JA-11_01560_Dobbins_Environmental_Requirements.pdf
PDF 286 KB Posted
- Attached to
- Base SABER contract Federal contract opportunity
- Solicitation number
- FA6703-17-R-0006
About this file
JA-11, 01560 Dobbins Environmental Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA6703-17-R-0006_Amend_0002.pdf | ||
| FA6703_17_R_0006_Site_visit_responses.pdf | ||
| FA6703-17-R-0006_Amend_0001.pdf | ||
| Site_visit_sign_in_7_Sep_2017.pdf | ||
| JA-4_Past_Performance_Worksheet.pdf | ||
| JA-13_01300_Submittals_.pdf | ||
| JA-3_PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE[1].pdf | ||
| JA-5_WD_GA170079_14_Apr_17_GA79.pdf | ||
| JA-6_WD_GA170134_28_Apr_17_134.pdf | ||
| JA-14_Seed_Project_Bldg_935_SOW.pdf | ||
| JA-1_Statement_of_Work.pdf | ||
| JA-9_DARB_4.pdf | ||
| JA-2_Financial.pdf | ||
| JA-10_DARB3.pdf | ||
| JA-8_Consent.pdf | ||
| FA6703-17-R-0006,_Simplified_Acquisition_Base_Engineering_Requirements_Solicitation.pdf | ||
| JA-7_WD_GA170246_6_Jan__17_246.pdf | ||
| JA-12_01010_General_Requirements.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01560 Page 1
SECTION 01560
DOBBINS ARB ENVIRONMENTAL REQUIREMENTS
PART 1 GENERAL
This Section describes the requirements placed upon the Contractor necessary for the prevention of environmental pollution or damage on Dobbins Air Reserve Base (DARB), and to enable
DARB to meet environmental compliance, reporting and tracking requirements set forth in local, State, and Federal laws, rules, and guidance documents due to work performed by the Contractor during the execution of this project.
1.1 COMPLIANCE WITH ENVIRONMENTAL REGULATIONS
The Contractor and his subcontractors shall comply with all applicable Federal, State, and local laws and regulations concerning environmental permitting, tracking, pollution control and protection, as well as the specific requirements stated elsewhere in the contract specifications.
1.2 SUBMITTALS
Submittal requirement details for each project are listed in an accompanying AF Form 66 identified for this specification section 01560, as well as in each respective subsection. The following submittals are always required:
1.2.1 Facility Info 3.2.2.1
1.2.2 Weight Receipts 3.2.2.2
1.2.3 Hazardous Material information 3.3.2
1.3 ENVIRONMENTAL PERMITS AND CERTIFICATIONS
The Contractor is responsible for obtaining and holding current all applicable environmental permits and certifications necessary to accomplish all work. Requirements for specific permits and certifications are included in subsequent subsections when applicable.
1.4 ENVIRONMENTAL FINES AND PENALTIES
The Contractor agrees to indemnify the Government, its officers, agents, and employees against liability and costs associated with the intentional or negligent noncompliance of environmental laws, regulations, or requirements by the Contractor, its officers, agents, employees, or subcontractors to the extent such noncompliance arises out of the manufacture or delivery of supplies, services or construction by or for the account of the Government. The Contractor shall reimburse the Government for any fines and monetary penalties assessed by State or
Government agencies against Dobbins Air Reserve Base due to intentional or negligent noncompliance with environmental laws, regulations, or requirements by the Contractor. The
Contractor shall be responsible for making corrections necessary to comply with any environmental laws, regulations or requirements.
1054949371C Typewritten Text
FA6703-17-R-0006
1054949371C Typewritten Text Attachment JA-11
Section 01560 Page 2
1.5 REGULATORY INSPECTIONS
The Contractor shall immediately notify the Contracting Officer when contacted by a Federal, state or local environmental regulatory inspector(s). The Contractor cannot represent the
Government during an inspection. The Contracting Officer, or designated government representative, will be responsible for meeting and escorting the inspector(s) at the job site.
1.6 DEFINITIONS
1.6.1 Hazardous Material (Hazmat): Any substance defined by OSHA as a hazardous substance requiring a Material Safety Data Sheet (MSDS), including, but not limited to any chemicals, curing agents, joint sealers, ready-mix concrete, grout, paints, adhesives, sealing compounds, strippers, glues, petroleum products, natural or synthetic gases, pesticides, all aerosols, and all materials containing hazardous substances.
1.6.2 Solid Waste: Any material, liquid, gaseous or solid, that is deemed as waste by the generator because it is no longer needed, is excess, has exceeded its shelf life, is spill residue, has been abandoned, or is no longer usable for its intended purpose. Solid waste includes, but is not limited to: used or spilled chemicals; contaminated clothing and personal protective equipment
(e.g. mask filters, gloves, coveralls); contaminated wipes, rags and other equipment; empty containers; garbage; packaging; construction and demolition debris; refuse; recyclable materials;
and all other discarded materials that are generated during construction, residential, and commercial activities.
