The file's text, extracted by GovTribe without its formatting.
Appendix “A-5” Equipment Installation Requirements
Req Num
| Equipment Installation Requirement |
| Met |
| Not Met |
| 1. |
| Install four (4) new coils in East and West Cooling Towers. |
| 2. |
| Repair or replace all damaged components of the fan assembly module in the East Cooling Tower. This includes all blades, guards, shafts, motors, and structural steel that have been affected. |
| 3. |
| Replace all PVC drift eliminators in East and West Cooling Towers. |
| 4. |
| Repair control systems, including analyzing and correcting control programming to original or better specifications in East and West Cooling Towers. |
| 5. |
| Replace any assemblies, piping, or cooling tower casing that has been removed in East and West Cooling Towers. |
| 6. |
| Install four (4) vacuum breakers. Vacuum breaker ports are already in place in East and West Cooling Towers. Coordinate with PMXG on location and size. |
| 7. |
| Re-Install any assemblies, casing, associated piping, electrical controls, and programming necessary in East and West Cooling Towers to perform the tasks specified in this Performance Work Statement. |
| 8. |
| Return cooling towers to “like new” operating conditions in East and West Cooling Towers. |