charts, Graphs and Figures

Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc.

These displays shall be uncomplicated, legible and shall not exceed 11 by 17 inches in size. Foldout pages shall fold entirely within the volume, be printed only on one side, and count as a single page unless the foldout contains tables and/or figures which do not count against the page limitations for their respective volumes. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics; not for pages of text. For tables, charts, graphs and figures, the text shall be no smaller than 10 point. These limitations shall apply to both electronic and hard copy proposals.

3.23 Binding and Labeling

The Technical Volume of the proposal should be separately bound in a three-ring, loose-leaf binder permitting the volume to lie flat when open. Staples shall not be used. The outside of each Technical Volume binder shall include a cover sheet, clearly marked, identifying volume number, title, copy number, solicitation identification, and the Offeror's name. Cover sheets are not included in the total page count. The same identifying data should be placed on the spine of each binder. Be sure to apply all appropriate markings including those prescribed IAW

FAR 52.215-1(e), Restriction on Disclosure and Use of Data and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information. Any page containing proprietary information should be so marked.

3.24 Electronic Offers

The content and page size of electronic copies must be identical to the hard copies. In the event there is a discrepancy between the hard copy and the electronic copy, the hard copy shall take precedence and will be used for evaluation. The Offeror shall submit Volumes I through IV in electronic format, using virus-free CD-R or DVD-R. In no cases shall the Offeror use CD-RW or

DVD-RW. The Offeror shall indicate on each CDs/ DVD the Volume Number, Volume Title, Company’s name, solicitation number and either “Original Copy” or “Backup Copy”. Each volume shall be on a separate CD/DVD. Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any. The file naming shall specify the appropriate volume number, volume title and a descriptive identifier. If files are compressed, the necessary decompression program must be included. The electronic copies of the proposal shall be submitted in a format readable and searchable by MS Office

Word, Adobe PDF, and MS Office Excel (2016 or later).

3.25 Distribution

The "original" proposal shall be identified. Proposals shall be addressed to the

CO and mailed or hand-delivered to:

AFSC/OL:H/PZIEB

Attn: Brady Smith

6038 Aspen Ave, Bldg. 1289 NE Wing

Hill AFB, UT 84056

Office (801) 777-3484

E-mail: brady.smith@hill.af.mil

4.0 VOLUME I – PRICE (FACTOR 1)

4.1 General Instructions

As defined in Section M of the RFP, which will be assessed from the information provided in this volume, the pricing criteria will be as follows:

1) Completeness

2) Reasonableness

3) Balance

4) Total Evaluated Price (TEP)

Offerors should review Section M criteria to ensure the minimum requirements are met.

mailto:brady.smith@hill.af.mil

4.2 Total Evaluated Price (TEP)

Offerors shall input into the TEP Worksheet, located in the Section J Attachment

3, Not To Exceed (NTE) fully burdened rates for all labor categories and years.

Fully burdened rates shall include all direct costs, indirect costs (Overhead, General and Administrative, Fringe Benefits, etc.) and profit necessary for the performance of the entire requirement.

The formula for application of hours, NTE profit and fee factors and the notional hours used will not be disclosed to offerors. The TEP is for evaluation purposes only; however, all proposed NTE rates, profit and fee are contractually binding.

Submit a copy of the completed TEP worksheet in Price Volume I in Microsoft

Excel (non PDF format).

4.2.1 Seed Project Pricing

Offerors shall populate the “Seed Project Pricing Matrix” worksheet, Section J, Attachment 14, IAW the instructions contained thereon. For the purposes of the Seed Project, all rates shall be proposed and evaluated at the NTE rates. Proposed Seed Project prices are Firm-Fixed Price (FFP) and contractually binding. If the Offeror is selected for award, the Offeror may propose lower rates on future Task Orders.

4.3 Cost or Pricing Information Requirements

IAW FAR 15.402, 15.403-1(b) and 15.403-3(a), information other than certified cost or pricing data may be required to support price reasonableness. If after receipt of proposals, the CO determines that there is insufficient information available to determine the reasonableness of the proposed pricing the offeror may be required to submit additional information other than certified cost or pricing data. If, during the source selection process, the CO determines that adequate competition no longer exists, certified cost and pricing data may be required.

4.3.1 Rounding

All dollar amounts provided shall not extend beyond two decimal places.

4.3.2 Pricing Assumptions

Summarize all significant pricing assumptions, scope limitations and/or qualifications of the Price Volume I. IAW with Table 1, Proposal

Organization, and Pricing Assumptions shall not exceed 4 pages.

4.3.3 Estimating Techniques and Methods

Offerors shall use generally accepted estimating techniques to develop their estimates for the proposed rates.

4.3.4 Construction Wage Rate Requirements Wage Determinations

The rates proposed for the various Wage Determinations (Section J

Attachments 07-12) will also be evaluated to ensure they meet or exceed the rates in the applicable Construction Wage Rate Requirements Wage

Determinations.