1.6.3 Hazardous Waste: Any solid waste that meets the Title 40 Code of Federal Regulations
(CFR) Part 261 criteria for characterization as hazardous waste (reference 40 CFR 261). Solid waste which is expected to exhibit any hazardous waste characteristics, or is a listed hazardous waste, based upon the information provided on the Material Safety Data Sheets (MSDS) by the contractor per Section 3.2 of this specification for the original materials, is hazardous waste.
Flashpoint, corrosivity, and constituents on the MSDS are used by the government to determine potential for solid wastes to be hazardous wastes.
1.6.4 Universal Waste: Any hazardous waste that are subject to the universal waste requirements found in Title 40 Code of Federal Regulations (CFR) Part 273 to include used batteries, pesticides, mercury-containing equipment, and lamps.
1.6.5 Empty containers of hazmat must meet the 40 CFR regulatory definition of “empty” to be considered empty (reference 40 CFR 261.7(b) and allowed to be disposed of in a rolloff as non-hazardous solid waste).
PART 2 PRODUCTS (NOT APPLICABLE)
Section 01560 Page 3
PART 3 EXECUTION
3.1 GENERAL ENVIRONMENTAL REQUIREMENTS
3.1.1 Prohibition against Open Burning. The Contractor is prohibited from open burning on
Dobbins Air Reserve Base.
3.1.2 Historical and Archeological Findings. If the Contractor believes he or she has discovered any item or area of historical or archaeological interest not specified in the contract during the completing of work, the Contractor shall leave the area undisturbed and immediately report the finding to the Contracting Officer.
3.1.3 Diversion of Construction and Demolition debris from Landfill. At least 50% of all construction and demolition debris (C&D) shall be recycled either onsite (within the project) or at an appropriate off base recycling facility. Recyclable C&D debris is prohibited from being landfilled. Recyclable C&D includes, but is not limited to: asphalt, concrete, scrap metal, metal piping, metal fixtures, lumber, ceiling tiles, gypsum, carpeting, fluorescent lamps, batteries, cardboard, paper, and fiberboard. Requirements are detailed in Sections 3.2 and 3.10 of this specification.
3.1.4 Protection Against Sediment Runoff. Any project that disturbs the soil will require protection of the surrounding land against sediment runoff. Requirements are detailed in Section
3.4 of this specification. Any excavated soils must be disposed of at an off base state permitted landfill. Disposal or reuse on base is prohibited, unless otherwise provided in writing by the
Contracting Officer.
3.1.5 Unanticipated Materials of Concern
3.1.5.1 Asbestos Containing Material (ACM): If the Contractor discovers ACM not specified in the contract during the execution of work, the Contractor shall stop work on the site immediately and notify the Contracting Officer. The Contractor shall not be permitted to install or use any ACM on Dobbins ARB.
3.1.5.2 Lead-Based Paint (LBP): If the Contractor discovers LBP not specified in the contract during the execution of work, the Contractor shall stop work on the site immediately and notify the Contracting Officer. The Contractor shall not be permitted to install or use lead-based paint for any work on Dobbins ARB.
3.1.5.3 Polychlorinated Biphenyls (PCBs): If the Contractor discovers a PCB containing item not specified in the contract during the execution of work, the Contractor shall stop work on the site immediately and notify the Contracting Officer. The Contractor shall not use nor install any equipment containing PCBs on Dobbins ARB.
Section 01560 Page 4
3.2 SOLID WASTE MANAGEMENT
The Contractor is authorized to generate or dispose of solid waste under the scope of this contract in accordance with the requirements of this section. Solid waste, in this section, refers to any non-hazardous waste, any municipal waste, any construction and demolition debris, and any recyclable materials generated by the Contractor while performing the work under this contract. Excess clean soil free of solid waste, and routine personal waste (food and drink containers that are carried off-base at the end of the work day), are excluded from this definition.
3.2.1 References
3.2.1.1 Georgia Department of Natural Resources Environmental Protection Division, Chapter 391-3-4, Solid Waste Management
3.2.2 Submittals
3.2.2.1 Landfill and Recycling Facility Information. The Contractor shall submit a document which lists the name(s), address(es), phone number(s) and point(s) of contact for each landfill or recycling facility intended to be used for the disposal and/or recycling of solid wastes generated by the Contractor during the course of this contract. This document must be approved by the Contracting Officer prior to beginning any work resulting in the generation of any solid waste or recyclables.
3.2.2.2 Weight Receipts for solid waste disposed and materials recycled. These are legible documents provided to the Contractor by the recycling and/or disposal facility which indicate:
the date of service (drop off); the type of the waste dropped off, and the weight of the waste (in pounds or tons). Weight Receipts shall be submitted for approval within 5 days of the service date.
