Appendix A-5 Cooling Tower.docx

DOCX document 17 KB Posted

Attached to
Cooling Towers Repair Federal contract opportunity
Solicitation number
FA8125-11-Q-0063
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Appendix A-5 (Equipment Installation Req)

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Towers Repair, newest first.
File Type Posted
Wage Determination 3 Nov 10.pdf PDF
Combined Solicitation.doc DOC document
Appendix A-4 Cooling Tower.docx DOCX document
Appendix A-3 Cooling Tower.docx DOCX document
Appendix A-2 Cooling Tower.docx DOCX document
APPENDIX C 11-87 Cooling Tower.docx DOCX document
Appendix A Cooling Tower.docx DOCX document
Appendix B.pdf PDF
Appendix A-1 Cooling Tower.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix “A-5” Equipment Installation Requirements

Req Num

Equipment Installation Requirement
Met
Not Met
1.
Install four (4) new coils in East and West Cooling Towers.
2.
Repair or replace all damaged components of the fan assembly module in the East Cooling Tower. This includes all blades, guards, shafts, motors, and structural steel that have been affected.
3.
Replace all PVC drift eliminators in East and West Cooling Towers.
4.
Repair control systems, including analyzing and correcting control programming to original or better specifications in East and West Cooling Towers.
5.
Replace any assemblies, piping, or cooling tower casing that has been removed in East and West Cooling Towers.
6.
Install four (4) vacuum breakers. Vacuum breaker ports are already in place in East and West Cooling Towers. Coordinate with PMXG on location and size.
7.
Re-Install any assemblies, casing, associated piping, electrical controls, and programming necessary in East and West Cooling Towers to perform the tasks specified in this Performance Work Statement.
8.
Return cooling towers to “like new” operating conditions in East and West Cooling Towers.