B3001G-Modernize Foyer Scope Drawings 3.13.26 - Copy.pdf
PDF 102 KB Posted
- Attached to
- 19725785-Modernize Foyer, B3001G, Room 127
- Solicitation number
- FA813726R0044
About this file
This document is a set of architectural design plans for a Foyer Modernization project at Tinker Air Force Base, Oklahoma. The project involves comprehensive renovation of a foyer space (Room 129) in Building B3001G, with work organized into demolition and new construction scopes.
The demolition scope includes removal of the existing double door and frame, acoustic ceiling, mechanical diffusers, light fixtures, sprinkler heads, electrical components back to the panelboard, fire protection systems, and fire extinguisher. The new work scope encompasses painting (tape, bed, texture Level 5 on all walls; prime and paint 3070 door jambs and slabs; prime and paint new 6070 door jamb; stain finish new 6070 double door slabs); door replacement (remove and replace grout-filled door jamb; provide and install new 6070 door jamb and two 3070 wood door slabs with vision light and hardware); acoustical treatments (remove existing suspension grid and ceiling tiles; install new 15/16" USG Donn XL/XLT suspension grid and new 2x2x3/4" ceiling tiles at 10'-0" AFF; furr out east, south, and west walls with 3 5/8" metal studs at 16" on center to 12'-0" height with wall ties and bracing). Additional scopes include mechanical work (remove and replace air devices with up to 10 linear feet of flex duct; provide pre- and post-TAB reports; remove steam piping), electrical work (temporary lighting, remove and replace light fixtures, remove and reinstall wall-mounted fire alarm devices, extend wall receptacles and card readers at furr-out locations, conduct fire alarm system testing), and fire suppression work (remove/plug existing heads before demolition; reinstall like-kind heads after grid installation; install new semi-recessed fire extinguisher cabinet in south wall). The plans are dated March 13, 2026, and marked as 35% review documentation not for construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Soliciation Amendment FA813726R00440002 SF 30.pdf | ||
| RFI Response 8-18.pdf | ||
| Submittal_register .pdf | ||
| PWS_Foyer Modernization.pdf | ||
| Sign In Sheet 8-10.pdf | ||
| wage determination.txt | TXT text file | |
| Solicitation Amendment FA813726R00440001 SF 30.pdf | ||
| Solicitation Amendment - FA813726R00440001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
2 543
FOYER
ABW/SC
CONFERENCE
ROOM
08.01
08.02
08.02
08.02
09.02
09.01
09.0110.01
EXISTING GYP WALL,
PATCH AND PROVIDE
NEW PAINT
NEW RECESSED
SWITCH W/ COVER
PLATE
REMOVE AND
REINSTALL EXISTING
MANUAL PULL
STATION AT NEW
WALL FURRING NEW WORK SCOPE
1. PAINT SCOPE
A. TAPE, BED, TEXTURE (LEVEL 5) ALL WALLS
B. PRIME, PREP, PAINT ALL 3070 DOOR JAMBS & SLABS, INSIDE & OUT
C. PRIME, PREP, PAINT NEW 6070 DOOR JAMB
D. PREP AND STAIN FINISH NEW 6070 DOUBLE DOOR SLABS
2. DOOR SCOPE
A. REMOVE AND REPLACE 1 GROUT-FILLED DOOR JAMB & DOOR SLABS.
B. PROVIDE AND INSTALL NEW 6070 DOOR JAMB.
C. PROVIDE AND INSTALL (2) 3070 WOOD DOOR SLABS WITH VISION
LIGHT AND HARDWARE.
3. ACOUSTICAL TREATMENTS
A. REMOVE EXISTING 2X4 SUSPENSION GRID SYSTEM.
B. REMOVE EXISTING 2X4 CEILING TILES.
C. PROVIDE AND INSTALL NEW 15/16" USG DONN XL/XLT SUSPENSION
GRID.
D. PROVIDE AND INSTALL NEW 2X2 X 3/4" CEILING TILE, USG #: XXXXX
(FAA TYP.).
E. FURR OUT EAST, SOUTH, AND WEST WALLS WITH 3 5/8" METAL
STUDS AT 16" O.C., 12'-0" TALL.
F. PROVIDE WALL TIES ATTACHING METAL STUDS TO CMU/BRICK
WALLS FOR SUPPORT.
G. PROVIDE WALL BRACING AT TOP OF WALL TO STRUCTURE ABOVE AT
48" O.C.
4. EXISTING FINSIHES
A. COVER AND PROTECT EXISTING FLOORING
B. PROPERLY SEAL ALL NEW WALLS, FLOORS & CEILING
PENETRATIONS WITH UL-LISTED FIRE-STOPPING MATERIALS
5. MECHANICAL
A. REMOVE AND REPLACE EXISTING AIR DEVICES (SUPPLY AND
RETURN). PROVIDE UP TO 10 LF OF FLEX DUCT TO CONNECT NEW
DEVICE TO EXISTING DUCTWORK.
B. PROVIDE PRE- AND POST-TAB REPORT ON DEVICES.
C. REMOVE STEAM PIPING BELOW CEILING TO CREATE UNIFORM
CEILING FINISH AFTER DEMOLITION.
6. ELECTRICAL
A. PROVIDE TEMPORARY LIGHTING DURING CONSTRUCTION.
B. REMOVE AND REPLACE LIGHT FIXTURES.
C. REMOVE AND REINSTALL WALL-MOUNTED FA DEVICES. INSTALL IN
CEILING OR WITHIN NEW WALLS AS REQUIRED.
D. EXTEND EXISTING WALL RECEPTACLES AT NEW WALL FURR-OUT
LOCATIONS.
