Appendix “A-1” Equipment Technical Requirements
Req Num
| Equipment Technical Requirement |
| Met |
| Not Met |
| 1. |
| Coils to be replaced in East and West Cooling Towers are for a Baltimore Aircoil Company (BAC) model FXV-364-31R dual air inlet cooling tower. The 4 each replacement coils shall provide the same or better volumetric flow rate and cooling capability (tonnage) as the coils that are being replaced. |
| 2. |
| The coil assembly shall be dimensioned properly for the existing cooling tower cabinet. This assembly should fit within the cooling tower cabinet so that the spray nozzle assembly can be reinstalled. |
| 3. |
| Coil shall be a standard serpentine coil constructed of continuous lengths of prime surface steel, hot-dip galvanized after fabrication with sloping tubes to assist drainage of fluids. |
| 4. |
| When work is finished, each fluid cooler shall provide its original capacity of 1460 GPM of water from 93°F to 83°F at 76.82°F wet bulb temperature, or better. |
| 5. |
| Modifications to the control system shall be coordinated with PMXG and shall not reduce the cooling efficiency of the fluid coolers. |
| 6. |
| PVC drift eliminators shall meet the specifications of Baltimore Aircoil Company FXV Construction Details in Appendix A. |
| 7. |
| The Fan Assembly shall be replaced in the East Tower Only. |
| 8. |
| Fan assembly module and associated parts shall meet the specifications of Baltimore Aircoil Company FXV Construction Details in Appendix A. |
| 9. |
| Fan assembly shall consist of at least one (1) 60HP fan motor; totally-enclosed, air-over (TEAO), inverter duty, suitable for 460 volts, 3-phase, 60 Hz electrical service. |
| 10. |
| Fan shall be of a belt driven design with blades made of non-corrosive cast aluminum. |