This Statement of Work (SOW) details the restoration of a 7,004 sq ft maple athletic floor in a fitness center, dated 17 Sep 2025 with Amendment 6. The project includes two Contract Line Item Numbers (CLINs): CLIN 0001 is a firm-fixed-price screen, recoat, and line repaint process, while CLIN 0002 is an optional deep sanding and refinishing service. The primary objectives are to restore the floor's performance and appearance using oil-modified high-solids polyurethane and MFMA-approved line-marking materials, complying with DoD and Air Force standards.
Specific technical requirements include machine-screening the floor, applying 1-2 coats of polyurethane with 2.5-3 mil dry film thickness, repainting sport court lines, and maintaining specific environmental conditions (65-75°F, RH ≤ 50%). The optional CLIN 0002 involves removing all existing finish layers, repairing floor damage, and adding a USAF fitness test line. The contractor must provide product data, safety documentation, and warranties, with performance standards including shock absorption ≥ 35%, ball bounce ≥ 90%, and specific surface friction requirements. The project carries a one-year workmanship warranty and must meet multiple federal and athletic flooring standards.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Wood Floor Fitness Center
17 Sep 2025
Amendment 6
1.0 Project Overview
1.1 Title: Screen, Recoat & Repaint Lines of Existing Maple Floor System
1.2 Facility Area: 7,004 sq ft
1.3 Objective: Restore performance and appearance of the existing maple athletic floor through a screen-and-recoat process using oil-modified high-solids polyurethane, then accurately repaint court lines with MFMA-approved materials in compliance with DoD UFC 4-740-02, AFMAN 32-1084, UFC 1-200-01, and MFMA PUR Standards.
2.0 Contract Line Item Numbers (CLINs)
2.1 CLIN 0001 – Screen, Recoat & Repaint Lines – Firm-Fixed-Price
2.2 CLIN 0002 – Optional Resurface (Deep Sanding & Refinish) – Awarded at time of contract if funding is available
3.0 Scope of Work
3.1 CLIN 0001 – Screen, Recoat
3.1.1 Machine-screen entire floor surface to remove only the existing topcoat and promote adhesion of new finish (100–120-grit non-woven pads; 175–220 RPM orbital buffer)
3.1.2 Apply one to two full coats of oil-modified high-solids polyurethane (VOC ≤ 350 g/L), targeting 2.5–3 mil dry film thickness per coat leaving lines intact.
3.1.3 After final coat cures ≥ 24 hr, accurately repaint all sport court lines (basketball, volleyball, multi-use) using MFMA-approved one-component acrylic paint (VOC ≤ 250 g/L)
3.1.4 Maintain ambient conditions: 65–75 °F and RH ≤ 50%
3.1.5 Provide product data, SDS, MFMA test certificates, line-striping layout, and tape/application statements
3.2 CLIN 0002 – Optional Resurface (Deep Sanding & Refinish)
3.2.1 Remove all existing finish layers to bare maple using drum sander (60–80-grit belts) without exposing or damaging wood
3.2.2 Repair loose or damaged boards, cracks, and gouges; fill and level substrate to a uniform condition
3.2.3 Machine-screen lightly (220-grit pad) to refine profile after repairs
3.2.4 Paint Lines to specifications of existing basketball and volleyball. Add a line for USAF fitness test.
3.2.5 Apply two full coats of the same oil-modified high-solids polyurethane finish as CLIN
4.0 Preparation and Protection
4.1 Verify environmental conditions: maintain 55–75 °F and 35–50 % RH; test slab moisture per
ASTM F2170 (RH ≤ 75 %)
4.2 Mask all floor plates, inserts, fixed equipment, walls, base moldings, and adjacent surfaces with low-tack tape and poly film (min 6 mil)
4.3 Coordinate work hours and access restrictions with facility manager
5.0 Cleaning and Surface Preparation
5.1 Vacuum entire floor with HEPA-filtered unit to remove dust and debris
5.2 Tack-clean with manufacturer-approved, low-VOC solution to eliminate fine particulates
5.3 Verify surface is clean, dry, and free of waxes, oils, adhesives, or other contaminants
6.0 Mechanical Screening
6.1 CLIN 0001: Screen only existing topcoat with 100–120-grit non-woven pads on 175–220 RPM orbital buffer
6.2 CLIN 0002: Deep sand with drum sander (60–80-grit) then refine with 220-grit pad
6.3 Ensure uniform abrasion without overcutting or exposing raw wood beyond specification
7.0 Finish Application
7.1 Materials: MFMA-approved oil-modified high-solids polyurethane; VOC ≤ 350 g/L
7.2 Two coats applied by roller or spray; maintain 4–6 hr dry time between coats with ventilation
7.3 Performance per MFMA PUR Standards:
7.3.1 Shock absorption ≥ 35 %
7.3.2 Vertical deflection 0.23–0.36 in at 250 lb point load
7.3.3 Ball bounce ≥ 90 % rebound
7.3.4 Surface friction (ASTM D2047) static coefficient 0.50–0.80
7.4 Environmental compliance: U.S. EPA VOC rules; DoD indoor air quality; local hazardous-material regulations
7.5 Submit SDS for each product and containment/disposal plans
8.0 Line Repainting (CLIN 0001)
8.1 Layout & Verification: deliver scaled diagram; confirm dimensions per UFC 4-740-02 § 2-4
8.2 Paint: one-component acrylic, low-VOC (≤ 250 g/L); color per facility standard
8.3 Masking: use low-tack, UV-resistant line tape (3M 233+ or equivalent)
8.4 Application: two coats brush/roller or fine spray; target wet film thickness 2–3 mil each
8.5 Tolerances: line width ± 1/8 in; straightness max deviation 1/4 in per 50 ft; sharp edges, no bleed
8.6 Submit striping layout, paint SDS, and application method statement
9.0 Compliance and Standards
9.1 UFC 4-740-02: Indoor fitness center design and court layouts
9.2 AFMAN 32-1084: Category Group 45 Recreation and Wellness Spaces
9.3 UFC 1-200-01: General building materials and indoor finishes
9.4 MFMA PUR Standards: Athletic performance, finish durability, and line-marking criteria
9.5 FAR Subpart 11.002: Performance-based acquisition guidelines
10.0 Testing, Inspection & Acceptance
10.1 Performance tests per MFMA: shock absorption, deflection, ball bounce, slip resistance
10.2 Line inspection: measure width, straightness, color uniformity, edge quality
10.3 Joint inspection with facility manager; correct deficiencies at no cost
10.4 Submit final inspection report, one-year warranty documents, and maintenance schedule
11.0 Warranty
11.1 Contractor shall warrant all workmanship and materials for one year from acceptance
11.2 Finish and line paints carry manufacturer’s standard warranties covering adhesion, wear, and color retention
| 1.0 Project Overview |
| 2.0 Contract Line Item Numbers (CLINs) |
| 3.0 Scope of Work |
| 3.1 CLIN 0001 – Screen, Recoat |
| 3.2 CLIN 0002 – Optional Resurface (Deep Sanding & Refinish) |
| 4.0 Preparation and Protection |
| 5.0 Cleaning and Surface Preparation |
| 6.0 Mechanical Screening |
| 7.0 Finish Application |
| 8.0 Line Repainting (CLIN 0001) |
| 9.0 Compliance and Standards |
| 10.0 Testing, Inspection & Acceptance |
| 11.0 Warranty |