3.2.3 The Contractor shall only use state-permitted solid waste landfills and recycling facilities for all solid waste generated on Dobbins ARB.
3.2.4 Construction And Demolition Debris
3.2.4.1 All recyclable construction and demolition debris (C&D) shall be recycled either onsite or at a C&D recycling facility. Recyclable C&D debris is prohibited from being landfilled. Recyclable C&D includes, but is not limited to: asphalt, concrete, scrap metal, metal piping, metal fixtures, lumber, ceiling tiles, gypsum, carpeting, cardboard, paper and fiberboard.
3.2.4.2 Non-recyclable C&D shall be disposed of at a state permitted landfill that is permitted for, and is currently accepting, C&D waste.
3.2.4.3 The Contractor shall segregate recyclable C&D from non-recyclable C&D, in accordance with the recycling facility requirements. Small quantities of some scrap metals may
Section 01560 Page 5 be recycled at the base Recycling Center, Building 560, upon Contractor request and approval from the Contracting Officer.
3.2.4.4 The Contractor shall collect all cardboard, fiberboard and standard wooden pallets generated by any Contractor shipping and packaging activities (e.g. receipt of furniture, receipt of shipments of hazmats, etc.) in order to recycle them.
3.2.4.5 Any materials approved by the Contracting Officer to be recycled at the base Recycling
Center which are taken to this facility do not require weight receipts to be submitted (ref.
submittal 3.2.2.2).
3.2.5 Collection And Storage Of Recyclable C&D and Solid Wastes
3.2.5.1 The Contractor shall provide all appropriate containers, bags, liners, trays, rolloffs and other equipment required for the proper collection of solid wastes and recyclable C&D. The
Contractor shall not use any base dumpsters or other base trash receptacles for collecting or storing solid waste.
3.2.5.2 All solid wastes shall be reclaimed, recycled or disposed of prior to completion of work under this project.
3.2.5.3 The Contractor shall not generate any waste as a result of cleaning Contractor tools, vehicles, containers or other equipment on base. Cleaning of Contractor tools, vehicles, containers or other equipment on base is prohibited.
3.2.6 Excavated Soils. Any excavated soils must be disposed of at an off base state permitted landfill.
3.3 HAZARDOUS MATERIALS (Hazmat) MANAGEMENT
The Contractor is authorized to use hazardous materials under the scope of this contract in accordance with this section. Hazardous Material (Hazmat) is any hazardous substance required by the Occupation Safety and Health Administration (OSHA) to have a manufacturer’s Material
Safety Data Sheet (this does not include OSHA “articles” such as tape, fabric, batteries, mesh, mechanical fasteners, etc.) .
3.3.1 References
3.3.1.1 Air Force Instruction 32-7086, Hazardous Materials Management, 1 Nov 2005
3.3.1.2 Base Instruction 94I32-7086, February 2014
3.3.2 Submittals
3.3.2.1 Contractor's Hazmat Storage Location Sketch
3.3.2.2 Material Information Sheet (MIS)
3.3.2.3 Material Safety Data Sheets (MSDSs)/ Safety Data Sheets (SDSs)
Section 01560 Page 6
3.3.2.4 Substantiating Documentation for Use of Prohibited Hazmat
3.3.2.5 Product Data Sheets (PDSs)
3.3.3 EPCRA Compliance. Reference FAR 52.223-5: The Contractor needs to provide all information needed by Dobbins ARB to comply with EPCRA. Contractor shall provide the following submittals for government approval:
3.3.3.1 Contractor’s Hazmat Storage Location Sketch (ref. submittal 3.3.2.1), a document which identifies exactly where Hazmats are intended to be stored on base when not in use;
3.3.3.2 Material Information Sheet (MIS) (ref. submittal 3.3.2.2), document completed and submitted by the Contractor which lists individual specific Hazmat, intended to be used by the
Contractor under the scope of the project, detailing data needed, including: container type, container size, estimated quantity to be used, and application method. No Hazmat material reviews will be completed by the government without this document and accompanying
MSDSs/MDSs.
3.3.3.3 Material Safety Data Sheet (MSDS)/ Material Data Sheets (MDSs) (ref. submittal
3.3.2.3), a manufacturer’s material document which describes the physical and chemical characteristics of a hazmat, to be submitted by the Contractor for each and every different
Hazmat listed on the MIS, submitted concurrently with the MIS. MSDSs/MDSs shall be obtained directly from the manufacturer and shall be current.
3.3.3.4 Substantiating documentation (ref. submittal 3.3.2.4) includes documents which justify the use of prohibited Hazmats and/or prohibited chemicals constituents. Substantiating documentation shall be submitted concurrently with the MIS and MSDSs when a prohibited
Hazmat or chemical constituent is requested for use by the Contractor on Dobbins ARB.
