This document is a Section 00 80 00 Special Provisions document for working on Tinker Air Force Base (TAFB), detailing specific operational requirements for contractors. Key provisions include strict airfield operations protocols, requiring pre-coordination with the Contracting Officer and Chief, Airfield Management (CAM), mandatory flight line driver training for personnel operating vehicles in movement areas, and limitations on equipment height (12 feet maximum). Additional requirements cover traffic control, road closures, waste disposal, and a potential winter recess between December 1 and March 1, which can be negotiated as a no-cost contract modification. Contractors must provide their own traffic control measures, barricades, and warning devices, and ensure minimal disruption to airfield and road operations, with specific guidelines such as keeping at least two lanes open on four-lane roads and maintaining close coordination with Airfield Management.

View the file

Other files

File Type Posted
WWYK090020_Pre-Bid RFI Responses COR.pdf PDF
WWYK090020 - Initial Site Visit Sheet.pdf PDF
Solicitation - FA813725R0038 for WWYK090020.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
dafi13-213.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
8_090020_SOW.pdf PDF
860072.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 32 16.00 20.pdf PDF
00 80 05.pdf PDF
UMRL.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafbi13-204.pdf PDF
dafi91-202.pdf PDF
afman32-7003.pdf PDF
afman40-201.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
007200_Attch13_AF487.pdf PDF
9_090020_Submittal Register_final.pdf PDF
20030059.pdf PDF
01 33 00.pdf PDF
01 42 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
dafman91-203.pdf PDF
dafi21-101.pdf PDF
ufc_3_601_02_2021.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
afman91-203_oc-alcsup.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
afi48-104.pdf PDF
WWYK090020 EAL List - BLANK.xlsx XLSX spreadsheet
910243W.pdf PDF
00 72 00.pdf PDF
00 70 00.pdf PDF
01 50 00.pdf PDF
01 33 16.00 10.pdf PDF
01 45 00.00 10.pdf PDF
tinkerafb_INRMP.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

SECTION 00 80 00

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The most current edition of the listed publications at the time of contract/delivery order award shall be used.

TINKER AIR FORCE BASE (TAFB)

TAFBI 13-204 (2021) Airfield Operations

1.2 DEWATERING EXCAVATED AREA

It shall be the Contractor's responsibility to protect the construction area from damage due to rainwater. The Contractor shall provide and maintain at the job site sufficient pumps to remove rainwater from the excavated area as soon as practicable.

1.3 HAUL ROUTES

The haul routes to be used by the Contractor shall be as directed on the project drawings or by the Contracting Officer.

1.4 AIRFIELD OPERATIONS

All contractor activities on the airfield shall be pre-coordinated with the Contracting Officer in conjunction with the Chief, Airfield Management (CAM) prior to the Contractor proceeding on the airdrome. The provisions of TAFBI 13-204 and Section 00 80 05 SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD shall be strictly adhered to.

All runways, taxiways and aprons shall remain open during this project, unless specified otherwise by the Contracting Officer. The height of construction vehicles and equipment shall be limited to 12 feet above the surface. Absolutely no equipment or personnel will be allowed on the aircraft movement area or within 200 feet of the runways without permission from the Tinker Control Tower.

All Contractor personnel who will be operating their equipment or vehicles within the movement area or on any aircraft-parking ramp shall receive flight line driver training and have portable radios capable of communicating with Tinker Ground Control for projects over seven days.

The CAM may authorize certain contractors and other personnel to drive on the airdrome for short specified periods without completing the flight line driving training. However, Airfield Management will brief contractors and project engineers (or other supervisors responsible for the work being accomplished) and will provide flight line orientation for contractor vehicle operators prior to allowing them to drive on the airdrome.

January 2022 Page 1 Section 00 80 00

Tinker AFB Tinker General Requirements

Prior to commencing work on this project, the Contractor shall coordinate with the Contracting Officer for any airfield authorization passes that may be required.

Taxiing and towed aircraft shall have the right-of-way at all times.

Close coordination will be maintained between the Contractor's on-site foreman and the Airfield Manager.

1.5 TRAFFIC CONTROL AND BARRICADES

1.5.1 Automobile Movement Areas

Construction areas affecting automobile movement areas shall be protected by an adequate number of barricades with working flashing lights, warning devices, construction signs, flagmen and personnel. The barricades and warning devices shall be in accordance with the "Manual on Uniform Traffic Control Devices for Streets and Highways" developed by the U.S. Department of Transportation as an approved national standard. All costs associated with providing the traffic control and barricades shall be considered incidentals and shall be borne by the Contractor at no additional cost to the Government.

1.5.2 Road Closures

On two lane roads, only one lane may be blocked at a time. On four lane roads, at least two lanes shall be kept open at all times and three at rush hour.

1.6 WASTE AREA

Unless otherwise specified in these specifications, all waste materials removed shall become property of the Contractor and shall be taken off base for disposal. Disposal site location shall be the responsibility of the Contractor.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 WINTER RECESS

A winter recess, between December 1 and March 1, can be negotiated per Delivery Order between the Contracting Officer and the Contractor. It shall be a no cost modification to the contract moving the Delivery Order completion date the amount of the recess time.

-- End of Section --