FA8051-16-R-0001_RFP_Amendment_01.pdf
PDF 92 KB Posted
- Solicitation number
- FA8051-16-R-0001
About this file
RFP FA8051-16-R-0001 Amendment 01 4 Feb 2016
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A M EN D M EN T O F S O L IC ITA TIO N /M O D IFIC A TIO N O F C O N TR A C T
Excep t as p rov ided herein , all t erm s and cond it ions o f t he docum en t referenced in It em 9A o r 10A , as heret o fo re changed , rem ains unchanged and in fu ll fo rce and effect .
15A . N A M E A N D T IT LE O F SIGN ER (T y p e o r p rin t )
30-105-04EX CEPT IO N T O SF 30
A PPRO VED BY O IRM 11-84
ST A N D A RD FO RM 30 (Re v . 10-83)
Pre s c rib e d b y GSA
FA R (48 CFR) 53.243
The reas on for th is am endm ent is to m ak e the fo llow ing adm in is t rt ive c hanges to s o lic ita t ion F A 8051-16-R -0001.
1 . R ep lac e R F P A t tac hm ent 2 , S O W dated 13 O c t 2015 w ith S O W R evis ion 01, dated 27 Jan 2016. C hange m ade to P aragraph 2 .2 .1 . , A c c eptab le M ethods , and P aragraph 3 .1 . , D es c rip t ion (A irfie ld M ark ing and S trip ing).
2 . R ep lac e A t tac hm ent 3 , P ric ing W ork s heets , w ith revis ed A t tac hm ent 3 . D e le ted a ll C LIN s w ith a z ero quant ity .
3 . R es truc ture C LIN s on S F 1442, S ec t ion B to m atc h revis ed A t tac hm ent 3 , P ric ing W ork s heets .
4 . R ep lac e A t tac hm ents 4-6 , C ontrac tor Team O rgan iz at ion , P as t P erform anc e Q ues t ionna ire , and S ubc ontrac tor C ons ent m em o, w ith updtaed
A t tac hm ents 4-6 , R evis ion 01, dated 25 Jan 2016.
5 . C hange S ec t ion L , P aragraph 2 .2 .7 to : E ac h V o lum e of the propos a l s ha ll be tabbed in a th ree-ring , loos e lea f b inder. M ult ip le V o lum es m ay be ins erted in to a b inder, but s ha ll be properly tabbed to ident ify the appropria te V o lum e.
6. C hange S ec t ion M , 1s t s entenc e, las t paragraph on page 10.
1 . C O N T R A C T ID C O D E P A G E O F P A G ES
J 1 25
16A . N A M E A N D T IT LE O F CO N T RA CT IN G O FFICER (T y p e o r p rin t )
16C. D A T E SIGN ED
BY
16B. U N IT ED ST A T ES O F A M ERICA15C. D A T E SIGN ED15B. CO N T RA CT O R/O FFERO R
(Sig n a tu re o f Co n tra c t in g O ffic e r)(S ig n a tu re o f p e rs o n a u th o rize d to s ig n )
8. N A M E A N D A D D RESS O F CO N T RA CT O R (N o ., S t re e t , Co u n ty , S ta te a n d Z ip Co d e ) X F A 8051-16-R -0001
X 9B. D A T ED (SEE IT EM 11)
14-Jan-2016
10B. D A T ED (SEE IT EM 13)
9A . A M EN D M EN T O F SO LICIT A T IO N N O .
11. T H IS IT EM O N LY A PPLIES T O A M EN D M EN T S O F SO LICIT A T IO N S
X T he above num bered s o licit at ion is am ended as s et fo rt h in It em 14 . T he hou r and dat e s p ecified fo r receip t o f O ffer is ext ended , X is no t ext ended .
O ffer m us t acknow ledge receip t o f t h is am endm en t p rio r t o t he hou r and dat e s p ecified in t he s o licit at ion o r as am ended by one o f t he fo llow ing m et hods :
(a) B y com p let ing It em s 8 and 15 , and ret u rn ing 1 cop ies o f t he am endm en t ; (b ) B y acknow ledging receip t o f t h is am endm en t on each cop y o f t he o ffer s ubm it t ed ;
o r (c) B y s ep arat e let t er o r t elegram w h ich includes a reference t o t he s o licit at ion and am endm en t num bers . F A ILU R E O F YO U R A C K N O W LED G M EN T T O B E
R EC EIVED A T T H E P LA C E D ESIG N A T ED F O R T H E R EC EIP T O F O F F ER S P R IO R T O T H E H O U R A N D D A T E SP EC IF IED M A Y R ESU LT IN
R EJ EC T IO N O F YO U R O F F ER . If by v irt ue o f t h is am endm en t y ou des ire t o change an o ffer already s ubm it t ed , s uch change m ay be m ade by t elegram o r let t er, p rov ided each t elegram o r let t er m akes reference t o t he s o licit at ion and t h is am endm en t , and is received p rio r t o t he op en ing hou r and dat e s p ecified .
