ATTACHMENT3IPBDataCleansingProcessFlow.docx

DOCX document 160 KB Posted

Attached to
Product Lifecycle Management (PLM) and Data Competency Center (DCC) Data Objects Cleansing Logistics Transformation
Solicitation number
FA8100-11-R-0010
Issued by

About this file

Draft Attachment 3 to PWS. Please inform Chris Jones if any of the attachments are not working properly.

View the file

Other files

File Type Posted
POST AWARD SYNOPSIS.doc DOC document
FA810011R0010_______0001.pdf PDF
PWSrevision1.docx DOCX document
AppendixB.docx DOCX document
ATTACHMENT8BusinessRules.docx DOCX document
ATTACHMENT9CustomerComplaintRecord.docx DOCX document
ATTACHMENT5AcceptanceGroupCategories.docx DOCX document
ATTACHMENT7PCMSHeavyCleanupToolUserManual.docx DOCX document
ATTACHMENT1CDRLs.docx DOCX document
dd0254FY11IPBCleansing.pdf PDF
PWSIPBCleansingFY11.docx DOCX document
EvaluationCriteria2011.docx DOCX document
ATTACHMENT4ListofCommoditiesWepaonSystemIPBs.docx DOCX document
ATTACHMENT6IPBStandardCommonErrorCodes.docx DOCX document
Instructiontoofferors2011.docx DOCX document
ExhibitA.pdf PDF
WageDetermination.pdf PDF
FA810011R0010.pdf PDF
ATTACHMENT3IPBDataCleansingProcessFlow.docx DOCX document
ATTACHMENT2ExpectedHeavyCleansingErrorsinMilspecTechnicalOrders.docx DOCX document
DraftRFP QA's.doc DOC document
ExhibitA.pdf PDF
ATTACHMENT2ExpectedHeavyCleansingErrorsinMilspecTechnicalOrders.docx DOCX document
ATTACHMENT6IPBStandardCommonErrorCodes.docx DOCX document
ATTACHMENT9CustomerComplaintRecord.docx DOCX document
WageDetermination.pdf PDF
ATTACHMENT4ListofCommoditiesWepaonSystemIPBs.docx DOCX document
Instructiontoofferors2011.docx DOCX document
QASP.docx DOCX document
FA810011R0010.pdf PDF
ATTACHMENT7PCMSHeavyCleanupToolUserManual.docx DOCX document
ATTACHMENT1CDRLs.docx DOCX document
ATTACHMENT5AcceptanceGroupCategories.docx DOCX document
PWSIPBCleansingFY11.docx DOCX document
dd0254 FY11 IPB Cleansing.pdf PDF
ATTACHMENT8BusinessRules.docx DOCX document
EvaluationCriteria2011.docx DOCX document
PWS QA's.doc DOC document
PWS IPB Cleansing FY11 r14.docx DOCX document
Synopsis.docx DOCX document
Q A's.doc DOC document
RFI LETTER.doc DOC document
RFI Requirement Document final.docx DOCX document
USAF Questions r4 final.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

IPB Data Cleansing Process Flow image1.emf

PLM IPB Cleansing Process.pptx PLM IPB Cleansing Process Overview

PLM/S System

Other

Product Data

Cleansed

T.O Data

Reload PCMS

Central Data Repository

Migration

Create IPB Tracking Project

Capture / Prep IPB Data

Perform Initial Review

Acquire TO / IPB Data

Create Electronic TO Folder

Conduct Core Validation Process

Create TO / IPB Library Binder

Input IPB Data into Tracking Tool

1.0

3.0

4.0

5.0

7.0

6.0

8.0

Final Validation Process (ES/ENG)

Generate AFTO 22 & 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

2.0

Routed thru normal AF Process

Tech Orders

(DCO)

Cleansing Tool Files

(WR-ALC/PCMS)

Front End Process Review

Cleansed

T.O Data

Reload PCMS

Central Data Repository

Create IPB Project

Perform Initial Review

Acquire TO / IPB Data

Establish Files / Folders

Conduct Core Validation Process

Create TO / IPB Library Binder

Input IPB Data into Tracking Tool

1.0

3.0

4.0

5.0

7.0

6.0

8.0

Final Validation Process (ES/ENG)

