CONSTRUCTION COST ESTIMATE BREAKDOWN REV 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ASHE18-1003_Add_2.pdf | ||
| FA568218R0019_0004.pdf | ||
| ASHE_18-1003_WorkItems_Add_1.pdf | ||
| FA568218R0019_0003.pdf | ||
| FA568218R0019_0002.pdf | ||
| FA568218R0019_0001.pdf | ||
| Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| Design_Guides_Aviano.zip | ZIP file | |
| FA568218R0019.pdf | ||
| ASHE_18-1003_Cost_Estimate_Breakdown.pdf | ||
| Attachment_3_ASHE_18-1003_Additional_Requirements.pdf | ||
| ASHE_18-1003_Tech_Specs_EN.pdf | ||
| Mechanical.pdf | ||
| Civil.pdf | ||
| General.pdf | ||
| Architectural.pdf | ||
| Door.pdf | ||
| Electrical.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
new cnstr.
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 18-1003 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| A. | NEW CONSTRUCTION / Nuova Costruzione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Architectural Work - Totale Lavori Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Ib Structural Work - Ib Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| Ic Civil Work - Ic Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Civil Work - Totale Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| Id Mechanical Work - Ic Lavori Meccanici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | 0.00 | 0.00 | 0.00 | |||||||
| Ie Electrical Work - Ic Lavori Elettrici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | 0.00 | 0.00 | 0.00 | |||||||
| TOTAL PART I - Totale Parte I | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| Total Architectural Work - Totale Lavori Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| IIb Structural Work - IIb Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| IIc Civil Work - IIc Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Civil Work - Totale Lavori Civili | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL PART II / Totale Parte II | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||
| IIIa HVAC System - IIIa Impianto di Condizionamento | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total HVAC Systems - Totale Impianti HVAC | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL PART III / Totale Parte III | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici | 0.00 | 0.00 | ||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART III - MECHANICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART IV - ELECTRICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| TOTAL PRICE / Costo Totale | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| OR US DOLLARS (RATE 1$ = 0,9049€) | $0.00 | $0.00 | $0.00 | $0.00 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N
Repair
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 18-1003 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| B. | REPAIR WORK / Lavori di Ristrutturazione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | ||||||||||
| 1 | ASBESTOS REMOVAL. COMPLETE OF DUMP FEE |
BLDG 1191, 1192, 1193, 1194
Rimozione amianto. Competo di oneri discarica.
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 2 | WINCH, BASE AND METAL SCREEN REMOVAL |
BLDG 1191, 1192, 1193, 1194
Rimozione verricello, basamento e schermo metallico
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 2a | LS/AC | 1.00 |
| 3 | SENTRY BOX REMOVAL |
BLDG 1191, 1192, 1193, 1194
Rimozione guardiole prefabbricate
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 2b | LS/AC | 1.00 |
| Total Architectural Work - Totale Lavori Architettonici | ||||
| Ib Structural Work - Ib Lavori Strutturali | ||||
| 4 | PERFORATION METAL AND CONCRETE WALLS |
BLDG 1191, 1192, 1193, 1194
Esecuzione di carrotaggi su pareti in metallo e calcestruzzo
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 5 | FOR MECHANICAL SYSTEMS: ENLARGE THE EXISTING HOLE AT THE 800mm DIAMETER WITH INSERTION OF NEW STEEL BARS |
BLDG 1191,1192,1193 & 1194
Per impianti meccanici: ingrandire il foro esistente al diametro di 800mm con inserimento di nuove barre in acciaio
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| Total Structural Work - Totale Lavori Strutturali | ||||
| Ic Civil Work - Ic Lavori Civili | ||||
| 6 | Not Applicable |
Non applicabile
| Total Civil Work - Totale Lavori Civili | |
| Id Mechanical Work- Id Lavori Meccanici | |
| 7 | REMOVING EXISTING MECHANICAL INSTALLATIONS OF THE MONO SPLIT SYSTEM AND OF THE AIR EXTRACTION. |
COMPLETE PUBLIC LANDFILL CHARGES.
