Attachment 1 - PWS
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
AIR FORCE TECHNICAL APPLICATIONS CENTER
NUCLEAR TREATY MONITORING DIRECTORATE
Expert Scientific & Analytical Support
(ESAS) 2
Performance Work Statement
8 February 201 6
I of 13
UNCLASSIF IED
UNCLASSIFI ED
INTRODUCTION
For Background, Overview, Objective, and Scope, see classified Appendix A.
UNCLASS IFIED
UNCLASSIFIE D
TABLE OF CONTENTS
SECTION 1.0 Description of Service
1.1 Research and Study Support
1.2 Phenomena Modeling Support
1.3 Data Analysis Algorithm Development Support 5
1.4 Laboratory and Experimental Support
1.5 Evaluation, Validation and Integration Support
1.6 Data Analysis Systems
1.7 Technical Database Support
1.8 Projects and Prototypes
1.9 Review Panel and Conference Support
1. 10 Management and Administrative Requirements
SECTION 2.0 Services Summary
SECTION 3.0 Government-Furnished Property and Services
3.1 Work Performed in Bldg 10989 & Bldg 1428
3 .2 Deployments and Other Work Areas
SECTION 4.0 General Information
4.1 Contract Requirements
4.2 Security
4.3 Hours and Locations of Operations ... .. ... .. ... .... .. .. .. ... .... .... ... .. ........................ .... . I 0
4.4 Travel
4.5 Safety
4.6 Training
SECTION 5.0 Performance of Services During Crisis Declared by the NCA
SECTION 6.0 Appendices
Appendix A. Classified ESAS Introduction ... ... ................... .... .... Separate Document Appendix B. Applicable Documents Appendix C. Contract Deliverable Requirement List (CDRL)
3of13
UNCLASSIF IED
PERFORMANCE WORK STATEMENT
EXPERT SCIENTIFIC AND ANALYTICAL SUPPORT (ESAS)
23 July 2015
SECTION 1.0 DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, assets, services, (except as specified in Section 3 as government furnished property and services) and other items necessary to perform scientific, engineering, analytical, technical, management, and necessary administrative support to the AFT AC mission.
The funding appropriation for the work to be performed wi ll be identified on the individual Task Order Performance Work Statement.
1.1 Research and Study Support. The contractor shall plan, organize, staff, and perform analysis of alternatives, studies, research, and surveys in support of the Long Range Detection Program (LRDP) and other proliferation detection technology for AFT AC. The contractor shall consult with vendors, contractors, national laboratories, academia, and other subject matter experts (SME's) to execute on-going activities or identify potential issues. The contractor shall research and review requirements, concepts, designs, capabilities, specifications, techniques, procedures, practices, training, analytical tools, documentation, and data directly related to the task. The contractor shal l procure materials, parts, equipment, and services in direct support of the tasks. The contractor shall report findings, results, recommendations, corrective actions, and revisions. (AOOOI, A0004, AOOOS, A0006, AOOJ3, A0014)
1.2 Phenomena Modeling Support. The contractor shall develop models and simulations representing various signal sources, sensor performance and location, multi-phenomena signal propagation paths, facilities, and environmental conditions. The contractor shall be familiar with modeling, simulation, and analytical software tools and shall include proficiency with C++ and MatLab programming, Unix based systems and Oracle database. The contractor shall procure materials, parts, software, and equipment as required to support task objectives as approved by the Government Program Manager (GPM). The contractor shall support and provide documentation and software products for developmental models and simulations to AFT AC to support task objectives. (AOOOI, AOOOS, A0006, A0009, AOOIO, AOOl 1, A0012, A0013, A0014, A0015, A0016, A0017, A0018, A0019, A0020, A0021, A0022, A0023)
1.3 Data Analysis Algorithm Development Support. The contractor shall develop and provide methods and tools to enable and improve the analysis of multi-phenomena data sets. Tasks may include: (1) develop data readers to interpret data collected from various collection systems, (2) develop data reduction tools, (3) develop enhanced tools and methods for clutter suppression, coherent processing, and for extracting low level signals of interest from noisy data, (4) improve methods and tools for analysis of large data sets, (5) develop automated tools to improve efficiency and reduce manpower requirements for analysis of large data sets, (6) modify existing analysis tools to improve capabilities such as better error handling or improved efficiency, (7) provide technical documentation detailing methods used, relevant findings, conclusions, and all assumptions and mathematical foundations used to reach stated conclusions, (8) provide
4of13 documentation pertruning to software code development, and (9) provide technical documentation to allow users to efficiently operate and apply developed tools. The contractor shall procure materials, parts, software, and equipment as required to support task objectives as approved by the GPM. The contractor shall report findings, results, recommendations, corrective actions, and revisions. (AOOOl , A0005, A0006, A0009, AOOlO, A0013, A00 14, A0015, A0016, AOOI 7, AOOI 8, AOOl 9, A0020, A0021 , A0022, A0023)
1.4 Laboratory and Experimental Support. The contractor shall provide data analysis services to support AFT AC testing activities involving the collection of multi-phenomena data.