Generate AFTO 22 & 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

2.0

Routed thru normal AF Process

Tech Orders

(TCO)

DART Files

(WR-ALC)

Create IPB Project

Perform Initial Review

Acquire TO / IPB Data

Establish Files / Folders

Conduct Core Validation Process

Create TO / IPB Binder

Input IPB Data into DOTMan

Cruise Missile Data Cleansing Pilot

IPB Front End Process Step 1

1.0

3.0

4.0

5.0

7.0

6.0

8.0

2.0

1.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

Routed thru normal AF Process

Central Data Repository

Migration

Create IPB Data Cleansing Project

- Identify Weapon System T.O.s to be worked

- Establish functional contacts

- Define location of project team

- Determine security level of tech data

- Identify system access requirements and the request process

- Indoctrinate team and define business rules, processes and tools to be used

- Define initial work assignments

Cleansed

T.O Data

Perform Initial Review

Acquire TO / IPB Data

Establish Files / Folders

Cruise Missile Data Cleansing Pilot

IPB Front End Process Step 2

1.0

3.0

4.0

5.0

7.0

6.0

8.0

2.0

Capture / Prep IPB Data

Conduct Core Validation Process

Create TO / IPB Binder

Input IPB Data into DOTMan

1.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Central Data Repository

Establish Files/ Folders

- Define standard naming conventions for files/folders

- Set up initial files

- Establish library

- Create project binder template

- Prepare metric collection

- Establish electronic files

- Define IDE(s) to be used

- Define user access levels and create access matrix

- Establish data flow

Cleansed

T.O Data

Acquire TO / IPB Data

Establish Files / Folders

IPB Front End Process Step 3

1.0

3.0

4.0

5.0

7.0

6.0

8.0

2.0

Conduct Core Validation Process

Create TO / IPB Binder

Input IPB Data into DOTMan

1.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Central Data Repository

Migration

Acquire TO IPB / IPB Data

Gather Electronic / Hard Copy Tech Order Data

- TO PDF

- TO SGML

- DART Spreadsheet

- IETMS Data

- GLSC IPB Data

- ATOMS

- Other

Cleansed

IPB Front End Process Step 4

1.0

3.0

4.0

5.0

7.0

6.0

Conduct Core Validation Process

Create TO / IPB Binder

Input IPB Data into DOTMan

1.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Central Data Repository

Migration

Perform Initial Review for Health & Complexity

- Review for familiarity

- Complexity Factor Input

- Distribution Level

Number of Pages

Number of Figs

Number of Fig Pages

Number of Fig Index Pages

Estimate number of Part Records

Type of TO : Dash 3, dash 4, T.O. w/o IPB

Type of Maintenance: Depot , Intermediate, Field

Type of Manual: Overhaul, Repair etc.

Style of TO: Old Format or New

Determine if Multiple Configurations exist

Simple review for missing data

Simple review for Indenture Logic

Simple review for Incorrect Data

Cleansed

T.O Data

Perform Initial Review

IPB Core Validation Process

Create TO / IPB Binder

Input IPB Data into Tracking Tool

Cruise Missile Data Cleansing Pilot

IPB Front End Process Step 5

1.0

3.0

4.0

5.0

7.0

6.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

Routed thru normal AF Process

Capture / Prep Electronic Data

- Gather Hard Copy Tech Order Data into TO Folder

- Capture separate PDF Copy of TO Title Page

- Capture separate PDF of TO Front Matter

- Capture separate PDF of IPB Fig Pages

- Capture separate PDF of IPB Index Pages

- Capture prep DART spreadsheet

Central Data Repository

Migration

Cleansed

T.O Data

Perform Initial Review

Input IPB Data into Tracking Tool

IPB Front End Process Step 6

1.0

3.0

4.0

5.0

7.0

6.0

8.0

2.0

Final Validation Process (ES/ENG)

