ANNEXURE-4- New Tank Sketches.pdf
PDF 4 MB Posted
- Attached to
- AAFES Underground Storage Tank Federal contract opportunity
- Solicitation number
- FA706024R0004
About this file
This document appears to be a set of work notes detailing the installation of an underground storage tank (UST) system at a Defense Army and Air Force Exchange Services (AAFES) gas station located at Joint Base Anacostia-Bolling in Washington, D.C. The key details include:
The project involved replacing six under dispenser containment sumps, four 12,000-gallon underground fiberglass reinforced plastic gasoline storage tanks, associated piping, fittings, monitoring systems, and accessories. The work also included removing old tanks and sumps, excavating and backfilling trenches, testing and commissioning the new system, and coordinating with AAFES personnel. Certified underground storage tank technicians were required to perform the fuel tank work in compliance with environmental regulations.
The related federal contract opportunity is a small business set-aside solicitation (FA706024R0004) issued by the Department of the Air Force Headquarters District Washington for the AAFES UST project. The magnitude of the contract is between $500,000 and $1,000,000, and a 20% bid bond is required. Funds are not presently available, and the government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ol I{)
(X)_ .
WORK NOTES:
0 HAY BALES WERE PLACED AROUND EXISTING INLETS
- AS SHOWN.
@ THE i1.ooo GALLON BAKER TANK WAS PLACED HERE AS SHOWN.
© SHORING WAS PLACED AROUND ENTIRE .EXCAVATION.
0 TEMPORARY VENTS, 't' DIAMETER, WERE PLACED FOR EXISTING
UNDERGROUND STORAGE TANKS IN ACCORDANCE WITH
. NfPA 30 ON 21 MARCH 1996.
® THE PAVEMENT WAS SAW-CUT AS REQUIRED FOR
INSTALLATION OF THE UST.
(j)
TEMPORARY CHAIN LINK FENCE WAS PLACED
AROUND EXCAVATION.
SAW-CUT EXISTING .CONCRETE PAVEMENT AS
REQUIRED FOR INSTALLATION OF A 2" SIPHON
LINE. SEE DETAIL ON SHEET NO. C-3.
© CONDUIT AND WIRING WERE INSTALLED UNDERGROUND TO
INTEGRITY CONTROL PROBE PANEL IN ELECTRIC CLOSET RM#120.
I
0 ELECTRICAL ROOM FLOOR ANO EXTERIOR SIDEW.ALK WERE REMOVED
TO EXPOSE CONDUIT BLOCKED WITH GROUT COMPOUND •
(REFER TO DAILY REPORTS). CONDUIT REPLACED TO COMPLY WITH
1996 NATIONAL ELECTRICAL CODE (NEC).
® THE THREE EXISTING 4t' DIAMETER SUMPS WERE WATER TESTED
AT THE REQUEST OF THE WASHINGTON, O.C. FIRE MARSHALL. ALL
THREE SUMPS FAILED ANO WERE REPLACED WITH CORNING SUMPS.
IN ADDITION, NON-CATHODIC PROTECTED FITTINGS (OUT Of COMPLIANCE) •
WERE REPLACED WITH - MATERIALS THAT COMPLY WITH LOCAL, STATE,
AND _FEDERAL REQUIREMENTS.
@ THE CRUSHED ROCK {OUT OF COMPLIANCE) IN;TALLEO IN 1994
WAS REPLACED WITH WELL ROUNDED PEA GRA'(EL.
@ EXCAVATED TO AN APPROXIMATE DEPTH Of 14_ FEET
. FOR INSTALLATION OF 12,000 GALLON DOUBLE WALL
UNDERGROUND f'IBERGLASS GASOLINE STORAGE TANK (fOR REGULAR UNLEADED GASOLINE).