The contractor shall perform fabrication, modeling, prototyping, calibrations, and tests to support analysis and evaluation of technologies and systems. The contractor shall perform on-site analysis support during field testing. On-site tasks may include: (1) data reduction, (2) verify data integrity, (3) develop data readers to interpret data collected from various collections systems,(4) data copying, (5) operate analysis routines for initial detection of signals of interest, and (6) troubleshoot data anomalies. The contractor shalJ perform post-test analysis support, which includes the tasks described in paragraph 1.3 in addition to conducting detailed analysis to detect low level signals in noisy data. Analysis results shall provide at a minimum, signal to noise ratios, absolute noise levels, absolute signal levels, pertinent frequency characteristics, bandwidth spectrum, spectral features, and temporal features. The contractor shall procure materials, parts, software, and equipment to support task objectives as approved by the GPM.
The contractor shall provide technical documentation detailing methods used, relevant findings, results, conclusions, and all assumptions and mathematical foundations used to reach stated conclusions. The contractor shall provide alternative solutions and recommendations in support of the task. The contractor shall support test plan and report preparation. The contractor shall implement solutions to support task objectives as approved by the GPM. (AOOO 1, A0005, A0006, A0007, A0008, A0009, AOOlO, AOOl 1, A0012, A0013, AOO J4, A0015, A0016, AOOl 7, A0018, A0019, A0020, A002 1, A0022, A0023)
1.5 Evaluation, Validation and Integration Support. The contractor shall collect, compile, and analyze documentation, data, and other products to identify, determine, evaluate, and validate progress, status, risk, accuracy, data quality, anomalies, events, feas ibility, compliance, cost benefit or effectiveness using compliance documents, guidance, plans, manuals, and commercial standards for the task in support of the LRDP or other proliferation detection technology throughout the life cycle. The contractor shall develop, review, and recommend revisions to documentation and data including, but not limHed to plans, procedures, manuals, results, and reports to identify, analyze, and prevent personnel injury, system downtime, and logistics problems. The contractor shall perform fabrication, modeling, prototyping, calibrations, testing, ground station installation, and tum-key support for mission analysis, evaluation, integration, and deployment of technologies and systems. The contractor shall develop computer-based tools in direct support of the task. The contractor shall provide alternative solutions and recommendations in support of the task. The contractor shall prepare and evaluate mruntenance analysis, support concepts, system performance, and plans. The contractor shall propose alternative solutions to improve life-cycle costs, system performance, and mission readiness. The contractor shall procure materials, parts, software, and equipment as necessary to support task objectives as approved by the GPM. The contractor sbalJ report findings, results, recommendations, and corrective actions. Based on government review of alternative solutions, 5of13 the contractor shall implement solutions as approved by the GPM to support task objectives.
(A0001, A0005, A0006, A0007, A0008, A0009, AOOlO, AOO I l , A0012, A00 13, A0014, A0015, A0016, AOOI 7, A0018, A0019, A0020, A0021 , A0022, A0023)
1.6 Data Analysis Systems. The contractor shall develop and support analytical tool development upgrades for LRDP systems. The contractor shall develop and maintain analysis systems. This shall include executing a fonnaJ process for validating new analysis systems and provide recurring technkal services to modify and sustain continuous reliable operation of analytical processes as information technology and software evolve. The contractor shall provide operations, maintenance, logistics, engineering, and sustainment support to field and equipment locations to accomplish task objectives. The contractor shal l procure materials, parts, software, and equipment to support task objectives as approved by the GPM. (AOOOI, A0005, A0006, A0007, A0013, A0014, A0015, A0016, A0017, A00 18, A0019, A0020, A0021, A0022, A0023)
1.7 Technical Database Support. The contractor shall ensure critical data analysis tools, raw and analyzed data, and associated reports are properly documented and organized. The contractor shall cooperate with Government and contractor-supported database administrators to ensure no products are lost in update or maintenance activities, to include verifying the integrity of data backups prior to routing database maintenance or recovery from rare system failures.