Documents must identify which specific engineering criteria or specification will NOT be met unless the prohibited Hazmat or chemical constituent is used, and shall contain the statement that alternate commercially available products are not available which will meet the specific engineering criteria or specification. Prohibited Hazmats or chemical constituents will not be authorized for use on Dobbins without substantiating documentation. Prohibited hazmats and chemical constituents prohibited from use on Dobbins include, but are not limited to: EPA-17 listed chemicals (i.e. methyl ethyl ketone, xylene, toluene, methylene chloride, et al); Class I
Ozone Depleting Substances (i.e. Freon 12, 1,1,1-trichloroethane, et al) ; heavy metals (i.e. lead, barium, silver, nickel, chromium, cadmium, et al); carcinogenic constituents; cyanide and cyanide compounds, phosphate compounds, SARA Title III Extremely Hazardous Substances, and SARA Title III 313 Hazardous Substances.
3.3.3.4.1 No prohibited Hazmat or chemical constituent will be approved for use in excess of
3000 pounds cumulatively over the entire contract period.
3.3.3.4.2 No prohibited Hazmat or chemical constituent will be approved for use that will generate hazardous waste by nature of its use, unless the Contractor is authorized to generate hazardous waste in accordance with paragraph 3.7 of this section 01560.
Section 01560 Page 7
3.3.3.4.3 No Class I Ozone Depleting Substance will be authorized for purchase or reimbursement under any circumstances. All Class I Ozone Depleting Substances identified as necessary by engineering to meet an engineering criteria or specification must be obtained through the Defense Reserve with SAF authorization and approval.
3.3.3.5 Product Data Sheet (PDS) (ref. submittal 3.3.2.5), a document provided by the manufacturer of a hazmat that provides detailed usage information about the hazmat including usage conditions and proper application methods. The Contractor shall submit a PDS for each
Hazmat listed on the MIS concurrently with the MIS.
3.3.4 Limited overnight storage of any single Hazmat on base (less than 5,000 pounds) will be authorized in accordance with any storage conditions provided by the Government during hazmat approval review.
3.3.5 Use of approved and authorized Hazmats are restricted to the methods of application and quantities identified on the corresponding MIS; if quantities needed exceed the estimates provided on the MIS, the Contractor must identify the additional quantity needed to the project inspector as soon as the need is identified. Additional quantities are authorized as long as no cumulative quantity limitations (reference 3.3.3.4.1 and 3.3.4 above) are exceeded.
3.3.6 The Contractor will implement the following Best Management Practices (BMPs) to prevent spills and other releases to the environment, and to meet NFPA, OSHA, and RCRA requirements, including but not limited to: providing covered storage of Hazmats, providing appropriate storage for flammable materials, providing impervious underlayment (e.g. tarps) where Hazmats are being used on grassed areas, keeping lids of containers closed at all times, etc.:
3.3.6.1 The Contractor shall store all Hazmat only in the designated Hazmat storage area approved by the Contracting Officer, per submittal 3.3.2.1.
3.3.6.2 The Contractor shall provide secondary containment for all Hazmat being stored on base. Secondary containment shall be chemically inert to the Hazmat being stored and impervious to absorption of the Hazmat (spilled, dripped or leaked). The secondary containment volume shall not be less than 10% of the total quantity being stored or the equal quantity of the largest container being stored, whichever is greater in volume. Separate secondary containment shall be provided for incompatible Hazmats, such as acids and bases, flammables and corrosives, flammables and oxidizers, etc.
3.3.6.3 The preservation of the landscape shall be an imperative consideration in the selection of all sites. No activity shall be conducted or storage permitted within the dripline of any tree without being depicted on the drawings and being approved by the Contracting Officer.
3.3.6.4 The Contractor shall be responsible for the cleanup and disposal of all spilled
Hazmats, including any spilled, leaking or dripping hydraulic fluid and other fluids from equipment and vehicles.
Section 01560 Page 8
3.3.6.4.1 Spills have no size limit; any amount spilled shall be cleaned up by the
Contractor. The Contractor shall provide all materials use to contain and absorb any spill, and shall provide appropriate and proper containers into which the spill debris shall be placed. Spill absorbents used shall be picked up immediately and placed in the disposal container.
3.3.6.4.2 Disposal of spilled wastes generated from spill cleanup shall be the Contractor’s responsibility and shall meet all federal, state and other regulations regarding storage, shipment and disposal.
3.3.6.5 The Contractor shall use NFPA and OSHA required or specified flammable material and corrosive material storage lockers for the storage of all Hazmats.
3.3.6.6 The Contractor shall segregate incompatible materials at all times in his or her field office, storage, staging and work areas.