BLDG 1191,1192,1193 & 1194
Rimozione degli impianti meccanici esistenti del sistema mono split e dell'estrazione dell'aria.
| Completo di oneri pubblica discarica. Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| Total Mechanical Work - Totale Lavori Meccanici | ||||
| Ie Electrical Work - Ie Lavori Elettrici | ||||
| 8 | REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION SYSTEM. COMPLETE OF PUBBLIC DUMP FEE. |
BLDG 1191,1192,1193 & 1194
Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.
| Edifici 1191,1192,1193 & 1194 | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| Total Electrical Work - Totale Lavori Elettrici | ||||
| TOTAL PART I / Totale Parte I | ||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | ||||
| IIa Architectural Work - IIa Lavori Architettonici | ||||
| 9 | Not Applicable |
Non applicabile
| Total Architectural Work - Totale Lavori Architettonici | |
| IIb Structural Work - IIb Lavori Strutturali | |
| 10 | Not Applicable |
Non applicabile
| Total StructuralL Work - Totale Lavori Strutturali | |
| IIc Civil Work - IIc Lavori Civili | |
| 11 | INSTALL DOOR SEALS - ANTI NAPALM GASKETS |
BLDG 1191-1192-1193-1194
Installare nuove guarnizioni porta - guarnizione anti-napalm
| Edifici 1191-1192-1193-1194 | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 12 | ADJUSTING EPOXY RESIN FLOOR COATING |
BLDG 1191-1192-1193-1194
Ripristino della pavimentazione in resina eposidica
| Edifici 1191-1192-1193-1194 | IT. No. Art. n. | 2a | SM/MQ | 150.00 |
| 13 | PAINT WALL AND DOORS SURFACES |
BLDG 1191-1192-1193-1194
Verniciatura superfici pareti e porte
| Edifici 1191-1192-1193-1194 | IT. No. Art. n. | 2b | SM/MQ | 200.00 |
| 14 | SURVEY OF UNDERGROUND PIPES AND MANHOLE - BLDG 1191-1192-1193-1194 | |||
| Individuazione e ricerca delle tubazioni interrate (tav C-1) e pozzetti esistenti - Edifici 1191-1192-1193-1194 | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| Total Civil Work - Totale Lavori Civili | ||||
| TOTAL PART II / Totale Parte II | ||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||
| PART IIIa - HVAC SYSTEMS / Parte IIIa - Impianti HVAC | ||||
| 15 | GALVANIZED SHEET METAL DUCT, COMPLETE BY SUPPORTS AND ACCESSORIES. |
BLDG 1191,1192,1193 & 1194
Canali in lamiera zincata, completo di staffaggi ed accessori.
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 1 | KG/Kg | 7,000.00 |
| 16 | EXHAUST AIR MOTOR - 14000 mc/h – 1000 mm |
BLDG1191,1192,1193 & 1194
Aspiratore antideflagrante - 14000 mc/h –10900 mm
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 2 | EA/NO | 8.00 |
| 17 | EXHAUST AIR GRILL WHIT REGULATION DAMPER- 800x300 mm |
BLDG 1191,1192,1193 & 1194
Griglia di estrazione aria con serranda di regolazione - 800x300 mm
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 3 | EA/NO | 56.00 |
| 18 | CONTAINER FOR FILTERS IN LINE |
BLDG 1191,1192,1193 & 1194
Contenitore per filtri in linea
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 4 | EA/NO | 8.00 |
| 19 | FINAL TEST MECHANICAL SYSTEM. SUBMITTAL MECHANICAL WORK CERTIFICATIONS. |
BLDG 1191,1192,1193 & 1194
Verifica impianto meccanico. Sottomissione delle dichiarazioni di conformità DM 37/08.