12. A CCO U N T IN G A N D A PPRO PRIA T IO N D A T A (If re q u ire d )
13. T H IS IT EM A PPLIES O N LY T O M O D IFICA T IO N S O F CO N T RA CT S/O RD ERS.
IT M O D IFIES T H E CO N T RA CT /O RD ER N O . A S D ESCRIBED IN IT EM 14.
A . T H IS CH A N GE O RD ER IS ISSU ED PU RSU A N T T O : (Sp e c ify a u th o rity ) T H E CH A N GES SET FO RT H IN IT EM 14 A RE M A D E IN T H E
CO N T RA CT O RD ER N O . IN IT EM 10A .
B. T H E A BO VE N U M BERED CO N T RA CT /O RD ER IS M O D IFIED T O REFLECT T H E A D M IN IST RA T IVE CH A N GES (s u c h a s c h a n g e s in p a y in g o ffic e , a p p ro p ria t io n d a te , e tc .) SET FO RT H IN IT EM 14, PU RSU A N T T O T H E A U T H O RIT Y O F FA R 43.103(B).
C. T H IS SU PPLEM EN T A L A GREEM EN T IS EN T ERED IN T O PU RSU A N T T O A U T H O RIT Y O F:
D . O T H ER (Sp e c ify ty p e o f mo d ific a t io n a n d a u th o rity )
E. IM PO RT A N T : Co n tra c to r is n o t , is re q u ire d to s ig n th is d o c u me n t a n d re tu rn c o p ie s to th e is s u in g o ffic e .
14. D ESCRIPT IO N O F A M EN D M EN T /M O D IFICA T IO N (O rg a n ize d b y U CF s e c t io n h e a d in g s , in c lu d in g s o lic ita t io n /c o n tra c t s u b je c t ma t te r w h e re fe a s ib le .)
10A . M O D . O F CO N T RA CT /O RD ER N O .
U 0001
2 . A M EN D M EN T /M O D IF IC A T IO N N O . 5 . P R O J EC T N O .(If ap p licab le)
6 . ISSU ED B Y
3 . EF F EC T IVE D A T E
28-Jan-2016
C O D E
A F IC A 7 7 2 E S S /P K D A N T H O N Y D R O G IA N O II I
C /O H Q A F IC A / 7 7 2 E S S /P K D
1 3 9 B A R N E S D R IV E , S T E 1
T Y N D A L L A FB FL 3 2 4 0 3 -5 3 1 9
F A 8051 7 . A D M IN IST ER ED B Y (If o t her t han it em 6 )
4 . R EQ U ISIT IO N /P U R C H A SE R EQ . N O .
C O D E
S ee Item 6
FA CILIT Y CO D ECO D E
E M A IL :T E L :
4 Feb 2016
FA8051-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The pricing detail quantity has decreased by 500.00 from 1,000.00 to 500.00.
CLIN 0002
The pricing detail quantity has decreased by 2,500.00 from 5,000.00 to 2,500.00.
CLIN 0003
The pricing detail quantity has decreased by 7,500.00 from 15,000.00 to 7,500.00.
The cost constraint EST has been added.
CLIN 0004
CLIN 0005
CLIN 0006
The pricing detail quantity has decreased by 90,000.00 from 150,000.00 to 60,000.00.
CLIN 0007
The CLIN description has changed from Airfld Rubber Removal Water < 50K SF to
Airfld Rubber Removal Water > 200K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting under 50,000 Square Feet. Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
The pricing detail quantity has increased by 350,000.00 from 50,000.00 to 400,000.00.
CLIN 0008
The CLIN description has changed from Airfld Rubber Removal Water 50K-200K SF to Remove Pave. Markings Water < 1K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting between 50,000 and 200,000 Square
Feet. Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the
Specifications. Work consist of Removal of Pavement Markings with Water Blast under 1,000
Square Feet. Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
The pricing detail quantity has decreased by 199,500.00 from 200,000.00 to 500.00.
CLIN 0009
The CLIN description has changed from Airfld Rubber Removal Water > 200K SF to
Remove Pave. Markings Water 1K-5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of Removal of Pavement Markings with Water Blast 1,000 and 5,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
The pricing detail quantity has decreased by 1,997,500.00 from 2,000,000.00 to
2,500.00.