3.3.6.7 The Contractor shall use protective measures, such as drop cloths and tarpaulins, when using Hazmats, in order to keep the work and storage areas free from drips and spills and to protect unimproved surfaces from environmental contamination.
3.3.6.8 The Contractor shall keep all containers closed at all times when not in use. At any time when a hazmat is finished being used for the day, the hazmat container shall be returned to the designated storage area.
3.3.6.9 The Contractor shall not store Hazmat outdoors where it may be exposed to sun, rain, wind or other elements and precipitation. The Contractor shall follow all manufacturers’ recommendations for storage of Hazmat, according to the PDS.
3.3.6.10 The Contractor shall ensure that Hazmats are never poured out onto grass or soil, and are never drained to or dispose of on the ground, in a water way or via the storm sewer system.
Mixtures of water and/or Hazmats shall never be dumped onto the ground.
3.3.6.11 The Contractor shall ensure that all employees are given proper training in the use and storage of the Hazmats onsite, and in the use of any personal protective equipment necessary for the proper use of Hazmat on Dobbins ARB.
3.3.7 The Contractor shall not generate any waste as a result of cleaning any Contractor tools, vehicles, containers or other equipment on base; cleaning of Contractor equipment on base is prohibited unless otherwise permitted by the Contracting Officer. The Contractor shall plan for this in determining which Hazmats to use for specific tasks.
3.4 STORM WATER POLLUTION PREVENTION
The Contractor is authorized to perform land disturbing activities and exterior facility work under the scope of this project. The project does not require coverage under Georgia National
Pollutant Discharge Elimination Standard (NPDES) general permit for construction activity
GAR100001.
Section 01560 Page 9
3.4.1 References
3.4.1.1 GA Rule 391-3-03k: Water Quality Standards
3.4.1.2 GA Rule 391-3-7: Erosion and Sedimentation Control
3.4.1.3 Cobb County, Article VIII: Soil Erosion and Sedimentation Control
3.4.1.4 Erosion Control Manual: Manual for Erosion and Sediment Control in Georgia
(4th Edition 1996, or Current)
3.4.1.5 Storm Water P2 Plan: Dobbins ARB Storm Water Pollution Prevention Plan
(September 2005 or Current)
3.4.2 Submittals
3.4.2.1 Storm Water Erosion, Sedimentation, and Pollution Control Plan
3.4.3 Erosion, Sedimentation, And Pollution Control Plan Requirements
3.4.3.1 The Contractor shall submit a project specific Erosion, Sedimentation, and Pollution
Control Plan (ESPCP) (Submittal 3.4.2.1) for government review and approval prior to the start of work. The Contractor is prohibited from beginning land disturbing activities until the ESPCP has been approved by the Contracting Officer.
3.4.3.2 The Project Specific ESPCP shall include the following:
3.4.3.2.1 Base Project Information (Project Name, Project Number, Contact Information, Project Engineer, Project Inspector);
3.4.3.2.2 Contractor Information (Contractor Name, Contact Information, Supervisor
Name, Supervisor Contact Info.);
3.4.3.2.3 Project Disturbed Area (acres);
3.4.3.2.4 Erosion & Sedimentation Control Plan (1/2 Scale Project Drawings). If the project drawings do not include Erosion and Sedimentation Control Plans, the Contractor is responsible for generating a plan in accordance with Cobb County and State of Georgia
Requirements;
3.4.3.2.5 Erosion and Sedimentation Control Maintenance Procedures;
3.4.3.2.6 Best Management Practices for Storm Water Pollution Prevention;
3.4.4 Dobbins Storm Water Protection Requirements
3.4.4.1 No fuels, oils, acids, wastes, or other materials shall be permitted to enter these water resources directly or through storm drain inlets in accordance with Georgia Rule 391-3-03k
Water Quality Standards.
Section 01560 Page 10
3.4.4.2 The Contractor is prohibited from pouring ANY material down a storm drain.
Exceptions to this requirement may be granted by the Contracting Officer after a written request for the discharge is approved by the government and is consistent with permit requirements.
3.4.4.3 If the Contractor believes he/she has encountered federally protected floodplains or wetlands not specified in the contract during the execution of work, the Contractor shall stop work on the site immediately and notify the Contracting Officer.
3.4.4.4 The Contractor is responsible for obtaining all necessary and appropriate waivers and/or permits for land disturbing activities occurring within seventy-five (75) feet of designated
Waters of the State of Georgia and/or Waters of the United States or that involve stream bed or bank disturbance. Designated Waters of the State and/or United States present on Dobbins ARB include Rottenwood Creek, Poorhouse Creek, and their respective tributaries.
3.5 PETROLEUM OIL AND LUBRICANT (POL) USE AND MANAGEMENT
The Contractor is permitted to: fill vehicles or equipment on Dobbins with fuel; add oil or lubricant to vehicles or equipment; and to store and use gasoline, diesel, oil or hydraulic fluid under the scope of this project.
