FA8201-20-R-0018 Draft RFP Q and A Matrix - 10 Sep 2020.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Hill AFB Multiple Award Construction Contract (MACC IV)
Solicitation number
FA8201-20-D-MACC
Issued by

About this file

This document contains a request for information (RFI) and draft statement of work for the Hill Air Force Base Multiple Award Construction Contract IV (MACC IV). The Air Force Sustainment Center is seeking sources to conduct design and construction services for maintenance, repair, alteration, and new construction projects at Hill Air Force Base, Utah. The North American Industry Classification System code for this opportunity is 236220 for commercial and institutional building construction with a small business size standard of $36.5 million. The scope of work will include multiple disciplines such as design, demolition, utilities, excavation, structures, electrical, mechanical, architectural, and general construction. Interested parties are requested to respond with their small business status and teaming arrangements by October 23rd. An industry day will be held November 5-7, 2020 at Hill Air Force Base to provide additional details on the requirement.

View the file

Other files

File Type Posted
Attachment 02 - MACC IV Section L - 22 Sep 2020.docx DOCX document
Attachment 03 - MACC IV Section M - 22 Sep 2020.docx DOCX document
FA8201-20-R-0018 Draft RFP Q and A Matrix - 22 Sep 2020.xlsx XLSX spreadsheet
Attachment 01 - MACC IV - Basic SOW 22 Sep 2020.docx DOCX document
Attachment 03 - DRAFT MACC IV Section M - 18 Sep 2020.docx DOCX document
FA8201-20-R-0018 Draft RFP Q and A Matrix - 18 Sep 2020.xlsx XLSX spreadsheet
Attachment 02 - DRAFT MACC IV Section L - 18 Sep 2020.docx DOCX document
Attachment 04 - DRAFT TEP Matrix - 18 Sep 2020.xlsx XLSX spreadsheet
DRAFT Solicitation - FA820120R0018 - 18 Sep 2020.pdf PDF
Attachment 40 - Draft MACC IV PPI Tool.docx DOCX document
Attachment 02 - DRAFT MACC IV Section L - 9 Sep 2020.docx DOCX document
Attachment 03 - DRAFT MACC IV Section M - 9 Sep 2020.docx DOCX document
Attachment 01 - DRAFT MACC IV Basic SOW - 9 Sep 2020.docx DOCX document
FA8201-20-R-0018 Draft RFP Q and A Matrix.xlsx XLSX spreadsheet
Attachment 02 - DRAFT MACC IV Section L - 2 Sep 2020.docx DOCX document
Attachment 03 - DRAFT MACC IV Section M - 2 Sep 2020.docx DOCX document
DRAFT Solicitation 1 Sept 20 - FA820120R0018.pdf PDF
MACC IV - Consolidation DF - 20 AUG 2020_Redacted.pdf PDF
Attachment 01 - DRAFT MACC IV Basic SOW - 21 Aug 2020.docx DOCX document
Solicitation - FA820120R0018.pdf PDF
Attachment 39 - Wage Determination - Salt Lake County - 31 Jan 2020.pdf PDF
Attachment 36 - Wage Determination - Morgan-Weber Counties - 3 Jan 2020.pdf PDF
Attachment 37 - Wage Determination - Sublette County WY - 14 Jan 2020.pdf PDF
Attachment 04 - DRAFT TEP Matrix.xlsx XLSX spreadsheet
Attachment 05 - DRAFT MACC IV Sample Project SOW - 21 Aug 2020.docx DOCX document
Attachment 02 - DRAFT MACC IV Section L - 21 Aug 2020.docx DOCX document
Attachment 03 - DRAFT MACC IV Section M - 21 Aug 2020.docx DOCX document
Attachment 34 - Wage Determination - Box Elder County - 3 Jan 2020.pdf PDF
Attachment 35 - Wage Determination - Daggett-Duchesne-Rish-Summit Counties - 3 Jan 2020.pdf PDF
Attachment 38 - Wage Determination - Davis County - 3 Jan 2020.pdf PDF
MACC IV IDIQ Industry Day Slides 20191016 Rev4.pptx PPTX presentation
Attachment_05_-_Basic_SOW_01_Oct_2019.pdf PDF
Question_Matrix.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic SOW

