This document includes a Request for Information form and details of a federal contract opportunity for repairs and renovations to an armament shop at Naval Air Station Fort Worth Joint Reserve Base in Texas. The opportunity involves phased renovations to the building including floor plan changes, additional fixtures, separate locker rooms, fire sprinklers, ductwork modifications, and exterior repairs. Interested parties must attend a mandatory site visit on March 30th and submit any RFIs by April 7th. Proposals for the single award, firm fixed price contract valued between $1-5 million are due on April 18th, with an anticipated construction schedule to be determined at award. The contracting office is located at NAS Fort Worth JRB and the place of performance is also NAS Fort Worth JRB in Fort Worth, Texas.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO: RFI NUMBER: DATE (MM/DD/YY)
SUBJECT: DRAWING REFERENCE / DETAIL:
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:
REQUEST:
PROPOSED SOLUTION (If applicable):
TO(Contracting Officer): 301 CONF/PK FROM (Contractor):
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:
For Evaluation and Action
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contracting Office)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
TO:(Contractor)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO
Reviewer:
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
| TOContractor: |
| Reviewer: |
| Text1: |
| Text2: 001 |
| Date3_af_date: |
| Text4: |
| Text5: |
| Check Box6: Off |
| Date7_af_date: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Date13_af_date: |
| Text14: |
| Text16: |
| Date17_af_date: |
| Text18: |
| Text20: |
| Date21_af_date: |
| Text22: |
| Date24_af_date: |
| Text25: |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Date31_af_date: |
| Text32: |
File details come from the government source that posted it. Updated .