The contractor shall support the review of technical documentation for Government software compliance and report findings, results, recommendations, and corrective actions. (AOOO 1, AOOOS, A0006, A0007, A0013, A0014)
1.8 Projects and Prototypes. The contractor shall develop and fabricate hardware and software prototype systems or modules in support of all PWS tasks. Prototypical hardware and software elements are not required to meet sustainment and supportability requirements. The contractor shall use reasonable and prudent engineering, fabrication, packaging, and storage standards appropriate for their intended use as demonstration or pre-production articles prepared for experimentation and phenomenological validation purposes, to include limited field experimentation environments. All hardware and software products shall be provided to the Government upon completion of the task and as required by the task order CDRL. (AOOOl , A0002, A0003, A0004, A0005, A0006, A0007, A0008, A0009, AOO IO, AOOll , A0012, A0013, A0014, A0015, A0016, A0017, A0018, A0019, A0020, A0021, A0022, A0023)
1.9 Review Panel and Conference Support. The contractor shall provide support for the semi annual Satellite System Review Panel, working groups, and other technfoal meetings and conferences. The term "support" shall include: (a) identify and reserve locations to hold the event, (b) provide subject matter experts (SMEs) as participants, speakers, or panel members, (c) the payment of travel reimbursements for SMEs including their cost of travel and lodging in accordance with Government Joint Federal Travel Regulations (JFTR) guidelines, and (d) provide logistics support for the actual event. Travel expenses shall be paid to SMEs who may be required to remain at or near the event location after the event to help edit and finalize the executive summary and minutes. No travel payments or expense reimbursements will be processed for Government personnel. For those members without a parent organization, the contractor shall handle all administrative actions regarding those members and their security
6of13 clearances, including the processing of a DD Form 254 (Department of Defense Contract Security Classification Specification) for each member who is in a consultant arrangement with the contractor. These DD Form 254s shall be attached to the Consultant Agreement and delivered to the parent organization in accordance with DSS 15GM Guidance; April 2000, Subsection 86, paragraph 2-2-18601. Travel arrangements are the responsibility of the contractor and may utilize contractor travel resources to aid SMEs when it is more expedient or more cost effective. The contractor shall include costs for this task in the regular Funds and Man-hour Expenditure Report fo r the corresponding months reporting period. Work performed by the contractor under this task shall not require an Organizational Conflict of Interest (OCI) Plan. (AOOO l , A0002, A0003, A0004, A0005, A0006, A0013) l.10 Management and Administrative Requirements. The contractor shall maintain a system for planning, documenting, controlling the work undertaken, manpower expended by labor category, quality of work, purchasing and subcontracting, expenses incurred under the terms of this PWS, facilities needed, and compliance with laws and regulations governing employment and the workplace. The GPM may change, add, and reprioritize contract activities as needed to support mission objectives that fall within the scope of the contract. These activity changes are often in response to national and international emerging or emergency requirements. The contractor shall evaluate the impact of changes, additions, reprioritization on the contract resources and existing tasks, and inform the GPM. Impacts that are beyond the available funds on contract shall be approved by the Contracting Officer before any work may start. The contractor shall submit justification to support the request through the Contracting Officer for approval.
1.10.1 Task Baseline. The contractor shall establish task baselines fo r schedules, manpower, expenditures, cost reimbursable elements, project milestones, meetings, and deliverables by calendar date. Within ten ( 10) working days of award of a task order, the contractor shall provide the GPM the baselines, labor categories, and names of the task leaders and key personnel assigned to the task. If the GPM shifts priorities in the baseline of a task order, the contractor shall adjust the baseline to reflect changes, additions, and shifts in those priorities.