3.5.1 References
3.5.1.1 Dobbins HAZMAT Plan: Dobbins Air Reserve Base Hazardous Materials
Emergency Response (HAZMAT) Plan (December 2003 or Current)
3.5.2 Hazardous Material Requirements. The Contractor is required to follow hazardous material requirements outlined in Paragraph 3.3 in addition to POL requirements outlined in this subsection for the following POL products:
3.5.2.1 Gasoline
3.5.2.2 Diesel
3.5.3 Storage
3.5.3.1 The Contractor shall not store any quantity of fuel or other petroleum products in tanks or bladders larger than 5 gallons without government approval.
3.5.3.2 The Contractor shall provide and use secondary containment for storage of fuel and other petroleum products. Material used in the establishment of secondary containment shall be inert and impervious to the material being stored. Secondary containment shall be able to contain at least the contents of the largest container for which it is employed plus ten percent.
Separate containment shall be provided for incompatible materials. If the tank and secondary containment are exposed to rainfall, the following additional requirements apply:
3.5.3.2.1 Sufficient freeboard shall be incorporated to ensure the containment will hold the complete contents of the tank plus ten percent plus 6" of rainfall.
Section 01560 Page 11
3.5.3.2.2 Storm water drained off the secondary containment must be inspected and monitored before draining out of the containment. If POL is present, the water must be disposed of as petroleum contact water and cannot be discharged to the environment.
3.5.3.2.3 Inspection and draining of any accumulated water shall be conducted at least once a week or after rain fall events.
3.5.4 Transfer Operations. In all transfer activities, the Contractor shall maintain segregation of incompatible materials.
3.5.5 Vehicle Capacity. The Contractor is prohibited from using any vehicle for the transportation of fuel or other POL products on Dobbins ARB with a total tank capacity of greater than 2,000 gallons per storage compartment.
3.5.6 Spill Control and Cleanup. The Contractor shall be responsible for the cleanup and disposal of all spilled POL products, including all materials use to contain and absorb the spill.
The Contractor shall maintain a stock of spill cleanup material, e.g. absorbent material, on hand at all locations where fuel or petroleum products are stored and transferred. The Contractor's stock of spill cleanup materials shall be adequate to clean up the total amount of products being stored by the Contractor or the total amount being transferred by the Contractor. Spills of POL products shall be managed in accordance with the current HAZMAT Plan for Dobbins ARB.
Disposal of wastes generated from spill cleanup shall be the contractor’s responsibility and be in accordance with this section.
3.6 LANDSCAPE PROTECTION
The Contractor is prohibited from performing exterior work that can harm or threaten trees, shrubs, grass, and landscaping on Dobbins. The Contractor is prohibited from driving on any surface other than paved or graveled roads on Dobbins ARB. If the project requires exterior work, the Contractor shall immediately notify the Contracting Officer.
3.7 HAZARDOUS WASTE MANAGEMENT
The Contractor is prohibited from generating or disposing of any Hazardous Waste under the scope of this contract. If the Contractor generates hazardous waste not authorized under the scope of this contract, the Contracting Officer shall be notified immediately. The Contractor is responsible for management and disposal of such waste in accordance with federal, state, local, and base requirements.
3.8 PESTICIDES
Use of pesticides under the scope of this project is authorized provided the Contractor complies with requirements outlined within this paragraph.
3.8.1 References
Section 01560 Page 12
3.8.1.1 Armed Forces Pest Management Board (AFPMB) Standard Pesticides List (11 February 2015)
3.8.2 Submittals
3.8.2.1 Pesticide Applicator Certification
3.8.2.2 Pesticide Usage Report
3.8.3 Approval. All pesticides, herbicides, insecticides, and rodenticides are hazardous materials. Therefore all requirements concerning Hazardous Material (HAZMAT) review and approval outlined in Paragraph 3.3 of this section apply to pesticides to be used on this project in addition to requirements of Paragraph 3.8. Additionally, a copy of pesticide labels to be used under the scope of this project shall be included with HAZMAT Submittals 3.3.2.2, 3.3.2.3 and
3.3.2.5.
3.8.4 Applicator Certification. Application of all pesticides shall be accomplished by certified pest control personnel or under the supervision of a State of Georgia certified pest control operator. The Contractor shall submit personnel certification (Submittal 3.8.2.1) with HAZMAT
Submittals 3.3.2.1 and 3.3.2.2. Applicator Certifications shall be valid, as a minimum, through to the completion of any applications to be accomplished under this contract.
