CONSTRUCTION COST ESTIMATE BREAKDOWN REV 1

View the file

Other files for this federal contract opportunity

Other files attached to ASHE 18-1003 RPR PASs ELEC SYSTEM AT SIERRA LOOP, newest first.
File Type Posted
ASHE18-1003_Add_2.pdf PDF
FA568218R0019_0004.pdf PDF
ASHE_18-1003_WorkItems_Add_1.pdf PDF
FA568218R0019_0003.pdf PDF
FA568218R0019_0002.pdf PDF
FA568218R0019_0001.pdf PDF
Master_Technical_Specs_Nov_2005_English.zip ZIP file
Design_Guides_Aviano.zip ZIP file
FA568218R0019.pdf PDF
ASHE_18-1003_Cost_Estimate_Breakdown.pdf PDF
Attachment_3_ASHE_18-1003_Additional_Requirements.pdf PDF
ASHE_18-1003_Tech_Specs_EN.pdf PDF
Mechanical.pdf PDF
Civil.pdf PDF
General.pdf PDF
Architectural.pdf PDF
Door.pdf PDF
Electrical.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

new cnstr.

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1003AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
NOT APPLICABLE Non Applicabile
Total Architectural Work - Totale Lavori Architettonici0.000.000.000.00
Ib Structural Work - Ib Lavori Strutturali0.000.000.00
NOT APPLICABLE Non Applicabile
Total Structural Work - Totale Lavori Strutturali0.000.000.00
0.000.000.00
Ic Civil Work - Ic Lavori Civili0.000.000.00
NOT APPLICABLE Non Applicabile
Total Civil Work - Totale Lavori Civili0.000.000.00
Id Mechanical Work - Ic Lavori Meccanici
NOT APPLICABLE Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici0.000.000.00
Ie Electrical Work - Ic Lavori Elettrici
NOT APPLICABLE Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici0.000.000.00
TOTAL PART I - Totale Parte I0.000.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
NOT APPLICABLE Non Applicabile
0.000.000.00
Total Architectural Work - Totale Lavori Architettonici0.000.000.000.00
IIb Structural Work - IIb Lavori Strutturali0.000.000.00
NOT APPLICABLE Non Applicabile
Total Structural Work - Totale Lavori Strutturali0.000.000.000.00
IIc Civil Work - IIc Lavori Civili0.000.000.00
NOT APPLICABLE Non Applicabile
Total Civil Work - Totale Lavori Civili0.000.000.000.00
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC System - IIIa Impianto di Condizionamento
NOT APPLICABLE Non Applicabile
Total HVAC Systems - Totale Impianti HVAC0.000.000.000.00
PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler
NOT APPLICABLE Non Applicabile
Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler0.000.000.000.00
TOTAL PART III / Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici0.000.00
NOT APPLICABLE Non Applicabile
TOTAL PART IV / Totale Parte IV0.000.000.000.00
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ 0.00€ 0.00€ 0.00€ 0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART III - MECHANICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART IV - ELECTRICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
TOTAL PRICE / Costo Totale€ 0.00€ 0.00€ 0.00€ 0.00
OR US DOLLARS (RATE 1$ = 0,9049€)$0.00$0.00$0.00$0.00

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N

Repair

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1003AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B.REPAIR WORK / Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
1ASBESTOS REMOVAL. COMPLETE OF DUMP FEE

BLDG 1191, 1192, 1193, 1194

Rimozione amianto. Competo di oneri discarica.

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.1LS/AC1.00
2WINCH, BASE AND METAL SCREEN REMOVAL

BLDG 1191, 1192, 1193, 1194

Rimozione verricello, basamento e schermo metallico

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.2aLS/AC1.00
3SENTRY BOX REMOVAL

BLDG 1191, 1192, 1193, 1194

Rimozione guardiole prefabbricate

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.2bLS/AC1.00
Total Architectural Work - Totale Lavori Architettonici
Ib Structural Work - Ib Lavori Strutturali
4PERFORATION METAL AND CONCRETE WALLS

BLDG 1191, 1192, 1193, 1194

Esecuzione di carrotaggi su pareti in metallo e calcestruzzo

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.1LS/AC1.00
5FOR MECHANICAL SYSTEMS: ENLARGE THE EXISTING HOLE AT THE 800mm DIAMETER WITH INSERTION OF NEW STEEL BARS