Generate 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

Routed thru normal AF Process

Input IPB Data into Tracking System

Use Front Matter Input Form in IPB Tracking System

- Validate Correct TO #

TO Title

TO Part Number

TO Part Number Cage Code

TO POC OFFICE

TO Publication Date

TO Revision Date

TO Revision Number

Distribution Level

Special Handling Codes: i.e. NWRM

Input Comments

Central Data Repository

Migration

Cleansed

T.O Data

Perform Initial Review

Input IPB Data into DOTMan

Cruise Missile Data Cleansing Pilot

IPB Front End Process Step 7

1.0

3.0

4.0

5.0

7.0

6.0

9.0

11.0

10.0

Released to Data Content Owner

Routed thru normal AF Process

Create TO / IPB Binder

Validate Correct TO with assignment

Prepare Assignment Form

Prepare Tracking Form

Prepare Binder and Tabs

Prepare Index

Prepare Quality Checklist

Printout Front Matter

Printout IPB’s, Part Index’s

Printout existing Spreadsheets

Prepare Binder Identification Pages

Central Data Repository

Migration

Cleansed

T.O Data

Perform Initial Review

Input IPB Data into DOTMan

IPB Back End Process Step 8

1.0

3.0

4.0

5.0

7.0

6.0

9.0

11.0

10.0

Central Data Repository

Migration

Create TO / IPB Binder

IPB Core Validation Process

IPB Core Validation Process

Perform Core Indenture Validation

IPB Front Matter Review

IPB Front Matter Special Notes

JEDMICS Drawing Capture

JEDMICS Parts List Capture

Dart / IPB / JEDMICS Validation Checks

Compare IPB Index Parts List to IPB Fig

Compare JEDMICS Drawing to JEDMICS Parts

Compare IPB Index to JEDMICS Parts List

Tag Top Level and Sub Assemblies

UOC Tagging

Validate Tagged Indenture

Indenture Error Report

Weekly Meeting with E.S.’s

Back End Process Overview

Central Data Repository

Migration

Create IPB Project

Capture / Prep IPB Data

Perform Initial Review

Acquire TO / IPB Data

Establish Files / Folders

Conduct Core Validation Process

Create TO / IPB Library Binder

Input IPB Data into Tracking Tool

1.0

3.0

4.0

5.0

7.0

6.0

8.0

Final Validation Process (ES/ENG)

Generate AFTO 22 & 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner

2.0

Routed thru normal AF Process

Tech Orders

(TCO)

DART Files

(WR-ALC)

Cleansed

T.O Data

Perform Initial Review

IPB Back End Process Step 9

1.0

3.0

4.0

5.0

7.0

6.0

Generate AFTO 22 & 252 TO Change Package

9.0

11.0

10.0

Central Data Repository

Migration

Create TO / IPB Binder

IPB Core Validation Process

Final Validation Process (E.S. / ENG)

Review / Acceptance by E.S.

Parts Indenture Validation

Validated Parts Acceptance - Group I

Validation of High Confidence Parts - Group II

Validation / Acceptance of Errors with Change - Group III

Input by ES required / Validation of Errors without Recommendation - Group IV

Perform Initial Review

IPB Back End Process Step 10

1.0

3.0

4.0

5.0

7.0

6.0

Generate AFTO 22 & 252 Change Package

9.0

11.0

10.0

Central Data Repository

Migration

Create TO / IPB Binder

IPB Core Validation Process

Generate AFTO 22 & 252 Change Package

Electronically produced AFTO 22 & 252 and AF Forms 3925 &3927 top page

Attached recommended changes list

Perform Initial Review

IPB Back End Process Step 11

1.0

3.0

4.0

5.0

7.0

6.0

Generate AFT 22 & 252 TO Change Package

9.0

11.0

10.0

Released to Data Content Owner (E.S. & Engineer)

Central Data Repository

Create TO / IPB Binder

IPB Core Validation Process

Cleansed

T.O Data

Reload PCMS image1.png

File details come from the government source that posted it. Updated .