| Edificio 1191,1192,1193 & 1194 | IT. No. Art. n. | 5 | LS/AC | 1.00 |
| Total HVAC Systems - Totale Impianti HVAC | ||||
| PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler | ||||
| 20 | Not Applicable |
Non applicabile
| Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler | ||||
| TOTAL PART III / Totale Parte III | ||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||
| 21 | ADJUSTING AND REVAMPING EXISTING AUTOMATIC MOTOR SYSTEM AND EQUIPMENT - BLDG1191,1192,1193 & 1194 | |||
| Adeguamento e sistemazione impinto e apparecchiature per il controllo dei motori - edificio 1191, 1192, 1193 e 1194 | IT. No. Art. n. | 1 | EA/NO | 4.00 |
| 22 | ADJUSTING AND REVAMPING ELECTRICAL PANEL QBT INSEDE BUILDING 15/71192-17/71193-18/71189 .SEE DRAWING. | |||
| Adeguamento e sistemazione quadri elettrici esistenti QBT all'interno della cabina elettrica 15/71192-17/71193-18/71189. Vedere disegni. | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| 23 | "MDP" ELECTRICAL PANEL - EXPLOSION PROOF. |
BLDG 1191,1192,1193 & 1194
Quadro elettrico "MDP" tipo ATEX
| EDIFICIO 1191,1192,1193 & 1194 | IT. No. Art. n. | 3 | EA/NO | 4.00 |
| 24 | "GEN" ELECTRICAL PANEL | |||
| Quadro elettrico "GEN" | IT. No. Art. n. | 4a | EA/NO | 3.00 |
| 25 | TRANSFORMER | |||
| Trasformatore | IT. No. Art. n. | 4b | EA/NO | 4.00 |
| 26 | SUPPLY AND INSTALLATION CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 160 | |||
| Fornitura e posa in opera di cavidotti in polietilene alta densità "PEHD DIAM. 160 | IT. No. Art. n. | 5 | m | 250.00 |
| 27 | ELECTRICAL CABLE FG16(O)R16 1x25 mmq | |||
| Cavo elettrico FG16(O)R16 1x25 mmq | IT. No. Art. n. | 6a | m | 350.00 |
| 28 | ELECTRICAL CABLE FG16(O)R16 1x16 mmq | |||
| Cavo elettrico FG16(O)R16 1x16 mmq | IT. No. Art. n. | 6b | m | 950.00 |
| 29 | ELECTRICAL CABLE FG16OR16 3G1,5mmq | |||
| Cavo elettrico FG16OR16 3G1,5mmq | IT. No. Art. n. | 7a | m | 800.00 |
| 30 | ELECTRICAL CABLE FG16OR16 3G2,5mmq | |||
| Cavo elettrico FG16OR16 3G2,5mmq | IT. No. Art. n. | 7b | m | 1,600.00 |
| 31 | ELECTRICAL CABLE FG16OR16 3G4mmq | |||
| Cavo elettrico FG16OR16 3G4mmq | IT. No. Art. n. | 7c | m | 1,800.00 |
| 32 | ELECTRICAL CABLE FG16OR16 3G6mmq | |||
| Cavo elettrico FG16OR16 3G6mmq | IT. No. Art. n. | 7d | m | 800.00 |
| 33 | ELECTRICAL CABLE FG16OR16 5G4mmq | |||
| Cavo elettrico FG16OR16 5G4mmq | IT. No. Art. n. | 7e | m | 600.00 |
| 34 | ELECTRICAL CABLE FG16OR16 5G6mmq | |||
| Cavo elettrico FG16OR16 5G6mmq | IT. No. Art. n. | 7f | m | 400.00 |
| 35 | PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND INFORMATION GROUNDING SYSTEM. | |||
| Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra. | IT. No. | 8a | EA/NO | 8.00 |
| 36 | PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 60X60X60X5cm, | |||
| Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 60x60x60x5cm, | IT. No. | 8b | EA/NO | 6.00 |
| 37 | BURRIED GROUND CABLE - 95mmq COPPER | |||
| Corda di rame nuda 95mmq interrata | IT. No. Art. n. | 9 | m | 1,500.00 |
| 38 | HOT GALVANISED STEEL STRIP - 40x4mm | |||
| Barra di terra in acciaio zincato - 40x4mm | IT. No. Art. n. | 10a | m | 600.00 |
| 39 | GALVANIZED STEEL ROUND WIRE - D.8mm | |||