E. EXTEND CARD READERS AT NEW WALL FURR-OUT LOCATIONS.
F. COORDINATION WITH BASE FIRE MARSHALL AND CONDUCT PRE-
AND POST-TEST FIRE ALARM SYSTEMS.
G. ACCESS CONTROL BY OWNER.
7. FIRE SUPPRESSION
A. REMOVE / PLUG EXISTING FIRE SUPPRESSION HEADS BEFORE
DEMOLITION.
B. REINSTALL / PROVIDE NEW LIKE-KIND FIRE SUPPRESSION HEADS
AND DROPS AT EXISTING LOCATIONS AFTER SUSPENSION GRID
SYSTEM INSTALLATION.
C. PROVIDE AND INSTALL NEW SEMI-RECESSED FIRE EXTINGUISHER
CABINET IN SOUTH WALL.
DEMOLITION SCOPE
1. REMOVE EXISTING DOUBLE DOOR & FRAME
2. REMOVE EXISTING ACT CEILING, MECH DIFFUSERS, LIGHTS & SPRINKLER
HEADS
3. REMOVE EXISTING ELECTRICAL BACK TO PANELBOARD
4. REMOVE EXISTING FIRE PROTECTION SYSTEM BAG & LABEL ALL FIRE
ALARM DEVICES. REINSTALL & RE-CERTIFY THE SYSTEM
5. REMOVE EXISTING FIRE EXTINGUISHER
6. EXISTING FLOOR TO REMAIN, PROTECT IN PLACE
A
B
2 543
FOYER
ABW/SC
CONFERENCE
ROOM
02.01
02.05
ACCESS CONTROL
BY OWNER
SALVAGE SIGN FOR
REINSTALLATION
DEMO ABANDONED
EQUIPMENT
A
B
2 543
FOYER
ABW/SC
CONFERENCE
ROOM
09.03
23.01
23.01
26.01
NEW EXIT LIGHT
NEW EMERGENCY LIGHT
11' - 0"
ADJUST SPRINKLER
HEAD LOCATION TO
WORK WITH NEW ACT
LAYOUT, TYP.
NEW RECESSED DUPLEX
W/ COVER PLATE, NEAR
CEILING
REMOVE AND REINSTALL
EXISTING STROBE AT NEW
WALL FURRING
A
B
2 543
FOYER
ABW/SC
CONFERENCE
ROOM
02.02
02.03
02.04
DEMO EMERGENCY LIGHT
DEMO PIPING ASSEMBLY
DEMO EMERGENCY LIGHT
11' - 0"11' - 0"
EXISTING NETBOX BY
OWNER, KEEP IN PLACE
EXISTING WIFI BY OWNER
DEMO WALL MOUNTED
EXISTING DUPLEX NEAR
CEILING
1/4" = 1'-0"C3
FIRST FLOOR PLAN
TINKER AFB, OK
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET OF
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
L A
R S
O N
D E
S
IG
N G
R O
U P
55 xx
N O T
F O
R
CONS TRUC
T I O
N
35% REVIEW
This document is preliminary in nature signed and sealed document.
and is not a final, Z R H D
P .C C E R T
IF
IC
A T E
O F
A U T H O R
IZ
A T
IO
N C A
E X P
IR
A T
IO
N
D A T E
JU
N E
3817 NW EXPRESSWAY
SUITE 840
OKLAHOMA CITY, OK 73112
(405) 722-7270
Larson Design Group xx
C U s e rs b h u n te r\ D o c u m e n ts F o y e r M o d
B 1G v2 b h u n te r4 A J L F .r v t
:3 :1
A M
-1
-2
P
R
IC
IN
G
U P
D A
T E
S
A-110
D E
M O
P L A
N S
F L O
O R
R
C P
P L A
N S
B G
D
O O
R
G
M L U
K S
IK
M S
H
IP
L E
R
B H
U N
T E
R
M A
R C
H
F O
Y E
R M
O D
E R
N
IZ
A T
IO
N
KEY NOTES
02.01 REMOVE EXISTING DOUBLE DOOR & FRAME
02.02 REMOVE EXISTING ACT CEILING
02.03 REMOVE EXISTING MECHANICAL DIFFUSERS
02.04 REMOVE EXISTING LIGHTS
02.05 REMOVE EXISTING FIRE EXTINGUISHER
08.01 NEW DOUBLE DOORS WITH COMMERCIAL HARDWARE
08.02 PAINT EXISTING SINGLE MAN DOORS
09.01 2-1/2" METAL STUD W/5/8" GWB (LEVEL 4 FINISH)TO 6" ABOVE CEILING
09.02 3-5/8" METAL STUD W/5/8" GWB (LEVEL 4 FINISH) TO STRUCT ABOVE
W/1-1/2" POLY ISO RIGID (R-7.6 MIN)
09.03 NEW 2'X2' ACT WITH DUNE 1774 TEGULAR EDGE MINERAL FIBER TILES.
CEILING @ 10'-0" AFF
10.01 NEW RECESSED FIRE EXT CABINET
23.01 NEW HVAC GRILLES & DIFFUSERS
26.01 NEW 4000K LED LIGHT FIXTURES
1/4" = 1'-0"A3
DEMOLITION - FIRST FLOOR PLAN
1/4" = 1'-0"C1
REFLECTED CEILING - FIRST FLOOR PLAN
1/4" = 1'-0"A1
DEMOLITION REFLECTED CEILING - FIRST FLOOR PLAN
(SEMI RECESSED)
11'-0" nick Strikethrough
AB
CONFE
RO
08.02 09.01
| Sheets |
| A-110 - DEMO PLANS, FLOOR & RCP PLANS |
File details come from the government source that posted it. Updated .