5.0 VOLUME II – TECHNICAL (FACTOR 2)

The Technical Volume shall be clear, specific, complete and include sufficient detail for effective evaluation. Legibility, clarity and coherence are very important. The offeror’s responses will be evaluated against the Technical Subfactors defined in Section M, Evaluation Factors for Award. Offerors shall review Section M criteria to ensure the minimum requirements are met. Provide as specifically as possible the actual methodology the offeror would use for accomplishing/satisfying each subfactor. There will be no reference to rates or price in this volume. Offerors shall assume that the

Government has no prior knowledge of their experience and certifications, and will base its evaluation on the information presented in the offeror’s proposal. All the requirements specified in the solicitation are mandatory. By the offeror’s proposal submission, the offeror is representing that the company/firm will perform ALL the requirements specified in the solicitation (including SOW); it is not necessary or desirable to tell us so in the proposal.

The offeror’s approach shall address all requirements IAW the following Paragraphs and sub-paragraphs of the SOW unless otherwise noted.

5.1 Adequate Responses

It is imperative that the offeror fully describe and provide detail as to how the offeror shall meet the subfactor requirements. Do not merely copy and paste, rephrase or restate the objectives or reformulate the requirements specified in the solicitation. Evidence (which clearly demonstrates and supports the offeror’s claims) is essential. The absence of such evidence may result in a technically unacceptable proposal.

5.2 Volume Organization

The Technical Volume shall be organized according to the following general outline:

1) Table of Contents

2) List of Table and Drawings

3) Glossary

4) Cross Reference Matrix

5) Subfactor 1 – Seed Project

6) Subfactor 2 – Subcontractor Utilization Plan

7) Subfactor 3 – Management Plan

8) Subfactor 4 – Quality Control Plan (QCP)

5.3 Technical Acceptability

5.3.1 Subfactor 1: Seed Project

The offeror shall submit a proposal for the seed project. The offeror shall describe in detail the following areas:

5.3.1.1 Materials

Provide material submittals to include all items identified in Seed

Project SOW Section 2.1 and detailed narrative describing how this meets the equipment requirements of the Seed Project SOW.

All material submittals shall be submitted on AF IMT 3000, Material Approval Submittal Form.

5.3.1.2 Asbestos Removal

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Basic SOW 44.6 [all requirements identified by the Utah Division of Air Quality (DAQ) to include Utah DAQ rule R307-801, OSHA 29 CFR 1926.1101 and/or 29 CFR 1910.1001 and EPA 40 CFR Part 61, sub part M] and Seed Project SOW Section 3.1.

5.3.1.3 Demolition

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.2

5.3.1.4 Architectural

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.3

5.3.1.5 Electrical

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.4.

5.3.1.6 Plumbing

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.5.

5.3.1.7 Mechanical

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.6

5.3.1.8 DDC Controls

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.7.

5.3.1.9 Communication Wiring

Provide a narrative that demonstrates a detailed approach of how the requirements will be met IAW Seed Project SOW Section 3.8.

5.3.1.10 Fire Suppression

Provide a narrative that demonstrates a detailed approach of how the requirements will be met for Fire Suppression IAW Seed

Project SOW Section 3.9

5.3.2 Subfactor 2: Subcontractor Utilization Plan

The offeror shall submit a Subcontractor Utilization Plan that provides a detailed approach of how the requirements specified in Basic SOW

Sections 4.6 and 6 will be met. The Subcontractor Utilization Plan shall demonstrate proposed management of subcontractors, establishment and utilization of subcontractor pools, and ability to obtain additional resources to meet performance and schedule requirements. This plan should include any current agreements and/or letters of intent. Plan should also demonstrate how prime contractor intends to cultivate and utilize pool of subcontractors in order to provide best value on all task orders. This plan will be incorporated into the contract award.

5.3.3 Subfactor 3: Management Plan

The offeror shall submit a Management Plan IAW Basic SOW Section 5 that includes a position description for all key personnel with required minimum qualifications, specifies which positions are being accomplished by subcontractors, and includes a complete organizational chart. Offerors shall specify how they will ensure employees and subcontractors have current and valid professional certifications and licenses. This plan shall include resumes, licenses, and certifications to fulfill requirements IAW

Basic SOW Sections 4.1 thru 4.5 for the following key personnel:

Contract Manager

Project Manager/Superintendent

Quality Control Officer

Environmental Officer

Site Safety and Health Officer (SSHO)

5.3.4 Subfactor 4: Quality Control Plan

The offeror shall submit a Quality Control Plan that provides a detailed approach on how the requirements in Basic SOW section 8 will be met.

The quality control plan shall include all contents identified in Basic SOW section 8.2. This plan will be incorporated into the contract award.

