WWYK090020_Pre-Bid RFI Responses COR.pdf

PDF 73 KB Posted

Attached to
TINKER AFB MAC BOA WWYK090020 - Replace Multiple Roofs B1049 & B7038
Solicitation number
FA813725R0038
Issued by

About this file

This document is a Request for Information (RFI) for a federal contract opportunity at Tinker Air Force Base involving roof replacement and coating for Buildings 1049 and 7038. The project requires replacing a trapezoidal standing seam metal roof on Building 1049 using a mechanical seam panel system and applying a two-component silicone coating system on Building 7038's existing metal roof. Key technical questions include verifying existing roof deck substrate, determining moisture survey requirements, confirming lightning protection system status, and identifying the existing metal roof panel profile.

The solicitation is specifically for Tinker AFB MAC BOA Holders, with a site visit already conducted on 8 July 2025. RFI responses were due by 14 July 2025, and project proposals are scheduled to be submitted by 1 August 2025 at 2 PM CT. The project is a construction-only contract managed by the Department of the Air Force Materiel Command Air Force Sustainment Center, with a solicitation number of FA813725R0038 and an opportunity ID of 685eeb4f466c4851a6062b54.

View the file

Other files

File Type Posted
WWYK090020 - Initial Site Visit Sheet.pdf PDF
afman91-203_oc-alcsup.pdf PDF
20030059.pdf PDF
dafi13-213.pdf PDF
8_090020_SOW.pdf PDF
UMRL.pdf PDF
01 78 23.pdf PDF
ufc_3_601_02_2021.pdf PDF
01 33 00.pdf PDF
afman32-7003.pdf PDF
00 80 05.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
00 70 00.pdf PDF
tinkerafb_HWMP.pdf PDF
01 45 00.00 10.pdf PDF
EM_385-1-1.pdf PDF
10_090020_Drawings.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
01 78 00.pdf PDF
afi91-202_afmcsup.pdf PDF
afi48-104.pdf PDF
860072.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
dafi91-202.pdf PDF
007200_Attch13_AF487.pdf PDF
00 71 00.pdf PDF
01 33 16.00 10.pdf PDF
Wage Determinations.pdf PDF
017800_Attch1_DD1354.pdf PDF
910243W.pdf PDF
ufc_3_260_04_2018.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
tinkerafbi21-100.pdf PDF
00 72 00.pdf PDF
tinkerafb_INRMP.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
afman48-148.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
dafman91-203.pdf PDF
afman40-201.pdf PDF
01 32 16.00 20.pdf PDF
00 80 00.pdf PDF
9_090020_Submittal Register_final.pdf PDF
01 42 00.pdf PDF
WWYK090020 EAL List - BLANK.xlsx XLSX spreadsheet
007200_Attch9_EMS Awareness Training.pdf PDF
tinkerafbi13-204.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WWYK090020 - Replace Multiple Roofs B1049 & B7038 RFIs

1. Please confirm the existing roof deck substrate type on Building 1049. Is the existing deck metal, wood, or another material? This information is critical for determining the correct fastener type, spacing, and attachment method for the new standing seam roof system, and to assess whether any structural reinforcement or deck repairs will be necessary as part of the roof replacement.

Section 1.1 of the SOW states that “The Contractor shall perform a site investigation to verify existing conditions.” If the Contractor needs to perform further site investigation of the existing conditions, they can schedule a time to visit the location.

2. The SOW requires the existing metal panel roof on Building 7038 to be power-washed and cleaned prior to coating application, but it does not state whether a formal moisture survey (e.g., infrared thermography or core cuts) is required. Given that the existing roof is metal panel and not a moisture-absorbing membrane system, please confirm whether visual inspection and verification of dryness after surface prep is sufficient, or if a formal moisture survey is still required to validate suitability for coating application.

Provide infrared thermography or core cuts as required by the manufacturer to receive warranty. Contractor is to make sure that surface preparation is completed to manufacturer’s specifications and provide adequate documentation to the Government that these specifications have been followed.

3. The SOW specifies installation of a trapezoidal standing seam metal panel system on

B1049. Please confirm whether a mechanically seamed panel is required, or if a snaplock system is acceptable provided it meets all required performance standards, including FM 1-90 wind uplift and UL Class 90 ratings.

The government will require a mechanical seam panel system.

4. During the site visit, an LPS system was not identified. The SOW references submission of lightning protection shop drawings but does not indicate if any existing lightning protection systems were present or need to be reinstalled, replaced, or certified. Please confirm if either B1049 or B7038 currently has an existing lightning protection system and whether a new system is required, or if no work is necessary.

Section 1.1 of the SOW states that “The Contractor shall perform a site investigation to verify existing conditions.” If the Contractor needs to perform further site investigation of the existing conditions, they can schedule a time to visit the location.

5. Please confirm the type of existing metal roof panel profile on Building 7038 (e.g., R-panel, corrugated, trapezoidal standing seam, etc.). This information is necessary to ensure compatibility with the proposed two-component silicone coating system, including seam treatment, coating adhesion, and manufacturer warranty eligibility.

Section 1.1 of the SOW states that “The Contractor shall perform a site investigation to verify existing conditions.” If the Contractor needs to perform further site investigation of the existing conditions, they can schedule a time to visit the location.

2025-07-18T13:43:34-0500
MITCHELL.JEREMY.ELI.1625575903
2025-07-25T10:07:43-0500
HO.PETER.HAO.1123729591

File details come from the government source that posted it. Updated .