The contractor shall adjust the baseline as required to reflect changes, additions, and shifts in priority identified by the GPM. If the contractor perceives any requested baseline changes are unreasonable, the contractor shall address the concern with the Contracting Officer. No changes to the contract scope or costs can be made except by direction of the Contracting Officer. (AOOO I, A0002, A0003, A0006)
1.10.2 Task Status. The contractor shall ensure traceability of all man-hours and cost reimbursable elements (travel, supplies and materials) to each task. The contractor shal l report on the schedule, man-hour expenditures, cost reimbursable elements, calendar of supported travel, project milestones, reviews, meetings and briefings, deliverables status, an estimated completion date of each task, and accomplishment of service delivery summary performance and objectives quality assurance activities. (AOOO 1, A0002, A0003, A0006)
1.10.3 Other Contractor Relationships. The contractor shall enter into and maintain Associate Contractor Agreements (ACA) with other contractors and subcontractors performing services or providing deliverable materials and products of substance to AFT AC
7of13 personnel. The contractor shall similarly execute a non-disclosure agreement with contractors providing proprietary products to AFT AC. The prime contractor shall require subcontractors performing on any task order of this contract to execute an ACA with other contractors and subcontractors performing to other contracts within AFT AC. At the Government Contracting Officer's option, a requirement may be waived for extenuating circumstances or an additional requirement may be levied to execute an ACA with a contractor and subcontractor performing under a contract within AFT AC, but in a different directorate. This requirement does not extend to normal commercial vendors for off-the shelf products.
1.10.4 Kick off Meeting and Program Management Reviews. The contractor shall participate in an initial kick off meeting after award of contract and after award of subsequent task orders. The contractor shall support Program Management Reviews (PMRs) for open task orders and present status of the efforts. The contractor shall provide mjnutes of these meetings. (A0004)
SECTION 2.0 SERVICES SUMMARY
The Services Summary (SS) provides information on contract requirements and the expected level of contractor performance to be successful in meeting critical mission needs. These thresholds are critical to mission success. Procedures as set forth in the applicable Jnspection of Services clause in the contract will be used to remedy deficiencies. The Government retains the right to inspect all items included as part of this contract. Since this is an IDIQ contract, the performance objectives and thresholds identified below are overarching for all of the task orders.
Additional task order specific performance objectives and thresholds may be added for the individual task order.
Performance Objectives
PWS
Performance Threshold Para2rapb
Information and data deliveries are 1.1 - 1.10 90% of the time, task order timely, accurate, and complete as deliverables are timely, accurate, and determined by the CDRLs identified in complete in accordance with the the individual task order. CDRLs. The remaining 10% shall be corrected within 10 working days.
End item, hardware, software, and other 1.1 - 1.8 End item, hardware, software, and materials, parts, and equipment other materials, parts, and equipment purchased to support task order purchased satisfy the requirement at functional performance satisfy the least 95% of the time. The remaining requirement. 5% shall be corrected within 10 working days or as indicated in the task order PWS.
SECTION 3.0 GOVERNMENT-FURNISHED PROPERTY AND SERVICES. Access to government-furnished property, computer connectivity, and services will be limited to special purpose use in direct support of specific tasks performed in Building 10989, Patrick AFB, FL;
8of13
Building 1425, Cape Canaveral AFS, FL; field deployments; or other work areas. Government procedures shall be used for control and disposal of assets, equipment, parts, and materials.
3.1 Work Performed in Building10989, Patrick AFB, FL & Building 1428, Cape Canaveral AFS, FL. The government will provide use and access to typical office and maintenance workspace, equipment, supplies, and services available at these locations.
3.2 Deployments & Other Work Areas. The contractor shall request temporary use and access of any necessary site-specific government-furnished property and services required to accomplish the task. Based on the installation commander's approval, the contractor may be authorized to use government facilities while deployed at a government installation. The contractor shall require written authorization from the Contracting Officer in the form of a Letter of Identification (LOI). The GPM will determine if the property and services can be made available and inform the contractor of the course of action to be taken.
SECTION 4.0 GENERAL INFORMATION.
4.1 Contract Requirements .
4.1.1 Task Manager. The contractor shall provide a Task Manager who shal l be responsible for the performance of the work. The manager shall have full authority to act for the contractor on all contract matters relating to the operation of the contract and shall be available during normal duty hours to meet with Government personnel to discuss contract progress, performance, and issues.
4.1.2 Contract Operating Conditions.
4.1.2.1 This is a non-personal services contract. The.Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. The contractor shall manage its employees and guard against all actions that are the nature of personal services. The contractor shall notify the Contracting Officer (CO) immediately if they perceive any actions that constitute personal services.
These services shall not be used to perform any Inherently Governmental Functions
(IGF).