6.0 VOLUME III – PAST PERFORMANCE

Offerors shall, if available, shall submit recent, relevant contracts (maximum of three contracts) as defined below. For purposes of this Past Performance evaluation, recency is defined as active or completed efforts performed within the past three years from the issuance date of this solicitation. Performance as subcontractor may be included; the offeror shall include contract number and prime contractor. The Government will consider this information, along with information obtained from other sources (e.g., Past

Performance Information Retrieval System (PPIRS), Contractor Performance Assessment

Reports System (CPARS), and Government and commercial customer interviews).

Offerors may use past performance of subcontractor to satisfy recent and relevant past performance. If this is a first time joint venture, each party to the joint venture must provide a list of past relevant contracts (maximum of three each).

An offeror’s failure to address performance problems/issues within this volume does not preclude the Government from using such information in determining a past performance rating.

6.1 Recency

Recency is defined as performance within the last three years from the date of the issuance of the solicitation. The Government will not consider performance on contracts where performance was concluded more than three years prior to the solicitation issue date or contracts awarded.

6.2 Relevancy

Relevancy is defined as performance of efforts involving construction that are similar or greater in scope and magnitude that involves similar types and complexities of construction described in this RFP. For Government contracts, any relevant Government contract where the Offeror was the Prime Contractor will be considered and reviewed to determine past performance history.

6.3 Past Performance Discrepancy

The offerors may address any performance problems/issues that the Government may identify and explain corrective action taken and current status. The

Government will consider this information in determining the offeror’s past performance rating.

6.4 Joint Venture

If a joint venture is contemplated, provide complete information as to the joint venture.

If this is an existing joint venture, include any recent and relevant past performance information of this joint venture (up to three).

If this is a first time joint venture, each party to the joint venture must provide a list of past relevant contracts (up to three each).

6.5 PPI Tool

The offerors shall use the PPI Tool (Use latest version an beta.sam.gov) in order to electronically submit the Past Performance Volume in accordance with the

RFP.

See Appendix I for instructions.

6.6 Proposal Submittal Information

The Government requests the Offeror submit Past Performance Volume, ten calendar days prior to the required due date for proposals. Failure to submit

Volume III by the earlier date will not result in Offeror disqualification. PPI sheets shall be submitted using the PPI tool.

7.0 VOLUME IV – CONTRACT DOCUMENTATION

Provide all Volume IV Contract Documentation in the prescribed format identified in

Table 1.

7.1 Model Contract/Representations and Certifications

The purpose of this volume is to provide information to the Government for preparing the contract document and supporting file. The offeror’s proposal shall include a signed copy of the Model Contract, Solicitation, and completed Sections

A through K.

7.1.1 Section A – Solicitation/Contract Form

Complete blocks 13, 14, 15, 16, 20 on the SF 1442. Signature by the offeror on the SF 1442 constitutes an offer, which the Government may accept.

7.1.2 Section B – Supplies or Services and Costs/Prices:

Do not input pricing information in Section B of the model contract. All required prices shall be proposed in the TEP Worksheet Section J

Attachment 02 and Seed Project Pricing Matrix Attachment 14.

7.1.3 Section I – Contract Clauses

The offeror shall complete all required clause fill-ins.

IAW FAR Clause 52.228-1, Bid Guarantee, the offeror shall provide a bid guarantee in the amount of 20 Percent (20%) of the bid price.

Submit a prequalification letter from an A.M. Best “A” rated surety (not a bonding agent), that verifies your bonding relationship and shows a minimum bond capacity of $5M aggregate for SABER Task Orders.

Additional bonding will be required if active SABER projects exceed

$5M. Performance and Payment Bonds will be required IAW FAR Clause

52.228-15 and due no later than 10 days after award notification.

7.1.4 Section K – Representations, Certifications, and other Statements of

Offerors

The offeror shall complete representations, certifications, acknowledgments and statements. Offeror must have filled out an online provision 52.204-08 Annual Representations and Certifications (Dec

2012), Online Reps and Certs at http://www.sam.gov. Offer shall ensure certification as a small business under North American Industry

Classification System (NAICS) 236220. The Small Business size standard for this NAICS is $39.5M.

7.2 Ability to Obtain Adequate Financial Resources

The offeror shall submit acceptable evidence that the company possesses adequate financial resources to perform the contract. This information will be used as part of the Contracting Officer’s determination of responsibility IAW FAR 9.104.

7.3 Limitations on Subcontracting

IAW FAR 52.219-14 Limitations on Subcontracting, at least 15 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. Submit documentation that demonstrates how the prime contractor will meet the requirements of the aforementioned FAR Clause.

