Attachment 05 - Hill AFB Construction and Demolition Waste Diversion Report.pdf
PDF 101 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA820121R0007
About this file
This notice provides details on an upcoming solicitation for construction services under the Simplified Acquisition of Base Engineering Requirements (SABER) contract at Hill Air Force Base in Utah. The Air Force Materiel Command Air Force Sustainment Center intends to issue a request for proposal for a six-year indefinite delivery/indefinite quantity contract set aside for 8(a) small businesses located near Hill AFB. The anticipated contract line items include fixed-price construction projects, a post-award conference, and additional fixed-price construction projects. Interested parties are encouraged to provide feedback on draft documents by December 28, 2020, and the official RFP is expected to be released the first week of January 2021 with proposals due 40 days later. A pre-proposal site visit for an initial seed project is planned for mid-January 2021.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill AFB Construction and Demolition Waste Diversion Report
Project Title:
Task Order No.:
Capital Project No.:
Project Manager:
Contractor:
MATERIAL
Reused Recycled Disposed
Recycling Service Provider Used (tons) (tons) (tons)
Asphalt 0.0 0.0 0.0 Cardboard 0.0 0.0 0.0 Concrete 0.0 0.0 0.0 Dry Wall 0.0 0.0 0.0 Green Waste 0.0 0.0 0.0 Lumber/Wood 0.0 0.0 0.0 Metal(s) 0.0 0.0 0.0 Rock/Stone 0.0 0.0 0.0 Other: 0.0 0.0 0.0 Other: 0.0 0.0 0.0
TOTALS 0.0 0.0 0.0
Attach copy of weigh tickets or estimate;
Provide justification for not diverting recyclable materials
Total recycled and reused 0.0 tons Total material disposed 0.0 tons Total solid Waste 0.0 tons Percent recycled or reused [(A/C )x100]:
Contractor Superintendent Signature Date
Construction and Demolition (C&D) debris typically includes concrete, copper piping, copper wire, steel and other metals, wood, ceramic tile, porcelain bathroom fixtures, asphalt, intact building components (doors, windows, cabinets, ceiling fans, etc.), gypsum wallboard, and roofing material. C&D debris DOES NOT include dirt/soil removed from construction sites.
File details come from the government source that posted it. Updated .