4.1.2.2 Most activities will be within normal office and travel conditions. However, field testing may require temporary deployment to remote, austere locations, with exposure to treacherous topography, hazardous weather conditions, potential wildlife confrontations, logistical barriers, and test ranges with unexploded ordnance outside safe areas. The contractor shall ensure personnel proposed to satisfy these support roles are physically, mentally, and emotionally capable of performing the tasks in these environments.
Deployments to remote and isolated locations for 30 to 45 days can be considered mentally and emotionally stressful. Due to the lack of available medical care facilities at remote and isolated locations, personnel with defects or diseases that could require immediate medical attention or produce catastrophic or life threatening conditions for the
9of13 individual or the team are precluded from remote deployments. The contractor shaJI comply with immunization, safety, and training requirements for traveling overseas.
4.1.2.3 The AFT AC workplace environment is very near to the Atlantic Ocean, which may require hurricane evacuation. A portion of the support force may relocate their functions to an alternate location within Continental United States (CONUS) to continue their activities. The contractor shall provide deployed contingency support as required to accomplish task objectives as approved by the GPM. Situational awareness and pre deployment preparation is required to ensure safety of personnel.
4.2 Security.
4.2.1 Compliance. The contractor shall be in compliance with DD Form 254 requirements.
DoD 5200. l R, Information Security Program Regulation or succeeding Air Force instructions may be used for additional guidance to the contractor.
4.2.2 Personnel Clearance. Key management personnel, along with all personnel assigned to the contract and performing classified work shall possess the appropriate final clearance, program access, and United States citizenship. The ESAS effort includes up to TOP SECRET/Special Compartmentalized Information (SCD requirements.
4.3 Hours and Locations of Operations.
4.3.1 Hours. Normal core working hours are defined as Monday through Friday, excluding federal holidays, from 0800 to 1700 local time in the time zone applicable to the location where the work is to be performed. Extended workdays and workweeks may be required as approved by the GPM.
4.3.2 Locations. The work may be performed at the contractor' s facility or other locations such as Patrick Air Force Base or Cape Canaveral Air Force Station, Florida or detachments, operating locations, equipment locations, laboratories, test ranges, and the other contractor's facilities.
4.4 Travel. The contractor may be required to perform periodic travel to accomplish specific tasks. The contractor shall obtain GPM approval before any travel. For local travel and during deployments, the contractor may provide or may share vehicle transportation with Government personnel to support team integrity, personnel safety, and operational efficiency. Properly licensed contractor personnel may be authorized to operate Government vehicles to support tasks. The contractor shall obtain passenger transportation, lodging, and subsistence, both domestic and overseas, in the performance of this contract. All travel shall be in accordance with Government Joint Federal Travel Regulation (JFTR) guidelines. The contractor shall maintain the capability to procure materials, supplies, and incidental services on short notice during deployments. The contractor shall provide a trip report within ten (10) working days from completion of the travel. The trip report shall contain the purpose for the trip, the names of the traveler(s), person(s) contacted, itinerary, di scussions that support the purpose of the trip, problems encountered, findings, conclusions, and recommendations. (A0014)
10of13
4.5 Safety. The contractor shall be solely responsible for the safety of their employees.
4.5.1 The contractor shall comply with all applicable safety standards and requirements during the performance of the contract. Additionally, the contractor shall comply with the safety cautions and warnings in operating manuals, technical orders, and technical instructions.
4.5.2 The contractor shall assess applicable safety factors prior to performance of all field work.
Ensure contractor personnel do not perform fie ld duties during existing or forecasted severe weather. Ensure all personnel are aware oflocal conditions, which may affect the safety of personnel (e.g., temperature/weather extremes, dangerous roads/trails/wild animals, approaching storms, test range hazards).
4.5.3 Safety issues shall be addressed as soon as they are made apparent. The contractor shall stop work and institute immedfate safe guards to prevent injuries. The situation or problem shall be referred to the Program Manager or the government team chief during deployments.
4.6 Training. The contractor shall train their employees to meet contract requirements.
Mandatory training courses that may be furnished by the Government are listed below. The Government Program Manager may identify additional training requirements.
4.6.1 Information Awareness Training is required for personnel who use Government computers.
4.6.2 Security Training (Derivative Classification & Marking, OPSEC, COMSEC) shall be required for personnel who are assigned to work in buildings 10989 and 1428 or work with classified information. Additionally, FOUO and Privacy Act protection are also required.
