B3001G-Modernize Foyer Scope Drawings 3.13.26 - Copy.pdf

PDF 102 KB Posted

Attached to
19725785-Modernize Foyer, B3001G, Room 127
Solicitation number
FA813726R0044
Issued by

About this file

This document is a set of architectural design plans for a Foyer Modernization project at Tinker Air Force Base, Oklahoma. The project involves comprehensive renovation of a foyer space (Room 129) in Building B3001G, with work organized into demolition and new construction scopes.

The demolition scope includes removal of the existing double door and frame, acoustic ceiling, mechanical diffusers, light fixtures, sprinkler heads, electrical components back to the panelboard, fire protection systems, and fire extinguisher. The new work scope encompasses painting (tape, bed, texture Level 5 on all walls; prime and paint 3070 door jambs and slabs; prime and paint new 6070 door jamb; stain finish new 6070 double door slabs); door replacement (remove and replace grout-filled door jamb; provide and install new 6070 door jamb and two 3070 wood door slabs with vision light and hardware); acoustical treatments (remove existing suspension grid and ceiling tiles; install new 15/16" USG Donn XL/XLT suspension grid and new 2x2x3/4" ceiling tiles at 10'-0" AFF; furr out east, south, and west walls with 3 5/8" metal studs at 16" on center to 12'-0" height with wall ties and bracing). Additional scopes include mechanical work (remove and replace air devices with up to 10 linear feet of flex duct; provide pre- and post-TAB reports; remove steam piping), electrical work (temporary lighting, remove and replace light fixtures, remove and reinstall wall-mounted fire alarm devices, extend wall receptacles and card readers at furr-out locations, conduct fire alarm system testing), and fire suppression work (remove/plug existing heads before demolition; reinstall like-kind heads after grid installation; install new semi-recessed fire extinguisher cabinet in south wall). The plans are dated March 13, 2026, and marked as 35% review documentation not for construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

2 543

FOYER

ABW/SC

CONFERENCE

ROOM

08.01

08.02

08.02

08.02

09.02

09.01

09.0110.01

EXISTING GYP WALL,

PATCH AND PROVIDE

NEW PAINT

NEW RECESSED

SWITCH W/ COVER

PLATE

REMOVE AND

REINSTALL EXISTING

MANUAL PULL

STATION AT NEW

WALL FURRING NEW WORK SCOPE

1. PAINT SCOPE

A. TAPE, BED, TEXTURE (LEVEL 5) ALL WALLS

B. PRIME, PREP, PAINT ALL 3070 DOOR JAMBS & SLABS, INSIDE & OUT

C. PRIME, PREP, PAINT NEW 6070 DOOR JAMB

D. PREP AND STAIN FINISH NEW 6070 DOUBLE DOOR SLABS

2. DOOR SCOPE

A. REMOVE AND REPLACE 1 GROUT-FILLED DOOR JAMB & DOOR SLABS.

B. PROVIDE AND INSTALL NEW 6070 DOOR JAMB.

C. PROVIDE AND INSTALL (2) 3070 WOOD DOOR SLABS WITH VISION

LIGHT AND HARDWARE.

3. ACOUSTICAL TREATMENTS

A. REMOVE EXISTING 2X4 SUSPENSION GRID SYSTEM.

B. REMOVE EXISTING 2X4 CEILING TILES.

C. PROVIDE AND INSTALL NEW 15/16" USG DONN XL/XLT SUSPENSION

GRID.

D. PROVIDE AND INSTALL NEW 2X2 X 3/4" CEILING TILE, USG #: XXXXX

(FAA TYP.).

E. FURR OUT EAST, SOUTH, AND WEST WALLS WITH 3 5/8" METAL

STUDS AT 16" O.C., 12'-0" TALL.

F. PROVIDE WALL TIES ATTACHING METAL STUDS TO CMU/BRICK

WALLS FOR SUPPORT.

G. PROVIDE WALL BRACING AT TOP OF WALL TO STRUCTURE ABOVE AT

48" O.C.

4. EXISTING FINSIHES

A. COVER AND PROTECT EXISTING FLOORING

B. PROPERLY SEAL ALL NEW WALLS, FLOORS & CEILING

PENETRATIONS WITH UL-LISTED FIRE-STOPPING MATERIALS

5. MECHANICAL

A. REMOVE AND REPLACE EXISTING AIR DEVICES (SUPPLY AND

RETURN). PROVIDE UP TO 10 LF OF FLEX DUCT TO CONNECT NEW

DEVICE TO EXISTING DUCTWORK.

B. PROVIDE PRE- AND POST-TAB REPORT ON DEVICES.

C. REMOVE STEAM PIPING BELOW CEILING TO CREATE UNIFORM

CEILING FINISH AFTER DEMOLITION.

6. ELECTRICAL

A. PROVIDE TEMPORARY LIGHTING DURING CONSTRUCTION.

B. REMOVE AND REPLACE LIGHT FIXTURES.

C. REMOVE AND REINSTALL WALL-MOUNTED FA DEVICES. INSTALL IN

CEILING OR WITHIN NEW WALLS AS REQUIRED.

D. EXTEND EXISTING WALL RECEPTACLES AT NEW WALL FURR-OUT

LOCATIONS.

E. EXTEND CARD READERS AT NEW WALL FURR-OUT LOCATIONS.

F. COORDINATION WITH BASE FIRE MARSHALL AND CONDUCT PRE-

AND POST-TEST FIRE ALARM SYSTEMS.

G. ACCESS CONTROL BY OWNER.

7. FIRE SUPPRESSION

A. REMOVE / PLUG EXISTING FIRE SUPPRESSION HEADS BEFORE

DEMOLITION.

