Clearing for Civil Works
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION TABLE OF CONTENTS DIVISION 31 - EARTHWORK SECTION 31 10 00
CLEARING FOR CIVIL WORKS
08/08
PART 1 GENERAL
| 1.1 | UNIT PRICES |
| 1.1.1 | Clearing Brush |
| 1.1.1.1 | Payment |
| 1.1.1.2 | Unit of Measure |
| 1.2 | DEFINITIONS |
| 1.2.1 | Brush |
| 1.3 | PROJECT/SITE CONDITIONS |
| 1.3.1 | Aesthetics and Pollution Control |
| 1.3.1.1 | Ground Areas |
| 1.3.1.2 | Construction Roads |
| 1.3.2 | Existing Conditions |
| 1.3.2.1 | Boundaries |
| 1.3.2.2 | Markings of Zones |
| 1.3.2.3 | Zones |
| 1.3.2.4 | Fences |
PART 2 PRODUCTS
PART 3 EXECUTION
| 3.1 | CLEARING REQUIREMENTS |
| 3.1.1 | Brush |
| 3.1.2 | Equipment |
| 3.2 | DISPOSAL OF MATERIAL |
| 3.2.1 | General |
| 3.2.2 | Burning |
| 3.2.3 | Burial |
| 3.2.4 | Removal from Site |
| 3.3 | DEBRIS |
| 3.4 | MARKETABLE MATERIALS |
| 3.5 | LOCATIONS |
-- End of Section Table of Contents --
SECTION 31 10 00
Page
SECTION 31 10 00
CLEARING FOR CIVIL WORKS
08/08
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Clearing Brush
1.1.1.1 Payment
Payment will be made for costs associated with furnishing plant, labor, materials and equipment, and performing all operations necessary for clearing brush as specified.
1.1.1.2 Unit of Measure
Unit of measure: lump sum.
1.2 DEFINITIONS
1.2.1 Brush
Brush is that growth which is less than 2 inches in diameter measured 6 inches from the ground on the uphill side and is less than 6 feet in height measured from the ground on the uphill side.
1.3 PROJECT/SITE CONDITIONS
1.3.1 Aesthetics and Pollution Control
1.3.1.1 Ground Areas
All ground areas in the zone of normal pool level fluctuations which are disturbed by clearing operations and which would become subject to erosion will be protected or restored.
1.3.1.2 Construction Roads
All construction roads proposed for use by the Contractor for access to the work area shall be approved, as to location and alignment, prior to construction. Where such roads are determined to be of no value to project operation or will not serve recreational access needs after project construction, the areas occupied by these roads will be restored as nearly as possible to pre-construction conditions by reasonable grading and seeding as directed along with the planting of seedling trees if in a tree cover area.
1.3.2 Existing Conditions
1.3.2.1 Boundaries
The area to be cleared under this section is the zone having the general limits as indicated on the aerial photographs, which form a part of each individual task order Statement of Work under this contract.
1.3.2.2 Markings of Zones
The contour lines have been established in the field by the Government. The property lines or contour lines may be requested to be identified by stakes on the lines. Other boundaries are marked by identifiable topographical features or by section or fractional section lines.
1.3.2.3 Zones
The boundaries of the zone are as described in paragraph BOUNDARIES.
1.3.2.4 Fences
All fences shall be cleared as shown in each individual task order Statement of Work.
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
3.1 CLEARING REQUIREMENTS
3.1.1 Brush
The cutting of brush may be required.
3.1.2 Equipment
Necessary equipment to clear brush may be used at the option of the Contractor in all brush clearing operations.
3.2 DISPOSAL OF MATERIAL
3.2.1 General
The material cleared from the areas shall be completely removed by transporting from the Government property as approved by the Contracting Officer. In no case shall cleared material be thrown into or left in any creeks or rivers. The cutting of brush and debris remaining after clean-up, in order to avoid removal, will not be permitted.
3.2.2 Burning
Burning will not be permitted.
3.2.3 Burial
Burial of debris will not be permitted.
3.2.4 Removal from Site
Haul concrete debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in task Statement of Work. Haul asphalt debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in each individual task order Statement of Work. Haul other debris to Class I, II, III, V, or VI landfill off base.
3.3 DEBRIS
Debris shall include trash of all kinds.
3.4 MARKETABLE MATERIALS
Any of the cleared materials which the Contractor considers marketable shall become its property and shall be removed from the project area.
3.5 LOCATIONS
The locations of brush and debris to be cleared are along the fence lines as shown in the task specific Statement of Work.
-- End of Section --