| Tondino in acciaio zinacato - D.8mm | IT. No. Art. n. | 10b | m | 500.00 |
| 40 | PICKING-UP ROD H=2,5m | |||
| Asta di captazione H=2,5m | IT. No. Art. n. | 10c | EA/NO | 18.00 |
| 41 | NEW EQUIPOTENTIONAL CONNECTIONS SEE DROWING | |||
| Collegamenti equipotenziali come da disegni elettrici | IT. No. Art. n. | 10d | LS/AC | 1.00 |
| 42 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1/2 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1/2 pollice | IT. No. | 11a | m | 350.00 |
| 43 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3/4 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3/4 pollice | IT. No. | 11b | m | 500.00 |
| 44 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice | IT. No. | 11c | m | 800.00 |
| 45 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1"1/4 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice e 1/4 | IT. No. | 11d | m | 350.00 |
| 46 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1"1/2 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice e 1/2 | IT. No. | 11e | m | 500.00 |
| 47 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 2 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 2 pollicI | IT. No. | 11f | m | 1,200.00 |
| 48 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3 INCH DIAMETER | |||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3 pollicI | IT. No. | 11g | m | 300.00 |
| 49 | CABLE TRAY 100X75mm + 200X75mm | |||
| Canale metallico 100x75mm + 200X75mm | IT. No. | 12 | m | 350.00 |
| 50 | 180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II2GD Ex de IIC T5 | |||
| Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5 | IT. No. | 13a | EA/NO | 96.00 |
| 51 | LIGHTING FIXTURE SLED 400 WITH LIGHT BEAM OPERATING - TYPE II 2GD Ex-de IIB T5/T6 - CORTEM SLED-400W Proiettore LED 194W (20000 lm; 194W). | |||
| Proiettore sled 400W con fascio luminoso - tipo ii 2gd ex-de iib t5/t6 100 cortem sled-400w proiettore led 194w (20000 lm; 194w). | IT. No. | 13b | EA/NO | 16.00 |
| 52 | LED LIGHTING FIXTURE 1x22W - TYPE II 2GD Ex-d IIC T6 - FLFE-122L (GE) CORTEM TYPE (1731lm; 22W) ONLY EMERGENCY. | |||
| Plafoniera a led 1x22W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-122L (GE) TYPO CORTEM (1731lm; 22W) | IT. No. | 13c | EA/NO | 16.00 |
| 53 | LED LIGHTING FIXTURE 2x31W -TYPE II 2GD Ex-d IIC T6 - FLFE-231L (GE) CORTEM TYPE (5414 lm; 52.0 W). | |||
| Plafoniera a led 2x31W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-231L (GE) TYPO CORTEM (5414lm; 52W) | IT. No. | 13d | EA/NO | 44.00 |
| 54 | EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66 | |||
| Proiettore asimmetrico industriale da esterno a LED - 92W - IP66 | IT. No. | 13e | EA/NO | 16.00 |
| 55 | FLUORESCENT EMERGENCY LIGHTING FIXTURE 1x18W - Ex-d, WITH KIT EMERGENCY-150', WITH EMERGENCY EXIT SIGN - CORTEM EVF-18EX TYPE | |||
| Plafoniera di emergenza per lampade, fluorescenti 1x18w-ex-d- completa di kit di emergenza -150', segnaletica per uscite di emergenza. | IT. No. | 13f | EA/NO | 4.00 |
| 56 | PHOTOCELL SWITCH | |||
| Sensore crepuscolare | IT. No. | 14 | EA/NO | 4.00 |
| 57 | INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF II2GD Ex de IIC T5 | |||
| Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC T5 | IT. No. | 15a | EA/NO | 20.00 |
| 58 | INTERLOCKED OUTLET 2P+G 16A 110V - EXPLOSION PROOF II2GD Ex de IIC T5 | |||
| Presa interbloccata 2P+G 16A 110V - CE ATEX II2GD Ex de IIC T5 | IT. No. | 15b | EA/NO | 20.00 |
| 59 | INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH CIRCUIT BREAKER - GENERATOR. | |||
| Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - Generatore | IT. No. | 15c | EA/NO | 3.00 |
| 60 | OUTLET AND SUPPLY POINT | |||
| Punto di alimentazione prese o FM | IT. No. | 15d | EA/NO | 120.00 |
| 61 | LIGHTING SUPPLY POINT | |||
| Punto di alimentazione illuminazione. | IT. No. | 15e | EA/NO | 180.00 |
| 62 | JUNCTION BOX FOR INSTALLATION OF COMMUNICATION EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT) TRAILING SOCKETS, N.8 CABLE GLANDS (ELECTRICAL SET UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6 | |||
| Custodia per apparati impianto dati. Completa di int. magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 8 pressavavi per futuri punti di ingresso, barra di terra. - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6 | IT. No. | 16a | EA/NO | 16.00 |
| 63 | CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4 PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6 | |||
| Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC T5/T6 | IT. No. | 17a | EA/NO | 4.00 |
| 64 | N°3 MOTION SELECTOR HOMING (MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES AND JUNCTION BOX - IP65 | |||
| Selettore di comando luci a tre posizioni (manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65 | IT. No. | 17b | EA/NO | 4.00 |
| 65 | N°3 MOTION SELECTOR HOMING (MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES AND JUNCTION BOX - IP65 | |||
| Selettore di comando luci a tre posizioni (manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65 | IT. No. | 17c | EA/NO | 4.00 |
| 66 | OCCUPANCY SENSORS | |||
| Sensori di presenza | IT. No. Art. n. | 17d | EA/NO | 24.00 |
| 67 | RECONNECT EXISTING SYSTEMS OR DEVICES | |||
| Ricollegare gli impianti o le apparecchiature esistenti non rimosse | IT. No. Art. n. | 18 | LS/AC | 1.00 |
| 68 | SEALING THE HOLES |
BLDG 1191, 1192 1193, 1194
Sigillare i fori o gli attraversamenti
| Edifici 1191, 1192 1193, 1194 | IT. No. Art. n. | 19 | LS/AC | 1.00 |
| 69 | FINAL TEST ELECTRICAL SYSTEM. SUBMITTAL ELECTRICAL WORK CERTIFICATIONS. |
BLDG 1191, 1192, 1193, 1194
Verifica impianto elettrico. Sottomissione delle dichiarazioni di conformità DM 37/08 - DPR 462/01
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 20 | LS/AC | 1.00 |
| 70 | FURNISH AND INSTALL LOOP CABLE FOR GAS DETECTION SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM. | |||
| Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1 mmq. | IT. No. | 21a | m | 400.00 |
| 71 | FURNISH AND INSTALL LOOP CABLE FOR GAS ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM. | |||
| Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1,5 mmq. | IT. No. | 21b | m | 150.00 |
| 72 | FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION PROOF II 2GD Ex d IIC T6 | |||
| Fornitura e posa in opera lampeggiatore luminoso rosso - CE ATEX II 2GD Ex d IIC T6 | IT. No. | 21c | EA/NO | 4.00 |
