The document is a Submittal Register for a roofing replacement project at Tinker Air Force Base. The project involves replacing the trapezoidal standing seam roof on Building 1049 and installing a two-part roof coating system on Building 7038. The submittal register details 31 specific submittals required from the contractor, including preconstruction documents, test reports, certificates, product data, and closeout submittals.

Key submission requirements include a Health and Safety Plan, Storm Water Pollution Prevention Plan, Baseline Construction Schedule, Quality Control Plan, Working As-Built Drawings, Record Drawings, and Operation and Maintenance Data. Most submittals are classified as Government (G) reviewable, with specific timing requirements such as providing documents within 10 days of Notice to Proceed, weekly during construction, or 30 days prior to scheduled training. The project is part of a MAC BOA (Multiple Award Contract Blanket Purchase Agreement) specifically for Tinker AFB MAC BOA Holders, with the solicitation number FA813725R0038.

View the file

Other files

File Type Posted
WWYK090020_Pre-Bid RFI Responses COR.pdf PDF
WWYK090020 - Initial Site Visit Sheet.pdf PDF
Solicitation - FA813725R0038 for WWYK090020.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
dafi13-213.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
8_090020_SOW.pdf PDF
860072.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 32 16.00 20.pdf PDF
00 80 05.pdf PDF
00 80 00.pdf PDF
UMRL.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafbi13-204.pdf PDF
dafi91-202.pdf PDF
afman32-7003.pdf PDF
afman40-201.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
007200_Attch13_AF487.pdf PDF
20030059.pdf PDF
01 33 00.pdf PDF
01 42 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
dafman91-203.pdf PDF
dafi21-101.pdf PDF
ufc_3_601_02_2021.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
afman91-203_oc-alcsup.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
afi48-104.pdf PDF
WWYK090020 EAL List - BLANK.xlsx XLSX spreadsheet
910243W.pdf PDF
00 72 00.pdf PDF
00 70 00.pdf PDF
01 50 00.pdf PDF
01 33 16.00 10.pdf PDF
01 45 00.00 10.pdf PDF
tinkerafb_INRMP.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

1 00 70 00 01 Preconstruction Submittals Key Issue Receipt 1.3.12.1

2 00 70 00 06 Test Reports Pre-Construction Testing Record 1.3.11 G

3 00 70 00 07 Certificates Welding, Cutting and Brazing Permit 1.4 G

4 00 70 00 11 Closeout Submittals Key Return Receipt 1.3.12.1

5 00 71 00 01 Preconstruction Submittals Health and Safety Plan 1.3 G

6 00 71 00 01 Preconstruction Submittals Designated Waste and Disposal Areas 1.5 G

7 00 71 00 07 Closeout Submittals Safety Meetings 1.3

8 00 71 00 07 Preconstruction Submittals FOD Awareness and Prevention Training 1.4

9 00 72 00 01 Preconstruction Submittals Storm Water Pollution Prevention Plan 1.3.3.2 G

10 00 72 00 01 Preconstruction Submittals AF Form 3952 Chemical/Hazardous Material Request/Authorization 1.4 G

11 00 72 00 01 Preconstruction Submittals Spray Painting Plan 1.9 G

12 00 72 00 01 Preconstruction Submittals Environmental Management System Awareness Training 1.1

13 00 72 00 03 Product Data Affirmative Procurement Documentation or Green Statement 1.3.10 G Provide only one. Reference specification for additional information

14 00 72 00 07 Closeout Submittals Monthly Hazardous Material Usage Report 1.4 G Provide 1st week of each month during construction

15 00 72 00 08 Product Data Safety Data Sheets/Material Safety Data Sheets 1.4

16 00 72 00 11 Closeout Submittals Notice of Termination (ODEQ Form 640-572) 1.3.3.2 G

17 00 72 00 - Attch 5 07 Certificates Monthly Debris Management Report 2 G Provide 1st week of each month during construction

18 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G Provide within 10 days of NTP.

19 01 45 00.00 10 01 Preconstruction Submittals Quality Control (QC) Plan 3.2 G

20 01 45 00.00 10 06 Test Reports QC Documentation 3.9 Provide weekly with the Contract Progress Report

21 01 50 00 01 Preconstruction Submittals Request for Contractor Staging Area 1.1 G

22 01 50 00 01 Preconstruction Submittals Photographic Record 1.3

23 01 78 00 03 Product Data Warranty Letter 1.7.1

24 01 78 00 11 Closeout Submittals Working As-Built Drawings 3.1 G Provide (2) electronic sets (optical media) and

(2) hard copies

25 01 78 00 11 Closeout Submittals Record Drawings 3.3 G Provide (2) electronic sets (optical media) and

(1) hard copy

26 01 78 00 11 Closeout Submittals Certification of EPA Designated Items 2.3 G

27 01 78 00 11 Closeout Submittals Certification Of USDA Designated Items 2.4 G

28 01 78 23 10 Closeout Submittals Operation and Maintenance Data 1.2 G Provide 30 days prior to scheduled Training

29 SOW Preconstruction Submittals Trapezoidal standing seam roof system 4.2.1

30 SOW Preconstruction Submittals Silicone coating 4.2.2

31 SOW Closeout Submittals Roof Warranty 4.2.3

TITLE: Tinker AFB General Requirements Specification (Div 00-01)

SUBMITTAL REGISTER

JOB NAME: WWYK090020 - Replace Multiple Roofs

LOCATION: B1049 & B7038

CONTRACT NO:

CONTRACTOR:

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

Submittal Register_v3_03/07/22

Submittal Register_General Requ

File details come from the government source that posted it. Updated .