BLDG 1191,1192,1193 & 1194

Per impianti meccanici: ingrandire il foro esistente al diametro di 800mm con inserimento di nuove barre in acciaio

Edificio 1191,1192,1193 & 1194IT. No. Art. n.2LS/AC1.00
Total Structural Work - Totale Lavori Strutturali
Ic Civil Work - Ic Lavori Civili
6Not Applicable

Non applicabile

Total Civil Work - Totale Lavori Civili
Id Mechanical Work- Id Lavori Meccanici
7REMOVING EXISTING MECHANICAL INSTALLATIONS OF THE MONO SPLIT SYSTEM AND OF THE AIR EXTRACTION.

COMPLETE PUBLIC LANDFILL CHARGES.

BLDG 1191,1192,1193 & 1194

Rimozione degli impianti meccanici esistenti del sistema mono split e dell'estrazione dell'aria.

Completo di oneri pubblica discarica. Edificio 1191,1192,1193 & 1194IT. No. Art. n.1LS/AC1.00
Total Mechanical Work - Totale Lavori Meccanici
Ie Electrical Work - Ie Lavori Elettrici
8REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION SYSTEM. COMPLETE OF PUBBLIC DUMP FEE.

BLDG 1191,1192,1193 & 1194

Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.

Edifici 1191,1192,1193 & 1194IT. No. Art. n.1LS/AC1.00
Total Electrical Work - Totale Lavori Elettrici
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural Work - IIa Lavori Architettonici
9Not Applicable

Non applicabile

Total Architectural Work - Totale Lavori Architettonici
IIb Structural Work - IIb Lavori Strutturali
10Not Applicable

Non applicabile

Total StructuralL Work - Totale Lavori Strutturali
IIc Civil Work - IIc Lavori Civili
11INSTALL DOOR SEALS - ANTI NAPALM GASKETS

BLDG 1191-1192-1193-1194

Installare nuove guarnizioni porta - guarnizione anti-napalm

Edifici 1191-1192-1193-1194IT. No. Art. n.1LS/AC1.00
12ADJUSTING EPOXY RESIN FLOOR COATING

BLDG 1191-1192-1193-1194

Ripristino della pavimentazione in resina eposidica

Edifici 1191-1192-1193-1194IT. No. Art. n.2aSM/MQ150.00
13PAINT WALL AND DOORS SURFACES

BLDG 1191-1192-1193-1194

Verniciatura superfici pareti e porte

Edifici 1191-1192-1193-1194IT. No. Art. n.2bSM/MQ200.00
14SURVEY OF UNDERGROUND PIPES AND MANHOLE - BLDG 1191-1192-1193-1194
Individuazione e ricerca delle tubazioni interrate (tav C-1) e pozzetti esistenti - Edifici 1191-1192-1193-1194IT. No. Art. n.3LS/AC1.00
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
PART IIIa - HVAC SYSTEMS / Parte IIIa - Impianti HVAC
15GALVANIZED SHEET METAL DUCT, COMPLETE BY SUPPORTS AND ACCESSORIES.

BLDG 1191,1192,1193 & 1194

Canali in lamiera zincata, completo di staffaggi ed accessori.

Edificio 1191,1192,1193 & 1194IT. No. Art. n.1KG/Kg7,000.00
16EXHAUST AIR MOTOR - 14000 mc/h – 1000 mm

BLDG1191,1192,1193 & 1194

Aspiratore antideflagrante - 14000 mc/h –10900 mm

Edificio 1191,1192,1193 & 1194IT. No. Art. n.2EA/NO8.00
17EXHAUST AIR GRILL WHIT REGULATION DAMPER- 800x300 mm

BLDG 1191,1192,1193 & 1194

Griglia di estrazione aria con serranda di regolazione - 800x300 mm

Edificio 1191,1192,1193 & 1194IT. No. Art. n.3EA/NO56.00
18CONTAINER FOR FILTERS IN LINE

BLDG 1191,1192,1193 & 1194

Contenitore per filtri in linea

Edificio 1191,1192,1193 & 1194IT. No. Art. n.4EA/NO8.00
19FINAL TEST MECHANICAL SYSTEM. SUBMITTAL MECHANICAL WORK CERTIFICATIONS.

