Appendix A-4 Cooling Tower.docx
DOCX document 17 KB Posted
- Attached to
- Cooling Towers Repair Federal contract opportunity
- Solicitation number
- FA8125-11-Q-0063
About this file
Appendix A-4 (Equipment Removal Req)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination 3 Nov 10.pdf | ||
| Combined Solicitation.doc | DOC document | |
| Appendix A-3 Cooling Tower.docx | DOCX document | |
| Appendix A-2 Cooling Tower.docx | DOCX document | |
| APPENDIX C 11-87 Cooling Tower.docx | DOCX document | |
| Appendix A Cooling Tower.docx | DOCX document | |
| Appendix B.pdf | ||
| Appendix A-1 Cooling Tower.docx | DOCX document | |
| Appendix A-5 Cooling Tower.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix “A-4” Equipment Removal Requirements
Req Num
| Equipment Removal Requirement |
| Met |
| Not Met |
| 1. |
| Disconnect, remove, and dispose of 4 each existing cooling tower coils in East and West Cooling Towers. |
| 2. |
| Disconnect, remove, and dispose of all existing PVC drift eliminators in East and West Cooling Towers. |
| 3. |
| Disconnect, remove, and dispose of the existing fan assembly module on the east tower. Existing fan motor shall be given to PMXG for analysis. |
| 4. |
| Remove any associated piping, electrical controls, and programming necessary to perform the tasks specified in this Performance Work Statement in East and West Cooling Towers. |