This document package includes a question and answer file and a federal contract opportunity solicitation. The solicitation is for repairs and renovations to Building 1648 at Naval Air Station Fort Worth Joint Reserve Base in Fort Worth, Texas. Work includes floor plan changes, additional fixtures, restroom modifications, separate locker rooms, fire sprinkler installation, mechanical and electrical upgrades, and refinishing of degraded spaces and exterior elements. The single award, firm fixed price contract has a magnitude between $1,000,000 and $5,000,000. A site visit was held on March 30th and requests for information were due by April 7th. Proposals are due by April 10th for construction scheduled to be determined at award. The contracting office is located at NAS Fort Worth JRB and inquiries shall be made via email only regarding this Department of the Air Force Reserve Command solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6675-22-R-00004 Q&A from RFI’s (Dated: 4 May 2022)
RFI#015
Question4: Please provide Hazardous material survey for site including possibility of LBP, Mold, Asbestos. Will the contractor be required to provide this survey?
Government Answer (BCE): Remove and dispose all asbestos duct joint mastic and asbestos containing insulation wrap on piping per drawings, including P-001, PD101, PL101 and MD101.
See Attachment 2 – Updated B1648 Drawing Combined
RFI#016
Question: New Work Keynotes are not shown on plans. See sheet A-101.
Government Answer: See revised A-101 and A-102 for keynotes. See Attachment 2 – Updated B1648 Drawing Combined
RFI#020
Question: SPECIFY MALE BETHROOM (RM 108) PARTITION TYPES SHOWN AT:
BETWEEN TOILETS AND SHOWER ROOM
BETWEEN URINALS AND SHOWER ROOM
SPECIFY FEMALE BATHROOM (RM 106) PARTITION TYPES SHOWN AT:
BETWEEN TOILETS AND SHOWER ROOM
BETWEEN TOILETS AND SINK AREA
Government Answer: See revised A-401 for missing partition types. See Attachment 2 – Updated B1648 Drawing Combined
RFI#025
Question: The document titled Attachment 1 B1648 Design Analysis Combined contradicts itself regarding asbestos material. At first on page 81 it says prior surveys indicate no asbestos or lead have been found. I believe we were told that at the site visit as well. Then later on pages 327 to 330, the below materials are identified. Can you confirm if the below items do need to be removed for this project?
• Duct Joint Mastic in Rooms 3 and 4 attic - 160 LF
• Insulation Wrap on Piping in Rooms 10 and 11, and attic throughout building - 78 fittings plus 350 LF Government Answer: Remove and dispose all asbestos duct joint mastic and asbestos containing insulation wrap on piping per drawings, including P-001, PD101, PL101, and MD101. See Attachment 2 – Updated B1648 Drawing Combined
RFI#026
Question: Could you please provide photos of the manufacture plates on the fire pump, relief valves and Jockey Pump? On FS500 items 1-3 requires as part of the fire sprinkler proposal to repack the fire pump, replace check valves and jockey pump.
Government Answer: Pictures are in attachment named – Pump House Dataplates Pictures.
The jockey pump is in rough shape, and the jockey pump data plate is difficult to read but the jockey pump schedule (model information) is on sheet FS500 below the legend.
File details come from the government source that posted it. Updated .