BLDG 1191,1192,1193 & 1194

Verifica impianto meccanico. Sottomissione delle dichiarazioni di conformità DM 37/08.

Edificio 1191,1192,1193 & 1194IT. No. Art. n.5LS/AC1.00
Total HVAC Systems - Totale Impianti HVAC
PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler
20Not Applicable

Non applicabile

Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
21ADJUSTING AND REVAMPING EXISTING AUTOMATIC MOTOR SYSTEM AND EQUIPMENT - BLDG1191,1192,1193 & 1194
Adeguamento e sistemazione impinto e apparecchiature per il controllo dei motori - edificio 1191, 1192, 1193 e 1194IT. No. Art. n.1EA/NO4.00
22ADJUSTING AND REVAMPING ELECTRICAL PANEL QBT INSEDE BUILDING 15/71192-17/71193-18/71189 .SEE DRAWING.
Adeguamento e sistemazione quadri elettrici esistenti QBT all'interno della cabina elettrica 15/71192-17/71193-18/71189. Vedere disegni.IT. No. Art. n.2LS/AC1.00
23"MDP" ELECTRICAL PANEL - EXPLOSION PROOF.

BLDG 1191,1192,1193 & 1194

Quadro elettrico "MDP" tipo ATEX

EDIFICIO 1191,1192,1193 & 1194IT. No. Art. n.3EA/NO4.00
24"GEN" ELECTRICAL PANEL
Quadro elettrico "GEN"IT. No. Art. n.4aEA/NO3.00
25TRANSFORMER
TrasformatoreIT. No. Art. n.4bEA/NO4.00
26SUPPLY AND INSTALLATION CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 160
Fornitura e posa in opera di cavidotti in polietilene alta densità "PEHD DIAM. 160IT. No. Art. n.5m250.00
27ELECTRICAL CABLE FG16(O)R16 1x25 mmq
Cavo elettrico FG16(O)R16 1x25 mmqIT. No. Art. n.6am350.00
28ELECTRICAL CABLE FG16(O)R16 1x16 mmq
Cavo elettrico FG16(O)R16 1x16 mmqIT. No. Art. n.6bm950.00
29ELECTRICAL CABLE FG16OR16 3G1,5mmq
Cavo elettrico FG16OR16 3G1,5mmqIT. No. Art. n.7am800.00
30ELECTRICAL CABLE FG16OR16 3G2,5mmq
Cavo elettrico FG16OR16 3G2,5mmqIT. No. Art. n.7bm1,600.00
31ELECTRICAL CABLE FG16OR16 3G4mmq
Cavo elettrico FG16OR16 3G4mmqIT. No. Art. n.7cm1,800.00
32ELECTRICAL CABLE FG16OR16 3G6mmq
Cavo elettrico FG16OR16 3G6mmqIT. No. Art. n.7dm800.00
33ELECTRICAL CABLE FG16OR16 5G4mmq
Cavo elettrico FG16OR16 5G4mmqIT. No. Art. n.7em600.00
34ELECTRICAL CABLE FG16OR16 5G6mmq
Cavo elettrico FG16OR16 5G6mmqIT. No. Art. n.7fm400.00
35PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND INFORMATION GROUNDING SYSTEM.
Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra.IT. No.8aEA/NO8.00
36PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 60X60X60X5cm,
Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 60x60x60x5cm,IT. No.8bEA/NO6.00
37BURRIED GROUND CABLE - 95mmq COPPER
Corda di rame nuda 95mmq interrataIT. No. Art. n.9m1,500.00
38HOT GALVANISED STEEL STRIP - 40x4mm
Barra di terra in acciaio zincato - 40x4mmIT. No. Art. n.10am600.00
39GALVANIZED STEEL ROUND WIRE - D.8mm
Tondino in acciaio zinacato - D.8mmIT. No. Art. n.10bm500.00
40PICKING-UP ROD H=2,5m
Asta di captazione H=2,5mIT. No. Art. n.10cEA/NO18.00
41NEW EQUIPOTENTIONAL CONNECTIONS SEE DROWING
Collegamenti equipotenziali come da disegni elettriciIT. No. Art. n.10dLS/AC1.00
42FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1/2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1/2 polliceIT. No.11am350.00
43FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3/4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3/4 polliceIT. No.11bm500.00
44FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 polliceIT. No.11cm800.00
45FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1"1/4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice e 1/4IT. No.11dm350.00
46FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1"1/2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice e 1/2IT. No.11em500.00
47FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 2 pollicIIT. No.11fm1,200.00
48FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3 pollicIIT. No.11gm300.00