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response

Section L

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response
1Section L: 3.3.3 – Subfactor 3Attachment 2 – Section L: 3.3.3 – Subfactor 3, Contractor RequirementsParagraphs B and C each require three projects. Please clarify whether a TOTAL of three project examples are required (B and C), or a TOTAL of six projects (B + C).A TOTAL of three (3) project examples are required for Paragraph B, and a TOTAL of three (3) project examples is required for Paragraph C. Offerors are allowed to use the same example project for Paragraph B and C as long as they meet the requirements of each.
2Section L 1.3, 1.3.1 GeneralSection L 1.3, 1.3.1 General, Table 1: Proposal OrganizationThere is no page limit stated for Subfactor 4 AND it is not included in the 200-page limit for Volume II. Please confirm that there is no page limit on Subfactor 4.The page numbers for each Subfactor have been corrected. Subfactor 1 has been changed to 30 pages, and Subfactor 4 has been included as 100 pages. The total pages for Volume II is now 230.
3Section L 4.0Section L: 4.0, Volume III, Factor 3: Past PerformancePlease explain “3 pages per submission” – Does “submission” equal “project example”?Yes, each project submission is limited to three (3) pages a piece.
4Section L (various paragraphs)Section L (various paragraphs) regarding Volume I A-E and Constructor Example Projects (format per Appendix C, Example Project) and Volume III, Factor 3, Past Performance (Appendix A, Past Performance Questionnaire).These requirements seem to be redundant. Please explain the difference between these two requirements.Section L Volume I does not require example project submission.

Section L Volume II - Example projects are used to determine technical proficiency - no evaluation of how the offeror performed on the example projects is considered under this volume.

Section L Volume III – Past projects are used to determine how well the contractor performed.

These may not be the same projects, it will be up to the Offeror to decide whether or not one project can meet the criteria of Volume I and Volume III.

5Section L 3.3.1.1 & 3.3.4.1Section L 3.3.1.1 (SUBFACTOR 1, Basic MACC IV Plans), regarding a Safety Plan – states: “Offeror shall submit an initial Contract Occupational Safety and Health Plan that meets the requirements outline in MACC IV Basic SOW, Section 3.3.1 and Appendix C.”
Section L 3.3.4.1, regarding SUBFACTOR 4 - the solicitation states: “Offeror shall submit a tailored Safety Plan that meets the requirements outlined in the Sample Project SOW, Section 5.4.”How do these two requirements differ, if at all, and where should the response be presented in the proposal if these requirements are for the same information?The Government has updated Section L 3.3.4.1 to rename the "Safety Plan" to the "Safety/Accident Prevention Plan."

The Government expects these two plans to differ. The Safety Plan required in Section L 3.3.1.1 is for the overall Basic MACC IV. The Safety/Accident Prevention Plan required in Section L 3.3.4.1 is for the Sample Project and shall be tailored for it.

6 Section L 3.3.1.2 & 3.3.4.2 Section L 3.3.1.2 (SUBFACTOR 1, Basic MACC IV Plans), regarding a Construction Quality Control Plan – states, in part, “Offeror shall submit an initial Contraction QCP that meets the requirements outlined in MACC IV Basic SOW Section 3.1 and IAW UFGS 01 45 00.”

Section L 3.3.4.2, regarding SUBFACTOR 4 – the solicitation states: “Offeror shall submit a tailored Quality Control Plan that meets the requirements outlined in the Sample Project SOW, Section 5.5.” How do these two requirements differ, if at all, and where should the response be presented in the proposal if these requirements are for the same information? The Government has updated Section L 3.3.4.2 and 3.3.4.2 to rename the "Quality Control Plan" to the "Construction Quality Control (CQC) Plan."