7.4 Total Case Incident Rate and Days Away, Restricted and Transferred Rates

The offerors shall submit its Total Case Incident Rate (TCIR) and Days Away, Restricted and Transferred (DART) rates, or, injury and illness rates for the past three years. For newly formed entities or other offerors that do not possess three years of consecutive recording data, submit this information for the time period it or they possess. The offeror may also submit other comparable data from a recognized agency, such as workers compensation, insurance rates, etc., for the same time period as well.

7.5 Bona Fide Office

IAW Basic SOW Section 3, offerors shall submit a determination from the Small

Business Administration (SBA) as documented proof that the offeror’s company has a bona fide place of business within the area.

7.6 Site Visit Attendees

The offeror shall submit an attendance list of up to three individuals (by position title and name) that will attend the site visit for the seed project at Hill AFB. The offeror shall submit the attendee’s name, driver’s license (DL) number, and the state the DL was issued in.

7.7 Other Information Required

7.7.1 Authorized Offeror Personnel

Provide the name, title, telephone number, and email address of the company/division point of contact responsible for negotiating with the

Government.

7.7.2 Small Business and Joint Venture

Small businesses who intend to enter into a joint venture must still meet the 15 percent requirement per FAR 52.219-14 and must include in their

Contract Documentation Volume IV, evidence of a formal/informal joint venture to include setting up a System for Award Management (SAM) account (http://www.sam.gov) that includes a CAGE code, and a DUNS

Number.

7.8 Exceptions to Solicitation Requirements

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content provided in Table 2, Solicitation Exceptions, below.

Table 2: Solicitation Exceptions

SOLICITATION

Document

Page/

Paragraph

Requirement/

Portion

Rationale

SOW, Model Contract, Section L, etc.

Applicable Page and Paragraph

Numbers

Identify the requirement or portion to which exception is taken

Describe why the requirement can/will not be met

Appendix I: Downloading the PPI Tool

APPENDIX I: DOWNLOADING THE PPI TOOL

The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the Beta.Sam site (https:/beta.sam.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA8224-13-R-DOCAT4.mdb).

Note: PPI Tools saved in Microsoft version 2007 and greater will be saved with “.accdb” file extension.

Entering information in the PPI Tool

After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

. The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

Note:

Files saved using Microsoft Office 2010 will have the “Enable Content” button on the

“Security Warning” banner and therefore will not get a Security Alert pop-up.

If a "read only" file is opened, in order to populate data in the file, click "Save As" in the

"Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA8224-18-R-0008.mdb).

3. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

https://www.fbo.gov/

Figure 2: Setup Pop-Up

4. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

5. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

6. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

7. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each contributing contracting organization before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

8. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

9. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

Contractor’s Name: Self-explanatory

Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select

“Other.”

Place of Work: Location where contractor will perform work.

Percentage of Work: Identify percentage of work contributed by specified contracting organization.

Responsibilities: Detail responsibilities of specified contracting organization.

10. Select one of the buttons at the bottom of the screen.

Add – Saves the current business relationship and allows for the addition of a new one.

Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

11. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

12. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past

Performance” screen displays.

Figure 8: Past Performance

13. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

14. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

Contract Information Tab

Contractor: Select from the dropdown the appropriate contractor.

Cage Code: Self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

Program Title: Enter full name of program.

Contracting Agency/Customer: Enter servicing contracting agency and customer

(office symbols suffice).

DUNS Number: Self-explanatory

Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite

Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost

Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter

“N/A.”

Contract Dollar Value:

o Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

Period of Performance (mm/dd/yy) o Start Date: Input start date of contract.

o Original End Date: Input original end date based on award.

o Current End Date: Input end date, as the contract stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End

Date.”

Program Details Tab

Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o ****If applicable: Provide information on problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

Explain how your experience on this program is relevant for each subfactor under the

Technical Factor in Section M of the RFP, including any unique aspects that demonstrate relevancy in this effort. Provide evidence to support how the contract referenced has relevant experience and demonstrates the ability to perform the solicitation requirements as described in Section M of the RFP. As applicable, address how the proposed reference relates to each of the Technical Subfactors.

POC & Key Individuals Tab

Customer Points of Contact: Click the “Program/Site Manager,” “Contracting

Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

15. Select from the buttons at the bottom of the Past Performance screen:

Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

16. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool

In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.”

The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission

Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the Past Performance Volume subject to the limitations outlined in this RFP and should be Tab 1 of the Past Performance Volume.

Note:

Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal.

Enter the filename as the prime contractor + RFP number + file extension (e.g.

XYZCompanyFA8224-18-R-0008.mdb).

Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

Appendix II: Cross Reference Matrix

Appendix II: Cross Reference Matrix

Subparagraphs may or may not apply. See specific instructions in the Section L paragraphs for details.

Cross Referencing Matrix

Offeror’s Proposal

Paragraph Number(s) Section L Section M SOW Paragraph Vol

File details come from the government source that posted it. Updated .