CLIN 0010
The CLIN description has changed from Airfld Rubber Removal Deterg. < 50K SF to
Remove Pave. Markings Water > 5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent less than 50,000 Square Feet. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of Pavement Markings with Water Blast over 5,000 Square Feet. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
The pricing detail quantity has decreased by 40,000.00 from 50,000.00 to 10,000.00.
CLIN 0011
The CLIN description has changed from Airfld Rubber Removal Deterg 50K-200K SF to Surface Paint Signs Non-Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent between 50,000 to 200,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of completion of Surface Painted Signs (Multi-Color) Non-Relective. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located
The pricing detail quantity has decreased by 195,000.00 from 200,000.00 to 5,000.00.
CLIN 0012
The CLIN description has changed from Airfld Rubber Removal Deterg > 200K SF to
Surface Paint Signs Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent greater than 200,000 Square Feet. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of Surface Painted Signs (Multi-Color) Relective. Period of Performance is
1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award)..
The pricing detail quantity has decreased by 990,000.00 from 1,000,000.00 to
10,000.00.
CLIN 0013
The CLIN description Remove Pave. Markings Water < 1K SF has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast under 1,000 Square Feet. Period of Performance is 1 April
2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 1,000.00 from 1,000.00 to 0.00.
The unit of issue Square Foot has been deleted.
CLIN 0014
The CLIN description Remove Pave. Markings Water 1K-5K SF has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast 1,000 and 5,000 Square Feet. Period of Performance is 1
April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 5,000.00 from 5,000.00 to 0.00.
CLIN 0015
The CLIN description Remove Pave. Markings Water > 5K SF has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast over 5,000 Square Feet. Period of Performance is 1 April
2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 50,000.00 from 50,000.00 to 0.00.
CLIN 0016
The CLIN description Thermoplastic Marking 1 Color has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking One (1) Color. Period of Performance is 1 April 2016 to 31 March
2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,500.00 from 2,500.00 to 0.00.
CLIN 0017
The CLIN description Thermoplastic Marking 2 Color has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Two (2) Color. Period of Performance is 1 April 2016 to 31 March
2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 0018
The CLIN description Thermoplastic Marking 3 Color has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Three (3) Color. Period of Performance is 1 April 2016 to 31 March
2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 0019
The CLIN description Surface Paint Signs Non-Reflective has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Non-Relective. Period of Performance is 1 April 2016 to 31
March 2017. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
CLIN 0020
The CLIN description Surface Paint Signs Reflective has been deleted.
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Relective. Period of Performance is 1 April 2016 to 31
March 2017. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 10,000.00 from 10,000.00 to 0.00.
CLIN 1001
CLIN 1002
CLIN 1003
CLIN 1004
CLIN 1005
CLIN 1006
CLIN 1007
Airfld Rubber Removal Water > 200K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting under 50,000 Square Feet. Period of Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance
CLIN 1008
to Remove Pave. Markings Water < 1K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting between 50,000 and 200,000 Square
Feet. Period of Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the
Specifications. Work consist of Removal of Pavement Markings with Water Blast under 1,000
Square Feet. Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is
CLIN 1009
Remove Pave. Markings Water 1K-5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of Removal of Pavement Markings with Water Blast 1,000 and 5,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
CLIN 1010
Remove Pave. Markings Water > 5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent less than 50,000 Square Feet. Period of
Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of Pavement Markings with Water Blast over 5,000 Square Feet. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located
CLIN 1011
to Surface Paint Signs Non-Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent between 50,000 to 200,000 Square Feet.
Period of Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of completion of Surface Painted Signs (Multi-Color) Non-Relective. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located
CLIN 1012
Surface Paint Signs Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent greater than 200,000 Square Feet. Period of
Performance is 1 April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of Surface Painted Signs (Multi-Color) Relective. Period of Performance is
1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award)..
CLIN 1013
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast under 1,000 Square Feet. Period of Performance is 1 April
2017 to 31 March 2018. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 1,000.00 from 1,000.00 to 0.00.
The option status has changed from Option to No Status.
CLIN 1014
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast 1,000 and 5,000 Square Feet. Period of Performance is 1
April 2017 to 31 March 2018. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 5,000.00 from 5,000.00 to 0.00.
CLIN 1015
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast over 5,000 Square Feet. Period of Performance is 1 April
2017 to 31 March 2018. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 50,000.00 from 50,000.00 to 0.00.
CLIN 1016
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking One (1) Color. Period of Performance is 1 April 2017 to 31 March
2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,500.00 from 2,500.00 to 0.00.
CLIN 1017
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Two (2) Color. Period of Performance is 1 April 2017 to 31 March
2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 1018
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Three (3) Color. Period of Performance is 1 April 2017 to 31 March
2018. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 1019
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Non-Relective. Period of Performance is 1 April 2017 to 31
March 2018. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
CLIN 1020
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Relective. Period of Performance is 1 April 2017 to 31
March 2018. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 10,000.00 from 10,000.00 to 0.00.
