About this file

This document is a Questions and Answers file addressing contractor inquiries regarding Oil Water Separator (OWS) cleaning and maintenance requirements.

The government requires cleaning services for two steel, single-wall Oil Water Separators that were constructed around 1994. The separators contain approximately 12 inches of sludge in each tank and were last cleaned in 2018. No previous inspection reports are available, though attached drawings and photographs document the current condition. Inspection guidance per API 421 is not required; instead, vendors should refer to the new Performance Work Statement (PWS) for inspection procedures. The vendor is responsible for all waste removal and disposal off-base, with no government involvement in draining operations. Both separators may be cleaned simultaneously or in succession, and the work area is not heavily trafficked, allowing space for vendor trucks to be positioned and coned off as needed.

View the file

Other files

File Type Posted
Vendor questions RV3.pdf PDF
Vendor questions RV2.pdf PDF
20260812 Combo RV3.pdf PDF
Attch 3. CLSExport_FA663326QA011 Rv1.pdf PDF
Vendor questions RV1.pdf PDF
Attch 1. MN ARB PWS-POL.pdf PDF
OWS 1 - Bldg 602.pdf PDF
OWS 2 - Bldg 606.pdf PDF
Picture2.png PNG image
Picture4.jpg JPG image
20260806 Combo RV1.pdf PDF
Picture1.jpg JPG image
Picture3.jpg JPG image
Picture5.jpg JPG image
Attch 1. MN ARB SOW-POL.pdf PDF
Attch 3. CLSExport_FA663326QA011.pdf PDF
20260723 Combo.pdf PDF
Attch 2. WD 2015-4945 RV 31.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) What inspection code to follow for inspection (API 421 itself is primarily a design and operation) Please see new PWS, this inspection guidance is not required

2) What Material of construction of the OWS (Steel, Fiberglass, plastic)?

Steel

3) Any drawings of the OWS'?

See attached drawings of OWS 1 & OWS 2

4) Is it a double walled tank?

Single Wall

5) Any inspection history (previous inspection reports)?

There are no reports of last inspection, however it was last cleaned in 2018 see attached pictures

6) When was this built?

Exact date is unknown, but it was around 1994

7) Have the tanks been measured for sludge?

Yes, approximately 12 inches of sludge in each tank.

8) Will the government drain to waste?

No, vendor will do all the removal, and all waste will be disposed of off base

9) How busy is the location of the separator?

Area is not that busy, they will be able to cone off the area for vendor trucks.

10) Will both be cleaned at the same time?

Yes, or in succession