@ TANK PIPING SUMP, 42" .DIAMETER, WITH 30"
DIAMETER MANHOLE FRAME AND COVER SET IN
CONCRETE, FLUSH WITH PAVEMENT SURFACE. SEE
DETAILS ON SHEET NO. C-3 •
• @ MANHOLE FRAME, 18" DIAMETER, AND COVER
SET FLUSH IN CONCRETE FOR ACCESS TO INTERSTITIAL
PROBE, SEE DETAILS· ON SHEET NO. C-3.
@ SPJLL CONTAINMENT MANHOLE FRAME, 16" DIA�ETER,
AND COVER SET fLUSH IN CONCRETE FOR TANK
FILL. SEE DETAILS ON SHEET NO, C-3.
@ SPILL CONTAINMENT !MANHOLE FRAME, 16'' DIAMETER,
AND COVER SET FLUSH IN CONCRETE FOR STAGE 1
VAPOR RECOVERY. SEE DETAILS ON SHEET NO. - C-3.
®7 MANHOLE FRAME, 1li" DIAMETER, AND COVER SET
FLUSH IN CONCRETE FOR TANK· INVENTORY SYSTEM
PROBE. SEE DETAIL ON SHEET C-3.
------------------------------ - • -------- l - -
\ EXISTING GROUNDWATER CHAPPIE JAMES BOULEVARD . .
- -- - T - -
CENTERLINE OF CHAPPIE JAMES BOULEVARD _j MONITORING WELL N, URB LINE
---������;-��-����--������ ____:::;:;-- --6" GAS ----------- --- - --------------------------------------
INSTALLATION or TANK 11 5 4 6
19,8
GENERAL NOTES:
1. ALL PIPING, F'ILL CAPS, VAPOR RECOVERY FITTINGS, MANHOLES,
ETC., ARE COLOR-COOED WITH PAINT AS F'OLLOWS:
1, REGULAR GASOLINE - BLUE
2. UNLEADED REGULAR GASOLINE - WHITE
3. SUPER UNLEADED GASOLINE - RED
2. PRODUCT, VAPOR RECOVERY ANO VENT PIPING IS PITCHED UP
1/8" PER FT. F'ROM PIPING SUMPS TO DISPENSERS OR VENT
3. ALL WORK NEAR GASOLINE DISPENSING AREA ANO STORAGE '
TANK AREA WAS DONE IN ACCORDANCE WITH CLASS 1
DIVISION • 1 HAZARDOUS LOCATION NATIONAL ELECTRICAL CODE
REQUIREMENTS. EXISTING ELECTRICAL. WAS UPGRADED TO
CLASS I, DIVISION I REQUIREMENTS.
4. ALL ELECTRICAL CONDUITS ARE CONSTRUCTED OF RIGID STEEL
AND HAVE _SEAL-OFF F'ITTINGS INSTALLED AT .BOTH 'ENDS
OF CONDUITS RUNS.
5. DURING CONSTRUCTION AND PRIOR TO FINAL ACCEPTANCE BY
THE CONTRACTING OFFICER, TANK WAS BALLAST(D
AS REQUIRED PER MANUFACTURERS INSTRUCTIONS AND
RECOMMENDATIONS. UPON FINAL ACCEPTANCE BY CONTRACTING
OFFICER, °TANK WAS EMPTIED COMPLETELY FOR INITIAL
PRODUCT FILL BY AA�t§ •..
6. INSTALLATION OF UNDERGROUND STORAGE TANK, SIPHON
KIT, ANO SYSTEM ACCESSORIES WAS IN STRICT
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS.
7. EXISTING GASOLINE STORAGE ANO DISPENSING SYSTEM WAS
UPGRADED IN ACCORDANCE WITH ALL APPLICABLE CODES
AND STANDARDS.
URB LINE
8. NEWLY INSTALLED TANK AND GASOLINE SYSTEM WAS TESTED TO COMPLY
WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS.
WRITTEN TEST RESULTS CERTIFY THAT TANK ANO SYSTEM IS LEAK-TIGHT
AND IS 'INSTALLED PER CODE.
