ASHE18-1003_Add_2.pdf

PDF 42 KB Posted

Attached to
ASHE 18-1003 RPR PASs ELEC SYSTEM AT SIERRA LOOP Federal contract opportunity
Solicitation number
FA5682-18-R-0019
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Statement of changes.

View the file

Other files for this federal contract opportunity

Other files attached to ASHE 18-1003 RPR PASs ELEC SYSTEM AT SIERRA LOOP, newest first.
File Type Posted
FA568218R0019_0004.pdf PDF
ASHE_18-1003_CCEB_Rev.1.xls XLS spreadsheet
ASHE_18-1003_WorkItems_Add_1.pdf PDF
FA568218R0019_0003.pdf PDF
FA568218R0019_0002.pdf PDF
FA568218R0019_0001.pdf PDF
Master_Technical_Specs_Nov_2005_English.zip ZIP file
Design_Guides_Aviano.zip ZIP file
Attachment_3_ASHE_18-1003_Additional_Requirements.pdf PDF
FA568218R0019.pdf PDF
ASHE_18-1003_Cost_Estimate_Breakdown.pdf PDF
Door.pdf PDF
Electrical.pdf PDF
General.pdf PDF
ASHE_18-1003_Tech_Specs_EN.pdf PDF
Mechanical.pdf PDF
Civil.pdf PDF
Architectural.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 18-1003 Add#2 1

ADDENDUM #2

9 May 2018

PROJECT ASHE181003

RPR PASs ELEC SYS Sierra, Fac 1191, 1192, 1193, & 1194

AREA F, AVIANO AB, ITALY.

ASHE 18-1003 Add#2 2

TECHNICAL SPECIFICATIONS

(PROJECT ASHE 18-1003 ADD#2)

THE FOLLOWING HEREWITH ADDED:

AC1-10 WORK SITE CONDITIONS

The work in each of the 4 protective aircraft shelters shall be performed one at a time.

Exact phasing will be determined during the pre-construction conference.

AC1-10 WORK SITE CONDITIONS