00 80 05.pdf

PDF 10 KB Posted

Attached to
TINKER AFB MAC BOA WWYK090020 - Replace Multiple Roofs B1049 & B7038
Solicitation number
FA813725R0038
Issued by

About this file

This document is a Section 00 80 05 Special Provisions detailing requirements for contractors working on or near the airfield at Tinker Air Force Base. The provisions cover critical operational guidelines including runway and taxiway closure procedures, access restrictions, safety protocols, and emergency preparedness. Key requirements include submitting written closure requests 45 calendar days in advance, maintaining strict safety standards such as providing hearing protection, using approved vehicle lighting, obtaining clearance from the control tower for runway crossings, and maintaining complete cleanliness of work sites.

Specific contractor obligations include using two-way radios for communication, obtaining approval for any structures or equipment over 12 feet tall near runways, maintaining cleaning equipment on-site, and being prepared to immediately evacuate work areas during aircraft emergencies. Contractors must also ensure no materials or equipment are stockpiled within 1,000 feet of runway centerlines, use approved amber flashing lights on vehicles, and be prepared to remove all personnel and equipment from work sites at short notice when directed by base operations.

View the file

Other files

File Type Posted
WWYK090020_Pre-Bid RFI Responses COR.pdf PDF
WWYK090020 - Initial Site Visit Sheet.pdf PDF
910243W.pdf PDF
00 72 00.pdf PDF
00 70 00.pdf PDF
01 50 00.pdf PDF
01 33 16.00 10.pdf PDF
01 45 00.00 10.pdf PDF
tinkerafb_INRMP.pdf PDF
EM_385-1-1.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_260_04_2018.pdf PDF
tinkerafb_HWMP.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
tinkerafbi21-100.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch7a_AF3952.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
10_090020_Drawings.pdf PDF
Wage Determinations.pdf PDF
Solicitation - FA813725R0038 for WWYK090020.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
dafi13-213.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
8_090020_SOW.pdf PDF
20030059.pdf PDF
01 33 00.pdf PDF
01 42 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
dafman91-203.pdf PDF
dafi21-101.pdf PDF
ufc_3_601_02_2021.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
afman91-203_oc-alcsup.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
afi48-104.pdf PDF
WWYK090020 EAL List - BLANK.xlsx XLSX spreadsheet
860072.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

SECTION 00 80 05

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON TINKER AFB

PART 1 GENERAL

The following provisions shall apply when work is required to take place on the active airfield, within the clear zones, or in the primary surfaces as defined by Unified Facilities Criteria 3- 260-1, Airfield and Heliport Planning and Design.

1.1 CLOSURES

a. All runway and taxiway closures require coordination and scheduling with Base Operations. Written requests for closures shall be submitted to the Contracting Officer no less than 45 calendar days prior to the requested date of closure. The request shall include:

1. The nomenclature of the runway/taxiway to be closed

2. The area of the runway/taxiway where the work is to take place

3. The requested date of closure

4. The estimated duration of closure

5. A detailed description of the work to be performed

6. A list of the equipment required to perform the work

7. An estimate of the personnel required to perform the work

b. The Contracting Officer shall coordinate with Base Ops to close the requested runway/taxiway on or as close as possible to the date requested and for the length of time requested. The Contracting Officer shall notify the contractor, in writing, of the date and length of time approved for closure.

c. It is the responsibility of the contractor to have the necessary personnel, materials, and equipment ready to start work on the approved date of closure and to complete the work in the time requested. Under most circumstances, Base Operations will be unable to adjust flight and runway/taxiway utilization schedules to accommodate extensions to closures.

d. The contractor shall notify the Contracting Officer, in writing, when the work on the closed runway/taxiway is complete.

1.2 SAFETY

1.2.1 Personnel

The contractor shall provide all of his personnel ear plugs and/or ear muffs to prevent injury to their auditory systems while working on the Airfield. Jet aircraft operating on the runways, taxiways, and aprons make these areas zones of high-level noise. The government will not be held liable for auditory system damage due to non or improper use of noise protection equipment.

This requirement is in addition to the contractor providing his personnel with safety equipment required by OSHA for the work to be performed.

January 2022 Page 1 Section 00 80 05

1.2.2 Aircraft

The contractor shall maintain a clean work site and shall implement all measures necessary to insure that material and equipment do not interfere with or damage aircraft operating or parked in areas of the airfield that are not closed. NO FOD.

1.3 ACCESS RESTRICTIONS

No unescorted contractor vehicles, equipment, or personnel shall be on or cross any active runway or taxiway unless clearance is requested from, and granted by, the control tower. All contractor vehicles and mechanized equipment operating on the landing areas (the first 1,000 feet from either end of the runway) will be identified by approved, mounted, low intensity, amber flashing lights. When contractor operations require repeated vehicle or personnel crossing of an active runway, taxiway, or other controlled area, a two-way radio, furnished by the Government, will be used to maintain contact with the control tower. Use of the radio for other purposes will be strictly prohibited. The radio will be returned to the Government at the end of each workday, and will be reacquired as necessary.

1.4 HEIGHT RESTRICTIONS

The construction of any temporary structure or the use of any equipment that extends more than 12 feet above the ground within 1000 feet of a runway or that extends 50 feet above the ground elsewhere on Tinker AFB shall be approved by the Government prior to installation or use. Written request for approval shall be submitted to the Contracting Officer no later than 21 calendar days prior to the date needed.

1.5 CLEANLINESS

The contractor shall maintain the cleanliness of his work site and all traversed runways, taxiways, aprons, and ramps at all times. He shall utilize methods and equipment to prevent spilling or dropping materials in these areas and shall utilize whatever method or equipment necessary to insure the removal of loose materials from these areas. The contractor shall remove all material and equipment to his staging area at the end of each work day. No material is to be stockpiled nor equipment stored within 1000 feet of the centerline of a runway.

1.6 EMERGENCIES

1.6.1 Evacuation Area

On the first day of work on the airfield, the contractor, a representative of the Contracting Officer, and a representative of Base Ops shall identify an area a safe distance from the runway where the contractor is to move his personnel and equipment during an aircraft emergency.

1.6.2 Evacuation

During an aircraft emergency, the contractor shall vacate the work site.

He shall move all personnel and equipment to the designated evacuation area. Evacuation orders will be given on short notice and will require expeditious action by the contractor.

January 2022 Page 2 Section 00 80 05

1.7 INSPECTION AND CLEANING

The contractor shall maintain, on site and in good working order, equipment capable of cleaning loose materials from the runway, taxiway, ramp, or apron. The contractor, accompanied by a Government representative, may be required to inspect the entire length of the runway and taxiway to insure that all personnel, debris, material, equipment, and tools have been removed from these areas.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

January 2022 Page 3 Section 00 80 05

THIS PAGE INTENTIONALLY LEFT BLANK