9. UPON COMPLETION OF TANK INSTALLATION, EXISTING TANKS WERE TESTED
TO ENSURE NO DAMAGE RESULTED DURING CONSTRUCTION ACTIVITIES.
10. ALL REQUIRED PERMITS, ANO INSPECTlONS WERE OBTAINED FROM CITY, COUNTY AND STATE. ALL FEES FOR PERMITS, INSPECTIONS, AND REVIEWS
WERE PAID BY CONTRACTOR.
11, "TANKNOLOGY, INC." (UNDER SEPARATE CONTRACT WITH AAFES)
MADE PERIODIC INSPECTIONS OF GASOLINE FUEL SYSTEM,
TANK INSTALLATION, PIPING, MONITORING, DISPENSING, ETC.
VISITS WERE COORDINATED PER TANKNOLOGY, INC. REQUIREMENTS
(713-690'-8265, MR. DAVID SCOTT),
12. SEE SHEET C-1 FOR LEGEND.
13, ALL ELECTRICAL WORK COMPLIES WITH N.E.C. 1996 REQUIREMENTS
AND ALL WIRING, CONDUITS, FITTINGS, SEALS AND COMPONENTS
CARRY UL LABELS AS APPROVED FOR THE PURPOSE INSTALLED.
14. HAZARDOUS AREA WIRING COMPLIES WITH N.E.C. 1996
REQUIREMENTS FOR CLASS 1, DIVISION 1 AREAS.
15. EXTERIOR CONDUITS ARE CONSTRUCTED OF HEAVY WALL RIGID GALVANIZED
STEEL (RGS) WITH 40 MIL PVC PROTECTIVE COATING. INTERIOR CONDUIT
IS CONSTRUCTED OF ELECTRIC METALLIC TUBING (EMT). ALL WIRING IS
600 VOLT, COPPER TYPE THWN (MTW) AND IS HOUSED IN
CONDUIT AND ENCASED IN CONCRETE.
O' 1"=20'
20' 40' 60'
-e,"'>---------;:-:i-,Ji.,.
80'
. I l i i
100'
C/J z iii
I �
·W!llU !
1 l lllnin
C:
! I�:;:l.
�� ·� Q, .... ""
-.::io � 11 au n ,u "' t ..
jl;j� . i ::.l·;;: !o �
::z:::t B� I OCl.l � 0: !
t] s
IQ !
i i ·"· g t/l z I-el z 0
52 t/l(/) z
� !!! 0� " z a::
.. 2:: §� � io �� z 0 0
(.) �� � j::: 5� z � j mo I t;
�L,J � l;: <(
Cl ".. i:2 z 11.
� � � � .._ ii < i
COO£ let. NO. 80091 SIZE: 0
5C.',!L ASSHOWN
EfONO, STk PROJECT NO.
SPEC HO.
CONSTR. COKlR,ICI' HO.
HAWAC � MO.
SHEET I.D.
C-2
I
New tank area
20,000 Reg
20,000 Split 10k Reg + 10K Super
2" Hl<SH CRO�N TYP.
AROUND ALL OPENIN<SS -------------
4'-b" AVERA<SE BURIAL
DEPTH AS MEASURED AT
CENTER OF TANKS. ANY
DEVIATION FROM THIS DEPTH
TO SE APPROVED SY
CONSTRUCTION MANA<SER
ONLY PRIOR TO TANK
SETTIN<S ACTIVITIES.
REINFORCE CONCRETE SLAS
(SEE CIVIL DRA�INCSS)
IN-TANK <SAU.SE PROSE Y'l!'---+------
'1096 OVERFILL ALARM
CALIBRATION.
INSTALL PER MFR'S
REQUIREMENTS
FE-PETRO 2 H.P.---�
SUSMERSISLE PUMP
(HOLD 4"-b" OFF
BOTTOM)
PEA <SRAVEL SED
4 BACKFILL (TYP)
4" DIA. FRP OR SCH. 40 PVC RISER
SENSOR COMMUNICATION
MONITORINCS SYSTEM
SRINE HYDROSTATIC RESERVOIR
HYDROSTATIC SENSOR
SPILL CONTAINERS (ALL
le" MANHOLE FOR SRINE RISER
.020 SCHD 40 PVC SLOTTED
�LL PIPE. .020 SLOT TO
EXTEND 12" MIN. SELO�
SOTTOM OF TANK 4
AT 24" FROM FINISH
TANKS)
2opoo <SALLON
DOUSLE�ALL
UNDER<SROUND
FISER<SLASS STORA.SE
TANK
Nearly 42'- Contractor to finalise
SUN<S HOLE
ALL RISERS TO SE
RTHA RISER PIPE 4"
PXP (PIPE) AND RTHA
RISER PIPE ADAPT 4"
SXMN (THREADED
ADAPTER ON 60TH
ENDS OF PIPE) UNLESS
NOTED OTHE-ISE
(TYP.)
<SRADE
2" HIGH C.ROl"4N TYP.
AROUND ALL OPENINGS
MONITORING TUBE
SPILL CONTAINERS (ALL
TANKS)
4'-6" AVERAGE BURIAL
DEPTH AS MEASURED AT
CENTER OF TANKS. ANY
DEVIATION FROM THIS DEPTH
TO BE APPROVED BY
CONSTRUCTION MANAGER
ONLY. PRIOR TO TANK
SETTING ACTIVITIES. ---�
4" DIA. FRP OR SC.H. 40 PVC. RISER
SENSOR COMMUNICATION
MONITORING SYSTEM
HYDROSTATIC. SENSOR
BRINE HYDROSTATIC. RESERVOIR
18" MANHOLE FOR BRINE RISER
REINFORCE c.oNc.RETE sLAB-l-----l-l--1----/ r"--'-'----'
1__,_�_=�!?��1:���--
2....c..'.
1r1F�"'-'--'-""-'--'--'--'-L�1
•r
-aa-�'---'----�'---' �4__,_ =_ �-�-�_�j_r:�:'¥1 (SEE CIVIL DRAl"41NGS)
IN-TANK GAUGE PROBE 11'4/ -+---------~
'10% OVERFILL ALARM
CALIBRATION.
INSTALL PER MFR'S
REQUIREMENTS
FE-PETRO 2 H.P. --
SUBMERSIBLE PUMP
(HOLD 4"-6" OFF
BOTTOM)
.020 SC.HD 40 PVC. -----B,;isl
SLOTTED
1"4ELL PIPE. .020 SLOT TO
EXTEND 12" MIN. BELOl"4
BOTTOM OF TANK 4
AT 24" FROM FINISH
GRADE
PEA GRAVEL BED
4 BACKFILL (TYP.)
ALL RISERS TO BE
RTHA RISER PIPE
4" PXP (PIPE) AND
RTHA RISER PIPE
ADAPT 4" BXMN
(THREADED
ADAPTER ON BOTH
ENDS OF PIPE)
UNLESS NOTED
10,000 Gallon
DOUBLEl"4ALL
OMPARTMENTALIZED
UNDERGROUND
FIBERGLASS
STORAGE TANK
42' Nearly- To be confirmed by contractor
DROP TUBE
SET AT '15%
CAPACITY
T3 Super
Q
Q
4" TO Q
6"MAX. 0
10 1-4 11
| Sheet C-2.pdf |
| ANNEXURE-4-NEW TANK-SKETCHES-5-Sheets.pdf |
| ANNEXURE-4-NEW TANK-SKETCHES-4-Sheets |
| Tank-Location-Plan-1 |
| Tank- 20k Single Compartment |
| Tank-20k -Two Compartment |
B-1311 GAS STATION-Plan
File details come from the government source that posted it. Updated .