3.8.5 Usage Report. The Contractor shall submit a usage report (Submittal 3.8.2.2) no later than seven (7) days after pest control applications are completed for the project. The usage report shall include, as a minimum:
3.8.5.1 Name, address, and phone number of Contractor;
3.8.5.2 Name of the applicator;
3.8.5.3 Building, facility, or area treated;
3.8.5.4 Target pest(s) to be controlled;
3.8.5.5 Pesticide Name and EPA Number;
3.8.5.6 Active Ingredient Applied in pounds;
3.8.5.7 Date of the application.
3.8.6 Disposal. The Contractor is prohibited from disposing of excess pesticides on Dobbins
ARB in base dumpsters or down sanitary, industrial, or storm drains. The Contractor is responsible for disposing of pesticides and pesticide waste in accordance with paragraphs 3.2 and
3.7 of this section. Excess pesticides may be applied on Dobbins ARB if a written request is submitted by the Contractor and is approved by the Contracting Officer.
3.9 RADIOACTIVE MATERIAL (RAM)
The Contractor is prohibited from disturbing any radioactive materials or using equipment or tools containing radioactive sources. This includes, but is not limited to: ionizing radiation emitters, non-ionizing radiation emitters, and lasers. Permission and instruction for use of such
Section 01560 Page 13 equipment must be obtained prior to beginning work from the Radiation Officer located in the
Bioenvironmental Engineering office, Building 550.
3.10 UNIVERSAL WASTES
The disturbing, removing, replacing, and/or disposal of fluorescent or High Intensity Discharge
(HID) lamps, ballasts, mercury-containing materials (e.g. thermostats, switches, etc.) or batteries of any kind is authorized under the scope of this project provided the Contractor complies with all requirements outlined within this section.
3.10.1 References:
3.10.1.1 Georgia Environmental Protection Division Rule 391-3-11-18: Standards for
Universal Waste Management
3.10.1.2 Title 40 Code of Federal Regulations (CFR) Part 273 (40 CR 273)
3.10.2 Submittals
3.10.2.1 Universal Waste Tracking Log
3.10.2.2 Recycler and Transporter Information
3.10.2.3 Universal Waste Shipping Manifest
3.10.3 Batteries
3.10.3.1 Any batteries removed, replaced or disposed of as a result of this project shall be handled, collected and recycled as Universal Waste in accordance with this Section. Any leaking batteries shall be handled, collected and disposed of as Hazardous Waste in accordance with
Section 3.7 of this specification.
3.10.3.2 The Contractor shall collect and store used batteries in plastic lidded U.N. certified shipping containers with the terminals taped with electrical tape. These containers shall be labeled “Universal Waste Batteries (fill in type)” and shall have the initial start date written on the container (the date the first battery was collected in the container). Lids shall remain securely closed on the collection containers at all times.
3.10.3.3 Battery types shall be separated by type, according to DOT shipping requirements.
Containers shall not accumulate more than 60 pounds of batteries each. The Contractor shall keep track of the quantity of batteries (number) collected in each collection container, along with the date added to the container, on a Universal Waste Tracking Log (UWTL) (ref. Submittal
3.10.2.1) that shall be kept with each container while the container. Each full container of batteries shall be weighed in pounds by the Contractor prior to shipment, and the weight of each container shall be recorded on the UWTL. The Contractor shall write a unique container number on each container, and record that number and its corresponding initial start date on the UWTL, which shall be kept wherever the containers are stored.
Section 01560 Page 14
3.10.3.4 The Contractor shall submit for government review and approval the name, address, phone number, point of contact, and EPA ID number of the recycling facility and hazmat transporter to be used to transport and receive collected batteries (ref. Submittal 3.10.2.2)
PRIOR to beginning removal or replacement of any batteries.
3.10.3.5 No battery collection/shipping container shall remain on Dobbins beyond contract completion and no longer than one calendar year from the initial start date. All batteries shall be manifested and shipped off base to the pre-approved Recycling facility prior to the completion of the contract. The manifest shall be signed by the Base Environmental Coordinator, shall list all containers and weights being shipping, and shall identify both the receiving facility and the transporter on the document. A copy of this shipping manifest shall be given to the government at the time of shipment (ref. Submittal 3.10.2.3).
3.10.4 Fluorescent Light Ballasts
3.10.4.1 Fluorescent light ballasts manufactured after 1979 that do not contain PCBs are marked by the manufacturer with the words "No PCBs". If a fluorescent light ballast is discovered to be unmarked with these words it shall be considered to be a PCB ballast.
3.10.4.2 PCB ballasts must be strictly managed as follows:
3.10.4.2.1 PCB ballasts that are intact and non-leaking shall be collected in 5-gallon poly screw-top lidded pails (containers), labeled “PCB Ballasts for Recycling”, which shall be dated with the month/day/year that the first ballast is placed into the container (this is the initial start date).
3.10.4.2.2 Only one pail at a time may be collected at the Contractor’s work site. Lids must be securely in place at all times.
