Appendix A-3 Cooling Tower.docx
DOCX document 17 KB Posted
- Attached to
- Cooling Towers Repair Federal contract opportunity
- Solicitation number
- FA8125-11-Q-0063
About this file
Appendix A-3 (Vacuum Breaker and Pressure Vent Specification Req)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Solicitation.doc | DOC document | |
| Appendix A-4 Cooling Tower.docx | DOCX document | |
| Appendix A-2 Cooling Tower.docx | DOCX document | |
| APPENDIX C 11-87 Cooling Tower.docx | DOCX document | |
| Appendix A Cooling Tower.docx | DOCX document | |
| Appendix B.pdf | ||
| Appendix A-1 Cooling Tower.docx | DOCX document | |
| Appendix A-5 Cooling Tower.docx | DOCX document | |
| Wage Determination 3 Nov 10.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix “A-3” Vacuum Breaker and Pressure Vent Specification Requirements
Req Num
| Control Programming Specification Requirement |
| Met |
| Not Met |
| 1. |
| Vacuum Breakers and Pressure Vents shall be installed in the East and West Cooling Towers. |
| 2. |
| Vacuum breakers and pressure vents shall be installed at four (4) locations on the piping system. These locations shall be identified by the government Subject Matter Expert (SME). |
| 3. |
| Vacuum breakers and pressure vents shall operate in all ambient weather conditions, and shall be of a temperature, weather, and corrosion resistant design. |