Camera_support.pdf

PDF 88 KB Posted

Attached to
Base Wide CCTV - Phase 3-5 Federal contract opportunity
Solicitation number
FA700019RA002
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Camera Support supplement to RFI responses

View the file

Other files for this federal contract opportunity

Other files attached to Base Wide CCTV - Phase 3-5, newest first.
File Type Posted
Solicitation_Amendment_FA700019RA0020004_SF_30.pdf PDF
Attch_06_-_Wage_Determination_-_Building_10_May_2019.pdf PDF
Solicitation_Amendment_FA700019RA0020003_SF_30.pdf PDF
Attch_19_-_Phase_1a_1b_2_CCTV_RFI_as_of_25_Jan_18_reference_only.pdf PDF
Solicitation_Amendment_FA700019RA0020002_SF_30.pdf PDF
ROOF_WARRANTY_Mar._2019.xlsx XLSX spreadsheet
Attch_06_-_Wage_Determination_-_Building_22_February_2019.pdf PDF
Attch_18__-_SOW_Additions-Deletions_(Rev1),_Phases_3-5,_14_Mar_19.pdf PDF
Base_Wide_CCTV_RFI's_-_20_Mar_19.pdf PDF
Attch_1_CCTV_attendance_sheet.pdf PDF
Site_Visit_Minutes_FA7000-19-R-A002_Base_wide_CCTV_phase_3-5.pdf PDF
Attch_2_Email_to_Attendees.pdf PDF
Attch_18_-_SOW_Additions-Deletions,_Phases_3-5.pdf PDF
Attch_01_-_SOW_XQPZ150702L_CCTV_Phases_3-4-5,_Rev1.pdf PDF
Solicitation_Amendment_FA700019RA0020001_SF_30.pdf PDF
Attch_02_Cameras.xlsx XLSX spreadsheet
Attch_13_-_Bldg_2163_to_Prkg_&_Parade_Fld.pdf PDF
Attch_12_-_G002_Typical_All_Phases_Rev_1.pdf PDF
Attch_16_-_Experience_Form.docx DOCX document
Attch_04_-_Erosion_Control_Revegetation_and_Tree_Care_Standards_-_January_2019.pdf PDF
Attch_10_-_Drawings_150702L^Phase4.pdf PDF
Attch_07_-_Specifications_15-0702L.pdf PDF
Solicitation_-_FA700019RA002.pdf PDF
Attch_06_-_Wage_Determination_Building.pdf PDF
Attch_03_DVRs.xlsx XLSX spreadsheet
Attch_17_-_Financial_Reference.doc DOC document
Attch_09_-_Drawings_150702L^Phase3.pdf PDF
Attch_08_-_USAFA_Environmental_Standards_2018_Final.pdf PDF
Attch_11_-_Drawings_150702L^Phase5.pdf PDF
Attch_14_-_Utility_Locates_and_Legend.pdf PDF
Attch_15_-_HWSW_10_Jan_19.XLSX XLSX spreadsheet
Attch_01_-_SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAMERA SUPPORT

ROOF TOP ANCHORS-SIJAN HALL

6 CAMERA SUPPORT2M 360GALVANIZE E1ROOF A1/A5421

6 HSS2x2x1/42M 2 6 81 A500B E2

6 HSS2x2x1/4hss6 3 13/4 102A500B E3

6 FB1/2x12bsp2 1 0 123A36

6 FB1/4x6f13 0 8 20A36

12 FB1/4x2f4 0 6 10A36

12 FB1/4x1f7 1 11/2 11A36

6 RB1/2rb12 0 8 3A36

30 1/2 Dia A325N 0 31/2 9+1HD WASH

FIELD BOLTS

18 3/8 Dia EXP BLT 0 51/4

BILL OF MATERIAL

QTY PC LENGTH REMARKS WEIGHT LOCATION ERECTION DESIGN

SEQ TOTAL MK DESCRIPTION FT-IN GRADE TOTAL DRAWING REFERENCE

2- 61 / 2

SQ

CU

T

6 CAMERA SUPPORTS 2M

A

A

B B

C

C

2 2-113/4 1/4

3-2

1-21/2 51/4 1-4

31 / 2

11 / 2 CL

R

31/4 31/4

41 / 4 1 / 4

4 4

41/2 41/2

6 6

41 / 2 41 / 2

1/4 1 1 1/4

75/8

75 / 8

41 / 2

11 / 4 31 / 4

11 / 2 CL

R

(1 -H

SS

2x

2x 1 / 4 x2 -6

) 2 -1

1 / 2

3/16

3 SIDES

EA. END

.00

PC-07-17-2017

Section A-A 2M

1-FB1/4x6x0-8 f13

1-FB1/2x12x1-0 bsp2

Section B-B 2M

Section C-C 2M

1-FB1/4x2x6 f4

R= 3/4

TYP

1-RB1/2x8 rb12

(CTR'D)

1-FB1/4x1x1-11/2 f7

(NS&FS)

1-HSS2x2x1/4x3-13/4 hss6

1/2

9/16

File details come from the government source that posted it.