Appendix A-3 Cooling Tower.docx

DOCX document 17 KB Posted

Attached to
Cooling Towers Repair
Solicitation number
FA8125-11-Q-0063
Issued by

About this file

Appendix A-3 (Vacuum Breaker and Pressure Vent Specification Req)

View the file

Other files

File Type Posted
Appendix A-4 Cooling Tower.docx DOCX document
APPENDIX C 11-87 Cooling Tower.docx DOCX document
Appendix A-5 Cooling Tower.docx DOCX document
Appendix A Cooling Tower.docx DOCX document
Wage Determination 3 Nov 10.pdf PDF
Combined Solicitation.doc DOC document
Appendix A-2 Cooling Tower.docx DOCX document
Appendix B.pdf PDF
Appendix A-1 Cooling Tower.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix “A-3” Vacuum Breaker and Pressure Vent Specification Requirements

Req Num

Control Programming Specification Requirement
Met
Not Met
1.
Vacuum Breakers and Pressure Vents shall be installed in the East and West Cooling Towers.
2.
Vacuum breakers and pressure vents shall be installed at four (4) locations on the piping system. These locations shall be identified by the government Subject Matter Expert (SME).
3.
Vacuum breakers and pressure vents shall operate in all ambient weather conditions, and shall be of a temperature, weather, and corrosion resistant design.

File details come from the government source that posted it. Updated .