49CABLE TRAY 100X75mm + 200X75mm
Canale metallico 100x75mm + 200X75mmIT. No.12m350.00
50180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II2GD Ex de IIC T5
Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5IT. No.13aEA/NO96.00
51LIGHTING FIXTURE SLED 400 WITH LIGHT BEAM OPERATING - TYPE II 2GD Ex-de IIB T5/T6 - CORTEM SLED-400W Proiettore LED 194W (20000 lm; 194W).
Proiettore sled 400W con fascio luminoso - tipo ii 2gd ex-de iib t5/t6 100 cortem sled-400w proiettore led 194w (20000 lm; 194w).IT. No.13bEA/NO16.00
52LED LIGHTING FIXTURE 1x22W - TYPE II 2GD Ex-d IIC T6 - FLFE-122L (GE) CORTEM TYPE (1731lm; 22W) ONLY EMERGENCY.
Plafoniera a led 1x22W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-122L (GE) TYPO CORTEM (1731lm; 22W)IT. No.13cEA/NO16.00
53LED LIGHTING FIXTURE 2x31W -TYPE II 2GD Ex-d IIC T6 - FLFE-231L (GE) CORTEM TYPE (5414 lm; 52.0 W).
Plafoniera a led 2x31W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-231L (GE) TYPO CORTEM (5414lm; 52W)IT. No.13dEA/NO44.00
54EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66
Proiettore asimmetrico industriale da esterno a LED - 92W - IP66IT. No.13eEA/NO16.00
55FLUORESCENT EMERGENCY LIGHTING FIXTURE 1x18W - Ex-d, WITH KIT EMERGENCY-150', WITH EMERGENCY EXIT SIGN - CORTEM EVF-18EX TYPE
Plafoniera di emergenza per lampade, fluorescenti 1x18w-ex-d- completa di kit di emergenza -150', segnaletica per uscite di emergenza.IT. No.13fEA/NO4.00
56PHOTOCELL SWITCH
Sensore crepuscolareIT. No.14EA/NO4.00
57INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF II2GD Ex de IIC T5
Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC T5IT. No.15aEA/NO20.00
58INTERLOCKED OUTLET 2P+G 16A 110V - EXPLOSION PROOF II2GD Ex de IIC T5
Presa interbloccata 2P+G 16A 110V - CE ATEX II2GD Ex de IIC T5IT. No.15bEA/NO20.00
59INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH CIRCUIT BREAKER - GENERATOR.
Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - GeneratoreIT. No.15cEA/NO3.00
60OUTLET AND SUPPLY POINT
Punto di alimentazione prese o FMIT. No.15dEA/NO120.00
61LIGHTING SUPPLY POINT
Punto di alimentazione illuminazione.IT. No.15eEA/NO180.00
62JUNCTION BOX FOR INSTALLATION OF COMMUNICATION EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT) TRAILING SOCKETS, N.8 CABLE GLANDS (ELECTRICAL SET UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6
Custodia per apparati impianto dati. Completa di int. magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 8 pressavavi per futuri punti di ingresso, barra di terra. - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6IT. No.16aEA/NO16.00
63CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4 PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6
Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC T5/T6IT. No.17aEA/NO4.00
64N°3 MOTION SELECTOR HOMING (MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES AND JUNCTION BOX - IP65
Selettore di comando luci a tre posizioni (manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65IT. No.17bEA/NO4.00
65N°3 MOTION SELECTOR HOMING (MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES AND JUNCTION BOX - IP65
Selettore di comando luci a tre posizioni (manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65IT. No.17cEA/NO4.00
66OCCUPANCY SENSORS
Sensori di presenzaIT. No. Art. n.17dEA/NO24.00
67RECONNECT EXISTING SYSTEMS OR DEVICES
Ricollegare gli impianti o le apparecchiature esistenti non rimosseIT. No. Art. n.18LS/AC1.00
68SEALING THE HOLES

BLDG 1191, 1192 1193, 1194

Sigillare i fori o gli attraversamenti

Edifici 1191, 1192 1193, 1194IT. No. Art. n.19LS/AC1.00
69FINAL TEST ELECTRICAL SYSTEM. SUBMITTAL ELECTRICAL WORK CERTIFICATIONS.

