About this file

This is a Request for Information (RFI) Report documenting contractor inquiries regarding a pavement markings maintenance contract at an airfield facility.

The RFI, numbered 0003, was submitted on 18 March 2026 for Solicitation No. FA6606-26-B-0001, titled "Maintain Pavement Markings" (YTPM 25-3001). The document addresses three contractor questions with responses from WARB (Warren Air Force Base). Regarding compass rose markings, the contractor inquired whether existing stencils were available, to which WARB clarified that markings are existing and only require repainting, with no stencils required. For paint color specifications, the contractor requested photographic confirmation and color details; WARB responded that all required colors are listed in the bid quantities with all line-work colors represented. Concerning site access during ramp work, WARB specified that the North ramp would have unrestricted access while the East ramp requires escort at all times due to aircraft presence, with aircraft repositioning to be coordinated through the installation as work progresses. The RFI indicates no potential cost or schedule impact and was reviewed by QA Reviewer Owen George on the specified date.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

SOLICITATION TITLE

Contractor's Request for Information

REQUESTED BY: Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

QUESTIONS FROM CONTRACTOR:

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

SOLICITATION NO.

FA6606-26-B-0001 Maintain Pavement Markings YTPM 25-3001

DATE REQUESTED:

18 March 2026

QUESTION 01: Does the airfield have an existing stencil for the compass rose that can be used for remarking?

WARB RESPONSE 01: The markings are existing and only require repainting. Stencils are not required.

QUESTION 02: Could you please provide a photo and/or confirm the paint colors required to remark the compass rose?

WARB RESPONSE 02: The colors are those listed within the bid quantities. All colors for line-work are represented.

QUESTION 03: What kind of access will the contractor have while working on the ramps?

WARB RESPONSE 03: Unrestricted on the North and escorted on the East at all times due to aircraft presence. The moving of aircraft for painting operations will be coordinated through the installation as the project progresses.