B. REINSTALL / PROVIDE NEW LIKE-KIND FIRE SUPPRESSION HEADS

AND DROPS AT EXISTING LOCATIONS AFTER SUSPENSION GRID

SYSTEM INSTALLATION.

C. PROVIDE AND INSTALL NEW SEMI-RECESSED FIRE EXTINGUISHER

CABINET IN SOUTH WALL.

DEMOLITION SCOPE

1. REMOVE EXISTING DOUBLE DOOR & FRAME

2. REMOVE EXISTING ACT CEILING, MECH DIFFUSERS, LIGHTS & SPRINKLER

HEADS

3. REMOVE EXISTING ELECTRICAL BACK TO PANELBOARD

4. REMOVE EXISTING FIRE PROTECTION SYSTEM BAG & LABEL ALL FIRE

ALARM DEVICES. REINSTALL & RE-CERTIFY THE SYSTEM

5. REMOVE EXISTING FIRE EXTINGUISHER

6. EXISTING FLOOR TO REMAIN, PROTECT IN PLACE

A

B

2 543

FOYER

ABW/SC

CONFERENCE

ROOM

02.01

02.05

ACCESS CONTROL

BY OWNER

SALVAGE SIGN FOR

REINSTALLATION

DEMO ABANDONED

EQUIPMENT

A

B

2 543

FOYER

ABW/SC

CONFERENCE

ROOM

09.03

23.01

23.01

26.01

NEW EXIT LIGHT

NEW EMERGENCY LIGHT

11' - 0"

ADJUST SPRINKLER

HEAD LOCATION TO

WORK WITH NEW ACT

LAYOUT, TYP.

NEW RECESSED DUPLEX

W/ COVER PLATE, NEAR

CEILING

REMOVE AND REINSTALL

EXISTING STROBE AT NEW

WALL FURRING

A

B

2 543

FOYER

ABW/SC

CONFERENCE

ROOM

02.02

02.03

02.04

DEMO EMERGENCY LIGHT

DEMO PIPING ASSEMBLY

DEMO EMERGENCY LIGHT

11' - 0"11' - 0"

EXISTING NETBOX BY

OWNER, KEEP IN PLACE

EXISTING WIFI BY OWNER

DEMO WALL MOUNTED

EXISTING DUPLEX NEAR

CEILING

1/4" = 1'-0"C3

FIRST FLOOR PLAN

TINKER AFB, OK

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K L A

H O

M A

P R

O J E

C T

I N

F O

R M

A T

IO

N

R E

V

IS

IO

N

S

M A

R K

D E

S

IG

N G

R O

U P

D R

A W

N B

Y

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

D E

S C

R

IP

T

IO

N

1 2 3 4 5

E

D

C

B

A

M A

N A

G E

M E

N T

I N

F O

R M

A T

IO

N

1 2 3 4 5

E

D

C

B

A

IS

S

U E

D A

T E

SHEET OF

SHEET NUMBER

S H

E E

T T

IT

L E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

D E

S

IG

N F

IL

E

L O

C A

T

IO

N

L A

R S

O N

D E

S

IG

N G

R O

U P

55 xx

N O T

F O

R

CONS TRUC

T I O

N

35% REVIEW

This document is preliminary in nature signed and sealed document.

and is not a final, Z R H D

P .C C E R T

IF

IC

A T E

O F

A U T H O R

IZ

A T

IO

N C A

E X P

IR

A T

IO

N

D A T E

JU

N E

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group xx

C U s e rs b h u n te r\ D o c u m e n ts F o y e r M o d

B 1G v2 b h u n te r4 A J L F .r v t

:3 :1

A M

-1

-2

P

R

IC

IN

G

U P

D A

T E

S

A-110

D E

M O

P L A

N S

F L O

O R

R

C P

P L A

N S

B G

D

O O

R

G

M L U

K S

IK

M S

H

IP

L E

R

B H

U N

T E

R

M A

R C

H

F O

Y E

R M

O D

E R

N

IZ

A T

IO

N

KEY NOTES

02.01 REMOVE EXISTING DOUBLE DOOR & FRAME

02.02 REMOVE EXISTING ACT CEILING

02.03 REMOVE EXISTING MECHANICAL DIFFUSERS

02.04 REMOVE EXISTING LIGHTS

02.05 REMOVE EXISTING FIRE EXTINGUISHER

08.01 NEW DOUBLE DOORS WITH COMMERCIAL HARDWARE

08.02 PAINT EXISTING SINGLE MAN DOORS

09.01 2-1/2" METAL STUD W/5/8" GWB (LEVEL 4 FINISH)TO 6" ABOVE CEILING

09.02 3-5/8" METAL STUD W/5/8" GWB (LEVEL 4 FINISH) TO STRUCT ABOVE

W/1-1/2" POLY ISO RIGID (R-7.6 MIN)

09.03 NEW 2'X2' ACT WITH DUNE 1774 TEGULAR EDGE MINERAL FIBER TILES.

CEILING @ 10'-0" AFF

10.01 NEW RECESSED FIRE EXT CABINET

23.01 NEW HVAC GRILLES & DIFFUSERS

26.01 NEW 4000K LED LIGHT FIXTURES

1/4" = 1'-0"A3

DEMOLITION - FIRST FLOOR PLAN

1/4" = 1'-0"C1

REFLECTED CEILING - FIRST FLOOR PLAN

1/4" = 1'-0"A1

DEMOLITION REFLECTED CEILING - FIRST FLOOR PLAN

(SEMI RECESSED)

11'-0" nick Strikethrough

AB

CONFE

RO

08.02 09.01

Sheets
A-110 - DEMO PLANS, FLOOR & RCP PLANS

File details come from the government source that posted it. Updated .