Appendix A-4 Cooling Tower.docx

DOCX document 17 KB Posted

Attached to
Cooling Towers Repair Federal contract opportunity
Solicitation number
FA8125-11-Q-0063
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Appendix A-4 (Equipment Removal Req)

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Towers Repair, newest first.
File Type Posted
Wage Determination 3 Nov 10.pdf PDF
Combined Solicitation.doc DOC document
Appendix A-3 Cooling Tower.docx DOCX document
Appendix A-2 Cooling Tower.docx DOCX document
APPENDIX C 11-87 Cooling Tower.docx DOCX document
Appendix A Cooling Tower.docx DOCX document
Appendix B.pdf PDF
Appendix A-1 Cooling Tower.docx DOCX document
Appendix A-5 Cooling Tower.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix “A-4” Equipment Removal Requirements

Req Num

Equipment Removal Requirement
Met
Not Met
1.
Disconnect, remove, and dispose of 4 each existing cooling tower coils in East and West Cooling Towers.
2.
Disconnect, remove, and dispose of all existing PVC drift eliminators in East and West Cooling Towers.
3.
Disconnect, remove, and dispose of the existing fan assembly module on the east tower. Existing fan motor shall be given to PMXG for analysis.
4.
Remove any associated piping, electrical controls, and programming necessary to perform the tasks specified in this Performance Work Statement in East and West Cooling Towers.