This document is a set of Questions and Answers regarding a federal contract opportunity for the purchase, delivery, and installation of furniture for the Madera Cyber Innovation Center at the US Air Force Academy in Colorado.
The key details are:
- The contract opportunity number is FA700024Q0030 and it is for the Furniture, Delivery and Installation at USAFA Madera Cyber Innovation Center.
- The agency issuing the opportunity is the Department of the Air Force Headquarters Air Force Academy.
- A GSA schedule contract is not required to be considered for this procurement.
- The bid due date has been extended to June 12, 2024 by 4:00 PM MST.
- The delivery date has been changed to September 18, 2024.
- There are discrepancies between the Statement of Work and the Bill of Materials which have been clarified.
- Vendors are required to provide delivery lead times in their price quotes.
- Equivalent products to the specified brands are acceptable as long as they meet the required characteristics.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for Furniture at USAFA Madera Cyber Innovation Center (MCIC)
FA700024Q0030
· Could you please confirm whether having a GSA schedule contract is required in order to be considered for this procurement?
Answer: A GSA Schedule is not required
· Do you have any additional information on the cafe stool? Maybe a basis of design photo or a manufacturer name?
Answer: The PWS provides the café stool needed specifications. Some acceptable café stools include but are not limited to; Café stools by Sit on It or Versteel.
· Do you have the DWG's for this project that I can place furniture into?
Answer: DWG files can not be uploaded to SAM.gov. Any vendor that would like a copy of the DWG files may request them from the Contracting Officer (gary.monson@us.af.mil)
· Can the bid date be extended by one week?
Answer: The bid date has been extended by one week (12 June by 4:00 P.M MST)
· RFQ is due on 5 June 2024 – is this going to be enough time for questions to be answered and returned? If there are a lot of changes this most likely won’t be enough time for us to fix/change the design.
Answer: RFQ due date has been extended to 12 June. All questions must be provided no later than 3 June. All Q&As will be posted as quickly as possible. With the extension all vendors should have adequate time to make any needed changes to their proposals.
· The current delivery of product onsite: 13 August does not provide enough time for processing and lead time. Is there room for movement here?
Answer: The delivery date has been changed to 18 September. Additionally, the Solicitations has been updated to include the need to provide delivery lead times from date of award.
· There were discrepancies between the Atch 2 Furn BOM Excel and the Atch 1 SOW as follows. Please advise per notes questions below.
Ground Floor (Appendix 1)
3. Office and Design area 119:
f. 6 each 72x24 freestanding desk shells, grommet in corner, half high modesty panel, laminate tops and chassis ROW # 9 on Att 2 BOM shows 60 x 24 Laminate HT adj. desks QTY 6.
What is the correct dimension for these items 60 or 72 ?
Answer: Correct dimensions is 72; SOW is authoritative. The current BOM has been revised.
B. Mezzanine (Appendix 2)
3. 2 Offices - 409 and 410 to each include:
c. (wood veneer) Mobile BBF (Box Box File) with pencil tray to slide on top of drawer ROW # 13 on Att 2 BOM Shows File File (FF) Wood veneer Mobile peds.
Should we quote FF or BBF with pencil tray?
Answer: w/pencil tray; SOW is authoritative. The current BOM has been revised.
SOW P.13 -- C. Second Floor (Appendix 3)
1. SOW States: Classrooms 223,225 and 226 to each include:
a. 13 ea 24 x 60 x power adjustable height tables.
ATT-2 BOM (Row #42) Shows QTY 26. Appendix 3 Floor plan shows 12 in ea. Room.
Please advise of correct quantity for this item which appears to be 36 total.
Answer: The total should be 39 total; 12 for students, 1 for the instructor (total 13 per room). The current BOM has been revised
SOW P.9 -- 3. Studio 204 to include:
a. 2 each 60x24 laminate mobile desk shells with half...
ATT 2 BOM does not list any item of this Description Should this item be added to the BOM?
Answer: This is included in the BOM on Row 35
· SOW States 13 August 2024 as the required delivery date. We can quote lead-time after award. Is there a fixed award date, or is it acceptable to quote lead time from award to delivery?
Answer: Within your Price quotation it is required to include your delivery lead times from date of award. The delivery date in the SOW will be updated to a delivery date of 18 Sept. We would be unable to accept deliveries sooner than that date. As stated in the solicitation the delivery date may be delayed due to construction delays to building 2415. Before final shipment the contractor must Coordinate with the USAFA Project Manager and the awarding Contracting Officer for exact delivery and installation days.
· RM 115 would 24 X 60 tables be acceptable?
Answer: Yes; however, half as many tables would be needed with tables that are twice the size specified.
· Cascade cabinet is mentioned multiple times please clarify if this is a brand or characteristic?
Answer: Cascade by Smith Systems is a brand; equivalent is acceptable. Provided the form factors and characteristics are equivalent. Reference https://smithsystem.com/lines/cascade/
· For most dimension requirement would a + or – of 2 inches be accepted?
Answer: +2 inches may be difficult in some of the smaller classrooms. Within 2 inches or UNDER is safer to meet space requirements.
· Is this opportunity limited to buying American products, or can we offer comparable products that are non-TAA compliant?
Answer: Please refer to DFAR 252.225-7001 for definitions of terms used in DFAR 252.225-7000. DFARS 252.225-7001 defines what countries are Qualifying countries. Additionally, as stated om DFARS 252.225-7000 the evaluation procedures in DFARS 225.502(c) will be used.
· Items 2 & 3 on the item spreadsheet:
0. Please confirm the Basis of Design.
0. Please confirm the width of the coffee tables. Only Depth and Height are listed.
ANSWER: D is for Diameter; Height 16”, Diameter 30”. Any item labeled coffee table or side table will be circular with D for diameter.
· Item 38 on the item spreadsheet states 36” D, however, the designs show 30”, which would make more sense based on what these are being used for. Can you please confirm the depth should be 30” D?
ANSWER: D is for Diameter; Height-adjustable meeting table, Diameter 36”.
Please provide the basis of design for item 35 on the item spreadsheet. No options for a table to have full end panels, partial modesty panel, casters, and height adjustable capabilities.
ANSWER: These ones are not height adjustable
· For the (13) 3-person PODS, who will be responsible to connect those to building power?
ANSWER: The 3 person pods are specified with an electrical whip which will be hard wired into floor receptacles by CE electricians.
Atch 1 SOW and Atch 2 BOM do not seem to line up with product and quantities. Which should we follow for pricing format?
Answer: Attachment 1 SOW is the authority if there are any discrepancies between documents; BOM has been removed from the solicitation.
· Office 119: SOW specifies 30W. Drawing shows 36W. Which is preferred?
Answer: 36 wide bookshelf units by 60H. SOW paragraph 3.e has been updated to reflect 36W.
· Forensic 217: SOW specifies 36D. Drawing shows 30D. Which is preferred?
Answer: SOW 36”
· Power modules: Most come with 3 power/ 2 USB. Would adding under surface power module for additional outlets be acceptable?
Answer: Yes, under surface power module is acceptable. Above surface module to include 3 power receptacles and 2 USB charging ports, size A and C. Units are required to clamp onto back desk edge AND through a grommet hole.