FA810526FB0010005 - Conformed.pdf
PDF 22 MB Posted
- Attached to
- KC-135 Center Console Refresh (CCR) Revision 2
- Solicitation number
- FA8105_CCR_Rev2
About this file
This is a conformed solicitation document incorporating Amendments 01 through 04 for the KC-135 Center Console Refresh (CCR) program. The U.S. Air Force Materiel Command at Tinker Air Force Base seeks innovative solutions to address critical obsolescence issues in the KC-135 Refueling Tanker aircraft by replacing and improving the Fuel System (FS), Flight Display System (FDS), Flight Computer, and adding autothrottle systems. The contract vehicle is a single-award indefinite delivery/quantity type contract structured as Cost-Plus Incentive Fee (CPIF) for Engineering and Manufacturing Development (EMD) and Firm Fixed Price (FFP) for Production and Deployment (P&D). The performance period extends from July 2028 to June 2038, comprising one 48-month base period and six optional 1-year periods.
Proposals were due on November 9, 2026, at 12:00 p.m. CDT, following Amendment 05 issued on October 1, 2026, which revised paragraphs 13.5 and 13.14 of the Statement of Work, added Clause H005, and removed RFO clause 52.246-17. Access to controlled solicitation documents on SAM.gov requires companies to have assigned roles in SAM.gov, an active DD2345 on file through the JCP website, and a valid CAGE code. The program scope encompasses turn-key solutions with emphasis on supportability and future growth adaptability, with the conformed version incorporating all amendments made available as of September 17, 2026.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .