FA7000-17-R-0005-0003.pdf
PDF 101 KB Posted
- Attached to
- USAF Academy Planetarium Renovation Federal contract opportunity
- Solicitation number
- FA7000-17-R-0005
About this file
FA7000-17-R-0005-0003 - SF30 ***Note: Due to a technical issue, this amendment is denoted as 0003. It is the second amendment released for this solicitation -- no amendment 0002 has been released or is forthcoming***
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| XQPZ15-0112_RFI_Responses_(CORRECTED).pdf | ||
| 17-R-0005_RFI_Responses_-_26_Jan_17.pdf | ||
| Attch_1_-_SOW_Planetarium_Rev1_(24_Jan_17).pdf | ||
| Attch_2_-_Specs_Planetarium_Rev1_(24_Jan_17).pdf | ||
| Attch_7_-_Wage_Determination_Building_(rev_06_Jan_17).pdf | ||
| FA7000-17-R-0005-0001.pdf | ||
| 17-R-0005_Planetarium_-_SV_Sign_In_Sheet.pdf | ||
| 17-R-0005_Planetarium_-_Site_Visit_Slides.pdf | ||
| 17-R-0005_Planetarium_-_Site_Visit_Minutes.pdf | ||
| Attch_5_-_HAZMAT_Rpt_Planetarium.pdf | ||
| Attch_4_-_USAFA_Enviro_Standards.pdf | ||
| Attch_1_-_SOW_Planetarium.pdf | ||
| Attch_6_-_Geotech_Rpt_Planetarium.pdf | ||
| Sole_Source_J&A_XQPZ150112_Siemens.pdf | ||
| Attch_8_-_Planetarium_PPQ.docx | DOCX document | |
| Attch_2_-_Specs_Planetarium.pdf | ||
| Attch_7_-_Wage_Determination_Building_12-9-16.pdf | ||
| FA7000-17-R-0005.pdf | ||
| Sole_Source_J&A_XQPZ150112_Notifier.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XQPX 15-0112
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0002 is to:
A) Extend the deadline for receipt of proposals to 03 Feb 2017 at 2:00 PM.
B) Clarify the deadline for receipt of PPQs is the same as for receipt of proposals.
C) Incorporate revised attachments and supplements as follows: Attch 1 - SOW revision 1 (dated 24 Jan 2017), Attch 2 - Specs revision 1 (dated
24 Jan 2017), Attch 7 - Wage Determination (updated 06 Jan 2017), and Attch 9 - Drawings supplement (dated 24 Jan 2017).
D) All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA7000-17-R-0005
X 9B. DATED (SEE ITEM 11)
19-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2017
CODE
10 CONS - FA7000
SEARING, N.
8110 INDUSTRIAL DRIVE, STE 200
LGCB
USAF ACADEMY CO 80840-2315
FA7000 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA7000-17-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 01-Feb-2017 02:00 PM to 03-Feb-2017 02:00 PM.
The Issued By organization has changed from
10 CONS - FA7000
ANDERSON, ALISON 8110 INDUSTRIAL DRIVE, STE 2
USAF ACADEMY CO 80840-2315
to
10 CONS - FA7000
SEARING, N.
8110 INDUSTRIAL DRIVE, STE 200
LGCB
USAF ACADEMY CO 80840-2315
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Atch 1 - Planetarium
SOW
5 01-NOV-2016
Attachment 02 Atch 2 - Planetarium
Specifications
972 30-JUN-2016
Attachment 03 Atch 3 - Planetarium
Renovation Drawings
77 30-JUN-2016
Attachment 04 Atch 4 - USAFA
Environmental Standards
27 27-OCT-2015
Attachment 05 Atch 5 - Planetarium
Hazardous Materials
Report
52 09-MAR-2016
Attachment 06 Atch 6 - Planetarium
Geotechnical Report
34 04-MAR-2016
Attachment 07 Attch 7 - Wage
Determination Building
12-9-16
6 09-DEC-2016
Attachment 08 Atch 8 - PPQ 6 05-DEC-2016 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attch 1 - SOW
Planetarium Rev1 (24 Jan
17)
7 24-JAN-2017
FA7000-17-R-0005
Attachment 02 Attch 2 - Specs
Planetarium Rev1 (24 Jan
17)
1004 24-JAN-2017
Attachment 03 Atch 3 - Planetarium
Renovation Drawings
77 30-JUN-2016
Attachment 04 Atch 4 - USAFA
Environmental Standards
27 27-OCT-2015
Attachment 05 Atch 5 - Planetarium
Hazardous Materials
Report
52 09-MAR-2016
Attachment 06 Atch 6 - Planetarium
Geotechnical Report
34 04-MAR-2016
Attachment 07 Attch 7 - Wage
Determination Building
(rev 06 Jan 17)
6 06-JAN-2017
Attachment 08 Atch 8 - PPQ 6 05-DEC-2016
Attachment 09 Attch 9 - Planetarium
Drawings Supplement
(24 Jan 17)
10 24-JAN-2017
(End of Summary of Changes)
File details come from the government source that posted it. Updated .