4.6.3 Cardiopulmonary Resuscitation (CPR), self-aid, buddy care, terrorism, and chemical warfare training shall be required for personnel who deploy to ensure personnel safety.
SECTION 5.0 .PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY.
The performance of these services is not considered mission essential during time of crisis.
Should a crisis be declared, the Contracting Officer or their representative will verbally advise the contractor of the revised requirements, followed by written direction.
SECTION 6.0 APPENDICES.
6.1 Appendix A. Classified ESAS Background, Overview, Objective, and Scope
6.2 Appendix 8. Applicable Documents
6.3 Appendix C. Contract Deliverable Requirement List (CORL)
UNC LASSIFIED
6.2 APPENDIX B - APPLICABLE DOCUMENTS
Reference Documents. The contractor shall consider all publications in the on-site publications library as a reference document, i.e. catalogs, unless identified as a compliance document.
Reference documents will be determined by task order.
Compliance Documents. The contractor shall comply with the procedures, practices, and equipment performance standards contained in the center instructions; DoD, Air Force, or Major Command (MAJCOM) guidance; military standard; technical publication; and manuals that are applicable to AFT AC missions and systems. The contractor shall comply with the latest version of applicable publication/technical order/technical instruction. The contract shall use Data Interchange Standards Association (DlSA) guidance as it applies to the AFT AC NDS Analysis System to ensure DoD interoperability and information assurance concerns are addressed. The contractor shal l adhere to applicable mandated information management standards outlined in the Defense Information Technology Standards Registry (DISR), AF unique standards in the Infostructure Technology Reference Model (i-TRM), DODI 8510.01 , Department of Defense Information Assurance Certification and Accreditation Process (DJACAP), AFPD 33-2, information Assurance (IA) Program, AFl 33-401 , Implementing Air Force Architectures and AFI 33-202, Network and Computer Security. The contractor shall consult with available government sources to ensure software development complies with mandatory DoD interoperability and information assurance requirements to prevent impact to government approval of software promotions. Government information regarding these requirements can be found at: http://iase.disa.mil/stigs/stig/index.html and http://jitc.fhu .disa.mil/apl/index.html
The websites listed below can be used for DoD and Air Force level publications. AFTAC technical instructions are maintained in the technical library and AFT AC guidance is maintained on the internal network.
Acquisition Streamlining and Standardization Information System - Quick Search feature http://assist.daps.dla.mil/guicksearch/
Air Force Technical Order System Information https://acc.dau.mil/CommunityBrowser.aspx?id= 159775
Department of Defense and Air Force Publishing http://www.e-publishing.af.mil/
12of13
6.2 APPENDIX C - CONTRACT DELJVERABLE REQUIREMENT LIST (CDRL)
Reports and other data required in this PWS shall be submitted in accordance with the Contract Data Requirements List (CDRL), which are a part of this contract.
Data Item DID Name AOOO I DI-MGMT-80368A Status Report A0002 DI-FNCL-80331 A Funds and Man-Hours Expenditure Report A0003 Dl-MGMT-81468 Contract Funds Status Report (CFSR) A0004 DI-ADMN-81250A Conference Minutes A0005 DJ-MISC-80508B Technical Report - Study/Services A0006 DI-MlSC-8 I l 83A Integrated Master Schedule (IMS) A0007 TM-86-0IN AF Technical Manual Contract Requirements A0008 DI-MGMT-80033A Site Preparation Requirements and Installation Plan A0009 DI-NDTI-80603A Test Procedures AOOIO DI-NDTI-808098 Test/Inspection Report AOOI l DI-DRPR-80651 Engineering Drawings A0012 DI-ALSS-81529 Logistics Management Information (LMI) Data Product(s) A0013 DJ-MGMT-8 1453A Data Accession List (DAL) A0014 DI-MGMT-80368A Status Report (Trip Report) A0015 DI-IPSC-8143 IA System/Subsystem Specification (SSS) A0016 DI-1PSC-81433A Software Requirements Specification (SRS) A0017 DI-IPSC-81434A Interface Requirements Specification (IRS) A0018 Dl-IPSC-81435A Software Design Description (SOD) A00 19 DI-IPSC-81438A Software Test Plan (STP) A0020 DI-IPSC-81440A Software Test Report (STR) A0021 DI-IPSC-8144 JA Software Product Specification (SPS) A0022 DI-MCCR-80700 Computer Software Product End Items A0023 DI-IPSC-81429 Software Transition Plan (STrP)