FA667522R0004 QA from RFI-30Mar22.pdf

PDF 142 KB Posted

Attached to
(FY22) B1648 Armament Shop, F-35 Infrastructure Improvements
Solicitation number
FA667522R0004
Issued by

About this file

This document provides details for a federal construction solicitation to complete repairs and renovations to Building 1648 at Naval Air Station Fort Worth Joint Reserve Base in Texas. The project will be done in phases and includes floor plan changes, additional fixtures, rearrangement of restrooms, separate male and female locker rooms, installation of a fire sprinkler system and FA/MNS in the original building half, ductwork modifications, and refinishing degraded finishes. Repairs also involve refinishing exterior doors and windows, damaged gutters and downspouts. The solicitation is a single award firm fixed price contract with a magnitude between $1,000,000 and $5,000,000. A site visit is scheduled for March 30 and the due date for questions is April 7 while proposal responses are due April 18. The contract will be awarded using a lowest price technically acceptable approach.

View the file

Other files

File Type Posted
FA667522R0004 QA from RFI 18May22.pdf PDF
FA667522R00040007 Solicitation Amendment 7 B1648 Armament Shop.pdf PDF
Attachment 12 AMEND 7 1648 Mechanical.pdf PDF
FA667522R00040006 Solicitation Amendment 6 B1648 Armament Shop.pdf PDF
FA667522R00040005 Solicitation Amendment 5 B1648 Armament Shop.pdf PDF
FA667522R0004 QA from RFI 4May22.pdf PDF
Pump House Dataplates Pictures.pdf PDF
Attachment 2 Updated B1648 Drawing Combined.pdf PDF
FA667522R00040004 Solicitation Amendment 4 B1648 Armament Shop.pdf PDF
Fire Pump Report-from RFI012 Question.pdf PDF
FA667522R0004 QA from RFI-12Apr22.pdf PDF
RFI010-Contour Lines B1648.pdf PDF
FA667522R00040003 Amendment 3 B1648 Armament Shop.pdf PDF
FA667522R00040001 Solicitation Amendment 1 B1648 Armament Shop.pdf PDF
FA667522R00040002 Solicitation Amendment 2 B1648 Armament Shop.pdf PDF
Site Walk Sign-in Sheet-30 Mar 22.pdf PDF
Attachment 11 Narrative Amendment Date 28Mar22.pdf PDF
FA667522R0004-Solicitation B1648 Armament Shop.pdf PDF
Attachment 2 - B1648 Drawings Combined.pdf PDF
Attachment 3 - B1648 Specs Combined.pdf PDF
Attachment 6- Phasing Work.pdf PDF
Attachment 10 - DB Wage Rates 17 Dec 2021-Tarrant County.pdf PDF
Attachment 8 - RFI Form.pdf PDF
Attachment 5 - B1648 Hardware Schedule.pdf PDF
Attachment 1 -B1648 Design Analysis Combined.pdf PDF
Attachment 9 - Past Perf Questionnaire.pdf PDF
Attachment 7 - AF 3000.pdf PDF
Attachment 4 -B1648 SID Package.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA6675-22-R-00004 Q&A from RFI’s (Dated: 30 March 2022)

RFI#001

Question 1: As Easter Sunday is April 17th and the current due date is April 18th, we respectfully request the following:

- Please provide at least a one (1) week extension to allow for employees to be with their families on the 17th instead of at the office.

- Please move the due date to a day OTHER than a Monday so employees can be with their families rather than the office on weekends.

Government Answer: No extension allowed, at this.

Question 2: With the ongoing threat of COVID-19 and its new variants, and to protect both Government and contractor employees, we respectfully request that electronic means be permitted for submittal of proposals, either through direct email or a Government SAFE site.

Government Answer:

Electronic submittals of proposals will be allowed through direct email.

Electronic submittals of proposals must be complete, per the solicitation.

Electronic submittals of proposals must be timestamped by the time and date stated in the solicitation.

Electronic submittals of proposals will NOT be allowed via a Government SAFE site.

Question 3: Respectfully request that in lieu of submitting Attachment 9 – Past Performance Questionnaire, contractors may submit CPARS instead.

Government Answer: CPARS reports will be allowed as part of the Past Performance submittal, as well as Attachment 9 Past Performance Questionnaire.

RFI#002

Question 1: Eliminate the Office Administrator as a key personnel requirement.

Government Answer: Provide an Office Administrator to meet the key personnel requirement.

Question 2: Project Manager, Quality Control Manager, On Site Project Superintendent and Safety Manager, duties may be performed by an individual or individuals that meet the required qualifications of each role. Key personnel positions may be "dual-hatted". For example, the Project Manager or Superintendent may serve as the Quality Control Manager or Safety Manager as well.

Government Answer: Key personnel positions may be "dual-hatted", as long as individual or individuals meet the required qualifications of each role.

RFI#003

Question 1: Section L, Page 63 ends in the middle of a sentence. Please provide all missing pages to Section L.

Government Answer: Amendment to solicitation completed and posted with correction to Section L on missing items.

Question 2: Regarding Page Limits: RFP, Page 60 – Volume III Past Performance states: The page limits do not include title sheets, indices, table of contents, schedules, cover sheets, or information/responses to evaluation questionnaires or substitute correspondence from references.

This page limit does include pages with illustrations/photos/sketches.

Do the stipulations listed above also apply to Volume II – Technical Volume and Volume III- Past Performance?

Specifically, do the title sheets, indices, table of contents, schedules, cover sheets count in the Technical and Past Performance Volumes page count?

Government Answer: Section L page 59 under Volume II – Technical and page 60 under Volume III – Past Performance states the stipulations and page limits requirements.

These sections break down how the page count will be reviewed and what does and does not count as part of the count.

Question 3: FP Page 60, Section L, Volume III – Past Performance states: If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past/present performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present relevant contracts. Question: Do both partners of the Joint Venture submit three (3) contracts EACH? Or a total of three (3) projects for the Joint Venture?

Government Answer: A total of three (3) project for the Joint Venture

RFI#004

Question 1: In the solicitation, the bid bond amount and/or percentage are not listed. The liquidated damages for the project are also not listed. Can you please provide these?

Government Answer: Bonds information in solicitation FAR Clause 52.228-15 Performance and Payment Bonds-Construction. Liquidated damages amount in FAR Clause 52.211-12 Liquidated Damages-Construction in Amendment 002.