3.10.4.2.3 When the pail reaches the twenty-eighth calendar day from the initial start date, the
Contractor shall transport the pail to the base Hazardous Waste Storage Facility, Bldg 748, in coordination with the Environmental Office.
3.10.4.2.4 No PCB ballasts may be disposed of in a rolloff.
3.10.4.3 Non-PCB ballasts shall be recycled by the Contractor through a licensed recycler of ballasts. The Contractor shall collect these ballasts in containers appropriate for the collection and shipment of these ballasts. The Contractor shall keep the lids on these containers securely closed at all times. The Contractor shall label each container as "Ballasts for Recycling", which shall be dated with the date the first ballast was placed into the container. No ballast collection/shipping container shall remain on Dobbins beyond the contract completion and no longer than one calendar year from the initial start date.
3.10.4.4 All non-PCB ballasts shall be manifested and shipped off base to the pre-approved
Recycling facility prior to the completion of the contract. The manifest shall be signed by the
Base Environmental Coordinator, shall list all containers and weights being shipping, and shall
Section 01560 Page 15 identify both the receiving facility and the transporter on the document. A copy of this shipping manifest shall be given to the government at the time of shipment (ref. Submittal 3.10.2.3).
3.10.4.5 PCB ballasts that were not previously identified as leaking but are discovered by the
Contractor to be leaking prior to removal from fixtures shall cause the Contractor to immediately notify the Contracting Officer. Upon the day of notice from the Contracting Officer to proceed, after notification of discovery, the contractor shall place a leaking PCB light ballast in a 5-gallon poly screw-top UN certified shipping pail, label the pail “PCB Waste” and proceed to turn in the pail to the base Hazardous Waste Storage Facility, Bldg 748, in coordination with the Environmental Office on the same day.
3.10.5 Fluorescent Light Tubes and High Intensity Discharge (HID) Lamps
3.10.5.1 All fluorescent tubes and HID lamps that are removed as part of this work shall be removed intact and shall be handled as "universal waste lamps".
3.10.5.2 The Contractor shall collect used fluorescent light tubes separately from used HID lamps. The Contractor shall collect each type of tube/lamp in containers appropriate for the collection and shipment of these recyclable materials, in accordance with DOT shipping requirements. The Contractor shall be careful when placing tubes/lamps in these containers to prevent breakage.
3.10.5.3 The Contractor shall keep the collection/shipment container lids securely closed at all times, and shall protect the containers from precipitation while being stored for shipment.
Containers shall be labeled in accordance with State Universal Waste requirements for storage and shipping. The labels shall state "Universal Waste Fluorescent Lamps" or "Universal Waste
HID Lamps" and shall be dated with the initial date of accumulation.
3.10.5.4 The Contractor shall keep track of the quantity of tubes/lamps (number) collected in each collection container, along with the date added to the container, on a Universal Waste
Tracking Log (UWTL) (ref. Submittal 3.10.2.1) that shall be kept with the container while they are being stored. Each full container of tubes/lamps shall be weighed in pounds by the
Contractor prior to shipment, and the weight of each container shall be recorded on the UWTL.
3.10.5.5 The Contractor shall write a unique container number on each container, and record that number and its corresponding initial start date on the UWTL, which shall be kept wherever the containers are stored.
3.10.5.6 The Contractor shall submit for government review and approval the name, address, phone number, point of contact, and EPA ID number of the recycling facility and hazmat transporter to be used to transport and receive collected used tubes/lamps (ref. Submittal
3.10.2.2) PRIOR to beginning removal of any light tubes or lamps.
3.10.5.7 All used tubes and lamps shall be manifested and shipped off base to the pre-approved Recycling facility prior to the completion of the contract. The manifest shall be signed by the Base Environmental Coordinator, shall list all containers and weights being shipping, and
Section 01560 Page 16 shall identify both the receiving facility and the transporter on the document. A copy of this shipping manifest shall be given to the government at the time of shipment (ref. Submittal
3.10.2.3)
3.10.5.8 Fluorescent light tubes and HID lamps that accidentally are broken while being removed from fixtures, or when being placed into collection containers, shall be bagged and collected in a separate container to be shipped for recycling. The Contractor shall not discard fluorescent light tubes or HID lamps in base-owned dumpsters or other base debris collection containers.
3.10.6 Mercury-Containing Materials.
Any mercury-containing materials (e.g. mercury switches, thermostats with mercury, etc.)
removed during demolition work, or replaced in the course of construction, shall be collected intact by the Contractor and turned in to the base Hazardous Waste Storage Facility, Bldg 748, in coordination with the Environmental Office, on the same day they are collected. Mercury-containing items shall be identified in the plans and on drawings if they are known to exist.
File details come from the government source that posted it. Updated .