CLIN 2001
CLIN 2002
CLIN 2003
CLIN 2004
CLIN 2005
CLIN 2006
CLIN 2007
Airfld Rubber Removal Water > 200K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting under 50,000 Square Feet. Period of Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance
CLIN 2008
to Remove Pave. Markings Water < 1K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting between 50,000 and 200,000 Square
Feet. Period of Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the
Specifications. Work consist of Removal of Pavement Markings with Water Blast under 1,000
Square Feet. Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is
CLIN 2009
Remove Pave. Markings Water 1K-5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal utilizing Water Blasting greater than 200,000 Square Feet.
Period of Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of Removal of Pavement Markings with Water Blast 1,000 and 5,000 Square Feet.
Period of Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award)..
CLIN 2010
Remove Pave. Markings Water > 5K SF.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent less than 50,000 Square Feet. Period of
Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of Pavement Markings with Water Blast over 5,000 Square Feet. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located
CLIN 2011
to Surface Paint Signs Non-Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent between 50,000 to 200,000 Square Feet.
Period of Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications.
Work consist of completion of Surface Painted Signs (Multi-Color) Non-Relective. Period of
Performance is 1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located
CLIN 2012
Surface Paint Signs Reflective.
The CLIN extended description has changed from Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Airfield Rubber Removal with Detergent greater than 200,000 Square Feet. Period of
Performance is 1 April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). to Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of Surface Painted Signs (Multi-Color) Relective. Period of Performance is
1 April 2016 to 31 March 2017. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award)..
CLIN 2013
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast under 1,000 Square Feet. Period of Performance is 1 April
2018 to 31 March 2019. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 1,000.00 from 1,000.00 to 0.00.
CLIN 2014
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast 1,000 and 5,000 Square Feet. Period of Performance is 1
April 2018 to 31 March 2019. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 5,000.00 from 5,000.00 to 0.00.
CLIN 2015
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of Removal of
Pavement Markings with Water Blast over 5,000 Square Feet. Period of Performance is 1 April
2018 to 31 March 2019. NOTE: This CLIN is for performance located on
__________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 50,000.00 from 50,000.00 to 0.00.
CLIN 2016
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking One (1) Color. Period of Performance is 1 April 2018 to 31 March
2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,500.00 from 2,500.00 to 0.00.
CLIN 2017
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Two (2) Color. Period of Performance is 1 April 2018 to 31 March
2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 2018
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of performing
Thermoplastic Marking Three (3) Color. Period of Performance is 1 April 2018 to 31 March
2019. NOTE: This CLIN is for performance located on __________________AFB (entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 2,200.00 from 2,200.00 to 0.00.
CLIN 2019
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Non-Relective. Period of Performance is 1 April 2018 to 31
March 2019. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 5,000.00 from 5,000.00 to 0.00.
CLIN 2020
The CLIN extended description Contractor shall furnish all supervision, labor, and equipment to perform IAW the SOW and per the Specifications. Work consist of completion of
Surface Painted Signs (Multi-Color) Relective. Period of Performance is 1 April 2018 to 31
March 2019. NOTE: This CLIN is for performance located on __________________AFB
(entred upon contract award). has been deleted.
The pricing detail quantity has decreased by 10,000.00 from 10,000.00 to 0.00.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0013:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-APR-2016 TO
31-MAR-2017
N/A N/A
FOB: Destination
The following Delivery Schedule Item has been deleted from CLIN 0014:
The following Delivery Schedule Item has been deleted from CLIN 0015:
The following Delivery Schedule Item has been deleted from CLIN 0016:
POP 01-MAR-2016
TO
28-FEB-2017
The following Delivery Schedule Item has been deleted from CLIN 0017:
The following Delivery Schedule Item has been deleted from CLIN 0018:
The following Delivery Schedule Item has been deleted from CLIN 0019:
The following Delivery Schedule Item has been deleted from CLIN 0020:
The following Delivery Schedule item for CLIN 2013 has been changed from:
POP 01-APR-2018 TO
31-MAR-2019
The following Delivery Schedule item for CLIN 2014 has been changed from:
31-MAR-2019
The following Delivery Schedule item for CLIN 2015 has been changed from:
The following Delivery Schedule item for CLIN 2016 has been changed from:
The following Delivery Schedule item for CLIN 2017 has been changed from:
The following Delivery Schedule item for CLIN 2018 has been changed from:
The following Delivery Schedule item for CLIN 2019 has been changed from:
The following Delivery Schedule item for CLIN 2020 has been changed from:
(End of Summary of Changes)
File details come from the government source that posted it. Updated .