Attachment 05 - Hill AFB Construction and Demolition Waste Diversion Report.pdf

PDF 101 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA820121R0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This notice provides details on an upcoming solicitation for construction services under the Simplified Acquisition of Base Engineering Requirements (SABER) contract at Hill Air Force Base in Utah. The Air Force Materiel Command Air Force Sustainment Center intends to issue a request for proposal for a six-year indefinite delivery/indefinite quantity contract set aside for 8(a) small businesses located near Hill AFB. The anticipated contract line items include fixed-price construction projects, a post-award conference, and additional fixed-price construction projects. Interested parties are encouraged to provide feedback on draft documents by December 28, 2020, and the official RFP is expected to be released the first week of January 2021 with proposals due 40 days later. A pre-proposal site visit for an initial seed project is planned for mid-January 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment 07- Wage Determination - Box Elder County - 3 Jan 2020.pdf PDF
Attachment 10- Wage Determination - Sublette County WY - 14 Jan 2020.pdf PDF
Attachment 13 - SABER Seed Project SOW - Bldg. 100.pdf PDF
Attachment 14 - Seed Project Pricing Matrix.xlsx XLSX spreadsheet
SABER Question-Comment Matrix.xlsx XLSX spreadsheet
Solicitation - FA820121R0007.pdf PDF
Attachment 04 - BASE FACILITY DESIGN STANDARD 19 OCT 2020.docx DOCX document
Attachment 08- Wage Determination - Daggett-Duchesne-Rich-Summit Counties - 3 Jan 2020.pdf PDF
Attachment 11- Wage Determination - Davis County - 3 Jan 2020.pdf PDF
Attachment 12 - Wage Determination - Salt Lake County - 31 Jan 2020.pdf PDF
Attachment 01 - SABER 2021 DRAFT SOW.pdf PDF
Attachment 06- Bona Fide Office Requirements.pdf PDF
Attachment 15 - SABER Section L.pdf PDF
Attachment 02 - SABER TEP Matrix.xlsx XLSX spreadsheet
Attachment 03 - Architectural Compatibility Plan (ACP).pdf PDF
Attachment 09- Wage Determination - Morgan-Weber Counties - 3 Jan 2020.pdf PDF
Attachment 16 - SABER Section M.pdf PDF
SABER 2021 DRAFT SOW.pdf PDF
Draft SABER Solicitation - FA820121R0007.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hill AFB Construction and Demolition Waste Diversion Report

Project Title:

Task Order No.:

Capital Project No.:

Project Manager:

Contractor:

MATERIAL

Reused Recycled Disposed

Recycling Service Provider Used (tons) (tons) (tons)

Asphalt 0.0 0.0 0.0 Cardboard 0.0 0.0 0.0 Concrete 0.0 0.0 0.0 Dry Wall 0.0 0.0 0.0 Green Waste 0.0 0.0 0.0 Lumber/Wood 0.0 0.0 0.0 Metal(s) 0.0 0.0 0.0 Rock/Stone 0.0 0.0 0.0 Other: 0.0 0.0 0.0 Other: 0.0 0.0 0.0

TOTALS 0.0 0.0 0.0

Attach copy of weigh tickets or estimate;

Provide justification for not diverting recyclable materials

Total recycled and reused 0.0 tons Total material disposed 0.0 tons Total solid Waste 0.0 tons Percent recycled or reused [(A/C )x100]:

Contractor Superintendent Signature Date

Construction and Demolition (C&D) debris typically includes concrete, copper piping, copper wire, steel and other metals, wood, ceramic tile, porcelain bathroom fixtures, asphalt, intact building components (doors, windows, cabinets, ceiling fans, etc.), gypsum wallboard, and roofing material. C&D debris DOES NOT include dirt/soil removed from construction sites.