About this file

CDRL A004

View the file

Other files for this federal contract opportunity

Other files attached to ENTERPRISE COMMAND AND CONTROL (C2) SYSTEM services required to replace and sustain Air Force Reserve Command (AFRC) Command and Control (C2) systems, newest first.
File Type Posted
Site_Visit_Questions_12_Jun.pdf PDF
Site_Visit_Attendees_HQ_AFRC.xlsx XLSX spreadsheet
Site_Visit_Briefing.pptx PPTX presentation
Site_Visit_Attendees_Dobbins.xlsx XLSX spreadsheet
Attachment_3_C2_Operational_Checklist.docx DOCX document
Attachment_3_Section_L_and_M,_Instructions_to_Offerors_and_Evaluation_Basis_of_Award.pdf PDF
Conformed_Solicitation_Amendment_-_FA664319RA0010001.pdf PDF
Attachment_1_Base_locations,_installs_and_removals.xlsx XLSX spreadsheet
DD_1423_CDRL_A005_Lifecycle_Management_Plan_signed.pdf PDF
AFRC_C2_System_RFP_Questions_7_Jun_19.pdf PDF
Attachment_1_Required_Capabilities_(002).pdf PDF
AFRC_C2_System_Site__Visits_Questions_and_Answers__31_May_19.pdf PDF
Solicitation_Amendment_FA664319RA0010001_SF_30.pdf PDF
Attachment_1_Base_locations,_installs_and_removals.xlsx XLSX spreadsheet
DD_1423_CDRL_A005_Lifecycle_Management_Plan_signed.pdf PDF
Questions_and_Answers_A3_A6_(003).pdf PDF
DD_1423_CDRL_A001_Monthly_Status_Report_signed.pdf PDF
DD_1423_CDRL_A003_Training_Certificates_signed.pdf PDF
PWS_Attachment_5__AFRC_C2_System_Delivery_List.xlsx XLSX spreadsheet
Attachment_3_C2_Operational_Checklist_(002).pdf PDF
Attachment_4_Priority_of_C2_Systems_Installation.pdf PDF
DD_1423_CDRL_A008_Contractor's_Quality_Control_Plan_signed.pdf PDF
Attachment_2_Console_Images.pdf PDF
DD_1423_CDRL_A006_Inventory_signed.pdf PDF
DD_1423_CDRL_A002_RMF_signed.pdf PDF
FINAL_Console_PWS_7_May19.pdf PDF
Attachment_3_Section_L_and_M,_Instructions_to_Offerors_and_Evaluation_Basis_of_Award.pdf PDF
DD_1423_CDRL_A004_Integrated_Master_Schedule_signed.pdf PDF
Attachment_2_Pricing_Spreadsheet.xlsx XLSX spreadsheet
RFP_FA664319RA001.pdf PDF
DD_1423_CDRL_A007_Training_Materials_signed.pdf PDF
Attachment_1_Required_Capabilities_(002).pdf PDF
Attachment_4_Priority_of_C2_Systems_Installation.docx DOCX document
Attachment_3_C2_Operational_Checklist.docx DOCX document
Attachment_1_Base_locations,_installs_and_removals.xlsx XLSX spreadsheet
Attachment_2_Console_Images.docx DOCX document
DD_1423_CDRL_A008_Contractor's_Quality_Control_Plan_signed.pdf PDF
DD_1423_CDRL_A005_Lifecycle_Management_Plan_signed.pdf PDF
Attachment_3_Section_L_and_M,_Instructions_to_Offerors_and_Evaluation_Basis_of_Award.doc DOC document
Attachment_1_Required_Capabilities.docx DOCX document
DD_1423_CDRL_A002_RMF_signed.pdf PDF
DD_1423_CDRL_A003_Training_Certificates_signed.pdf PDF
DD_1423_CDRL_A006_Inventory_signed.pdf PDF
DRAFT_Console_PWS_15_Apr19.pdf PDF
DD_1423_CDRL_A001_Monthly_Status_Report_signed.pdf PDF
DRAFT_Solicitation_-_FA664319RA001.pdf PDF
Attachment_2_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Combined_Questions_and_Answers__4-19-2019.docx DOCX document
PWS_Attachment_5__AFRC_C2_System_Delivery_List.xlsx XLSX spreadsheet
DD_1423_CDRL_A007_Training_Materials_signed.pdf PDF
Show all 50

ENTERPRISE COMMAND AND CONTROL (C2) SYSTEM services required to replace and sustain Air Force Reserve Command (AFRC) Command and Control (C2) systems has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A004
title: Integrated Master Schedule (IMS)
sub:
auth: DI-MGMT-81650/T
ref: PWS 2.6
req_ofc: HQ AFRC/A6
dd250:
appcode:
dist: C
freq: One/R
asof: N/A
firstsub: See Blk 16
subsub: See Blk 16
addressee1: HQ AFRC/A6XP
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5: See Block 16
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: Block 12: Final IMS is due 10 business days after post award orientation meeting.

Block 13: Within 10 days of any schedule change

Block 14: All submissions shall be delivered in electronic format. Delivery to afrc.a6xp@us.af.mil

Format: Microsoft Office compatible format is acceptable unless otherwise specified by the Government.

2. Content. IMS shall include the activities of the prime Contractor and their major sub-Contractors. All Contractor schedule information delivered to the Government shall originate from the Execution IMS. The Contractor shall perform appropriate analyses of the Execution IMS tasks and report potential or existing problem areas to the COR and recommend corrective actions to eliminate or reduce schedule impact.

2.1 Contract Milestones and Definitions. Key programmatic events, which define progress and completion for each CWBS element, along with the definition for successful completion of the milestone.

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: Report
system: Enterprise C2 System
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
2019-04-19T12:30:08-0400
MELENDEZ.LOUIS.1165345157
prep_date: 19 Apr 19
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it.