FA8201-15-B-0002-0001.pdf

PDF 39 KB Posted

Attached to
Hill AFB Perimeter Fence Removal/Replacement Federal contract opportunity
Solicitation number
FA8201-15-R-PERIMETERFENCE
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Hill AFB Perimeter Fence Removal/Replacement, newest first.
File Type Posted
Revised_SOW_Perimeter_Fence _Golf_Course_to_Roy_Gate_and_1100's.doc DOC document
UFGS_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
Revised_SOW_Perimeter_Fence_Golf_Course_to_Roy_Gate_and_1100's.doc DOC document
Contractor_QA_FA8201-15-B-0002_w_answers.doc DOC document
New_Project_Photos.pdf PDF
Untitled .pdf PDF
SOW_Perimeter_Fence_Golf_Course_to_Roy_Gate_and_1100's.doc DOC document
March_2015_BASE_FACILITY_DESIGN_STANDARD.doc DOC document
APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_March_2015.doc DOC document
UFGS_01_20_00.00_20_Price_and_Payment_Procedures.doc DOC document
01_35_26_Government_Safety_Requirements.doc DOC document
UFGS_01_62_35_Recycled_-_Recovered_Materials.doc DOC document
UFGS_01_11_00_Summary_of_Work.doc DOC document
UFGS_32_31_13.53_High-Security_Chain_Link_Fences_and_Gates.doc DOC document
01_32_00_Project_Schedule.doc DOC document
FA8201-15-B-0002.doc DOC document
UFGS_31_31_16.13_Chemical_Vegetation_Control.doc DOC document
UFGS_32_31_13_Chain_Link_Fences_and_Gates.doc DOC document
UFGS_02_41_00_Demolition_and_Deconstruction.doc DOC document
01_57_20_Environmental_Protection.doc DOC document
01_00_00_General_Requirements.doc DOC document
UFGS_32-12-16_HMA.doc DOC document
UT150108_Jun_5_2015.pdf PDF
UFGS_31_10_00_Clearing_for_Civil_Works.doc DOC document
UFGS_32_16_13_Concrete_Sidewalks _Curb _Gutter.doc DOC document
UFGS_32-13-13.06_PCC.doc DOC document
UFGS_31_00_00_Earthwork.doc DOC document
UFGS_28_20_01.00_10_Electronic_Security_System_-_Vindicator.doc DOC document
Synopsis.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the necessary changes into the IFB based on the information gathered from the Site Walk on 06 Aug. Clauses have been added/amended; the SOW has been updated; additional site pitcures have been incorporated; and the Contractor Q&A and Site Visit Attendance sheets have been released.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8201-15-B-0002

X 9B. DATED (SEE ITEM 11)

23-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2015

CODE

OL:H/PZIO

PZIOC LT TREVOR WADE

6038 ASPEN AVE B1289NE

HILL AFB UT 84056-5805

FA8201 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8201-15-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Remove/Replace approximately 6.2 miles of existing perimeter chain link fence at Hill AFB IAW the SOW dated 22 June 2015. to Remove/Replace existing perimeter chain link fence at Hill AFB IAW the SOW dated 17 Aug 2015..

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.219-14 Limitations On Subcontracting NOV 2011 52.228-1 Bid Guarantee SEP 1996

The following have been modified:

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen (15) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 SOW 10 21-JUL-2015 Attachment 10 UFGS 01 20 00.00 20

Price and Payment

Procedures Attachment 11 UFGS 01 62 35 Recycled

- Recovered Materials

Attachment 12 UFGS 02 41 00 Demolition and Deconstruction

Attachment 13 UFGS 28 20 01.00 10 Electronic Security System - Vindicator

Attachment 14 UFGS 31 00 00 Earthwork

Attachment 15 UFGS 31 10 00 Clearing for Civil Works

Attachment 16 UFGS 31 31 16.13 Chemical Vegetation Control

Attachment 17 UFGS 32 16 13 Concrete Sidewalks, Curb, Gutter

Attachment 18 UFGS 32 31 13 Chain Link Fences and Gates

Attachment 19 UFGS 32 31 13.53 High Security Chain Link Fences and Gates

Attachment 2 Davis Bacon Wage Determination

5 05-JUN-2015

Attachment 20 UFGS 32 12 16 HMA 31 Attachment 21 UFGS 32 13 13.06 PCC 25 Attachment 3 Appendix C Master 15 Attachment 4 Base Facility Design

Standards

Attachment 5 01 00 00 General Requirements

Attachment 6 01 32 00 Project Schedule 5 Attachment 7 01 35 26 Government

Safety Requirements

Attachment 8 01 57 20 Environmental Protection

Attachment 9 UFGS 01 11 00 Summary of Work to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Revised SOW 11 14-AUG-2015 Attachment 10 UFGS 01 20 00.00 20

Price and Payment Procedures

Attachment 11 UFGS 01 62 35 Recycled

- Recovered Materials

Attachment 12 UFGS 02 41 00 Demolition and Deconstruction

Attachment 13 UFGS 28 20 01.00 10 Electronic Security System - Vindicator

Attachment 14 UFGS 31 00 00 Earthwork

Attachment 15 UFGS 31 10 00 Clearing for Civil Works

Attachment 16 UFGS 31 31 16.13 Chemical Vegetation Control

Attachment 17 UFGS 32 16 13 Concrete Sidewalks, Curb, Gutter

Attachment 18 UFGS 32 31 13 Chain Link Fences and Gates

Attachment 19 UFGS 32 31 13.53 High Security Chain Link Fences and Gates

Attachment 2 Davis Bacon Wage Determination

5 05-JUN-2015

Attachment 20 UFGS 32 12 16 HMA 31 Attachment 21 UFGS 32 13 13.06 PCC 25 Attachment 3 Appendix C Master 15 Attachment 4 Base Facility Design

Standards

Attachment 5 01 00 00 General Requirements

Attachment 6 01 32 00 Project Schedule 5 Attachment 7 01 35 26 Government

Safety Requirements

Attachment 8 01 57 20 Environmental Protection

Attachment 9 UFGS 01 11 00 Summary of Work

(End of Summary of Changes)