BLDG 1191, 1192, 1193, 1194

Verifica impianto elettrico. Sottomissione delle dichiarazioni di conformità DM 37/08 - DPR 462/01

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.20LS/AC1.00
70FURNISH AND INSTALL LOOP CABLE FOR GAS DETECTION SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1 mmq.IT. No.21am400.00
71FURNISH AND INSTALL LOOP CABLE FOR GAS ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1,5 mmq.IT. No.21bm150.00
72FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION PROOF II 2GD Ex d IIC T6
Fornitura e posa in opera lampeggiatore luminoso rosso - CE ATEX II 2GD Ex d IIC T6IT. No.21cEA/NO4.00
73FURNISH AND INSTALL RED FLASHING LIGHT - IP65
Fornitura e posa in opera lampeggiatore luminoso rosso - IP65IT. No.21dEA/NO4.00
74FURNISH AND INSTALL GAS ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND ACCESSORIES, IN WATERPROOF BOX
Fornitura e posa in opera di centrale GAS. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno.IT. No.21eEA/NO4.00
75SUPPLY AND INSTALLATION OF TRANSMITTER MONACO. COMPLETE WITH ANTENNA, cable, SPD, ECC., IN WATERPROOF BOX
Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc., in contenitore stagnoIT. No.21fEA/NO4.00
76FURNISH AND INSTALL JP8 FUEL GAS DETECTOR - EXPLOSION PROOF Ex-d IIC 2GD T6
Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6IT. No.21gEA/NO24.00
77TEST AND CERTIFICATION OF THE NEW GAS ALARM SYSTEM. BLDG 1191, 1192, 1193, 1194
Collaudo e certificazione del nuovo impianto allarme incendio e gas. Edifici 1191, 1192, 1193, 1194IT. No.21hLS/AC1.00
78PHONE RING BELL/STROBE
Avvisatore acustico/luminoso telefonicoIT. No.22EA/NO8.00
79TELECOM EQUIPMENT
Apparecchiatira telefonicaIT. No.23EA/NO12.00
80COMMUNICATION CABLE CAT.6 UTP
cavo UTP cat.6, non schermatoIT. No.24m650.00
81IDS PANEL
Quadro IDSIT. No.25EA/NO4.00
82RECONNECT EXISTING COMMUNICATION SYSTEMS OR DEVICES

BLDG 1191, 1192, 1193, 1194

Ricollegare l'impianto o le apparecchiature dati esistenti.

Edifici 1191, 1192, 1193, 1194IT. No. Art. n.26LS/AC1.00
83TEST AND CERTIFICATION OF COMMUNICATION SYSTEM.

BLDG 1191, 1192, 1193, 1194

Collaudo e certificazione dell'impianto dati.

Edifici 1191, 1192, 1193, 1194IT. No.27LS/AC1.00
TOTAL PART IV / Totale Parte IV
REPAIR WORK SUMMARY / Riepilogo Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1003AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B.REPAIR / Ristutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
SUB TOTAL B.
TOTAL PRICE / Costo Totale€ 0.00€ 0.00€ 0.00€ 0.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N

Grand Total

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018)
INSTRUCTIONS FOR COMPLETING AF FORM
B. REPAIRTOTAL B (€)
TOTAL MATERIAL COSTS€0.00€0.00
TOTAL LABOR COSTS€0.00€0.00
TOTAL OTHER DIRECT COSTS€0.00€0.00
TOTAL DIRECT COSTS€0.000.00€0.00
OVERHEAD%€0.00€0.00
SUBTOTAL€0.00€0.00
PROFIT%€0.00€0.00
TOTAL PRICE€0.00€0.00
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &Pof &N

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.