The Government expects these two plans to differ. The CQC Plan required in Section L 3.3.1.2 is for the overall Basic MACC IV.

The CQC Plan required in Section L 3.3.4.2 is for the Sample Project and shall be tailored for it.

7 Section L 3.3.2-c & Section M 4.2.-c L 3.3.2-c and M.4.2-c – require that the proposal provide “an example of a past project that was designed by the partnered A-E firm and was successfully certified as LEED Silver or higher certification” Most frequently, projects designed and built for the Government – and especially for DOD – are required to be built to LEED guidelines, but are not required to be certified. Will the Government consider accepting a project example that was built to LEED guidelines, but not certified? Yes, Section L 3.3.2-c, and Section M 4.2-c have been updated to reflect this. In addition, the Basic SOW Section 1.4.2 has been updated to include the UFC reference for energy efficient buildings, which the offeror must provide detail showing they followed this guidance if they do not have a LEED silver or higher certificate.

Section M

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response

1 Section M Section M, Volume III, Factor 3, Past Performance, Section M.5.0. The second paragraph of M.5.0 states, “In addition any information regarding Offeror’s current having one (1) or more current Cure Notices at the time of the RFP issue date will result in an automatic rating of unacceptable for the Past Performance Factor and disqualification for award.” Where should the response to this requirement be presented? It is not mentioned in Section L, Instructions for Past Performance. This does not necessarily require an Offeror response. The Government will evaluate the past performance the Offeror provides; however, in accordance with Section L 4.1, "Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance." If the Government obtains data that indicates an Offeror has a current cure notice due to poor performance at the time of the RFP issue date, then, the Offeror will receive an Unacceptable rating.

Section M 5.0 has been updated to state, “In addition any information regarding Offerors currently having one (1) or more Cure Notices due to poor performance at the time of the RFP issue date will result in an automatic rating of unacceptable for the Past Performance Factor and disqualification for award.”

TEP

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response

Sample Task Order SOW

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response
1Sample ProjectVarious references to “Sample Project.”Will the Sample Project be awarded, or is it for evaluation purposes only?The Sample Project will not be awarded as the first task order, but it is an awardable project and may be awarded as a future task order under the MACC IV IDIQ.
2Sample ProjectSection L 3.3.4.5; Attachment 5, Sample Project SOW para. 6.2; Section M para. 4.4.6, Architectural Plan; Attachment 1, SOW paragraphs 1.3.2.1 and 1.4.2.2; and Attachment, Basic SOW paragraphs 1.2.2.1 and 1.2.2.2Attachment 5, Sample Project SOW, paragraph 6.2 requires a 15% design submittal. All other references to design submittals are 30%, 60%, 90%, and 100% submittals. Please confirm that the 15% design submittal is for evaluation purposes only.Yes, the 15% design submittal required is for evaluation purposes. Section L 3.3.4.5 and Section M 4.4.6 have been updated to reflect 15%.

Draft Solicitation

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-20-D-MACC Sept. 2020
Question #ReferenceDiscussionQuestion/CommentGovernment Response
1Draft SolicitaionProposal Due DateIs October 14, 2020 the actual date of the Solicitation, or is this a Draft date?Please see response to Question 4 in the Draft Solicitation Tab of FA8201-20-R-0018 Draft RFP Q and A Matrix, posted on September 2, 2020.
2Draft SolicitaionAttachmentsSection J of the RFP lists 40 attachments. According to that list, there are attachments that were not posted with the solicitation. They are: #6 through #32 and #40. Also, Section J does not list an Attachment #33. Please clarify.As stated within the posting, these attachments are available in the bidder's library which must be requested by emailing the three (3) points of contact listed within the posting description.
3Draft SolicitaionProposal SubmissionWould the government consider allowing for electronic submittal of the MACC IV proposals, given the uncertainty of deliveries due to the COVID pandemic?The Government would still like to have printed copies to review. Additional instructions for proposal delivery have been included in Section L 1.1.