| 73 | FURNISH AND INSTALL RED FLASHING LIGHT - IP65 | |||
| Fornitura e posa in opera lampeggiatore luminoso rosso - IP65 | IT. No. | 21d | EA/NO | 4.00 |
| 74 | FURNISH AND INSTALL GAS ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND ACCESSORIES, IN WATERPROOF BOX | |||
| Fornitura e posa in opera di centrale GAS. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno. | IT. No. | 21e | EA/NO | 4.00 |
| 75 | SUPPLY AND INSTALLATION OF TRANSMITTER MONACO. COMPLETE WITH ANTENNA, cable, SPD, ECC., IN WATERPROOF BOX | |||
| Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc., in contenitore stagno | IT. No. | 21f | EA/NO | 4.00 |
| 76 | FURNISH AND INSTALL JP8 FUEL GAS DETECTOR - EXPLOSION PROOF Ex-d IIC 2GD T6 | |||
| Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6 | IT. No. | 21g | EA/NO | 24.00 |
| 77 | TEST AND CERTIFICATION OF THE NEW GAS ALARM SYSTEM. BLDG 1191, 1192, 1193, 1194 | |||
| Collaudo e certificazione del nuovo impianto allarme incendio e gas. Edifici 1191, 1192, 1193, 1194 | IT. No. | 21h | LS/AC | 1.00 |
| 78 | PHONE RING BELL/STROBE | |||
| Avvisatore acustico/luminoso telefonico | IT. No. | 22 | EA/NO | 8.00 |
| 79 | TELECOM EQUIPMENT | |||
| Apparecchiatira telefonica | IT. No. | 23 | EA/NO | 12.00 |
| 80 | COMMUNICATION CABLE CAT.6 UTP | |||
| cavo UTP cat.6, non schermato | IT. No. | 24 | m | 650.00 |
| 81 | IDS PANEL | |||
| Quadro IDS | IT. No. | 25 | EA/NO | 4.00 |
| 82 | RECONNECT EXISTING COMMUNICATION SYSTEMS OR DEVICES |
BLDG 1191, 1192, 1193, 1194
Ricollegare l'impianto o le apparecchiature dati esistenti.
| Edifici 1191, 1192, 1193, 1194 | IT. No. Art. n. | 26 | LS/AC | 1.00 |
| 83 | TEST AND CERTIFICATION OF COMMUNICATION SYSTEM. |
BLDG 1191, 1192, 1193, 1194
Collaudo e certificazione dell'impianto dati.
| Edifici 1191, 1192, 1193, 1194 | IT. No. | 27 | LS/AC | 1.00 |
| TOTAL PART IV / Totale Parte IV | ||||
| REPAIR WORK SUMMARY / Riepilogo Lavori di Ristrutturazione | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||
| PART III - MECHANICAL WORK | ||||
| PART IV - ELECTRICAL WORK | ||||
| TOTAL PRICE / Costo Totale |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 18-1003 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| B. | REPAIR / Ristutturazione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL WORK | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| SUB TOTAL B. | ||||||||||
| TOTAL PRICE / Costo Totale | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| 1 | ||||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| 9 | ||||||||||
| 10 | ||||||||||
| 11 | ||||||||||
| 12 | ||||||||||
| 13 | ||||||||||
| 14 | ||||||||||
| 15 | ||||||||||
| 16 | ||||||||||
| 17 | ||||||||||
| 18 | ||||||||||
| 19 | ||||||||||
| 20 | ||||||||||
| 21 | ||||||||||
| 22 | ||||||||||
| 23 | ||||||||||
| 24 | ||||||||||
| 25 | ||||||||||
| 26 | ||||||||||
| 27 | ||||||||||
| 28 | ||||||||||
| 29 | ||||||||||
| 30 | ||||||||||
| 31 | ||||||||||
| 32 | ||||||||||
| 33 | ||||||||||
| 34 | ||||||||||
| 35 | ||||||||||
| 36 | ||||||||||
| 37 | ||||||||||
| 38 | ||||||||||
| 39 | ||||||||||
| 40 | ||||||||||
| 41 | ||||||||||
| 42 | ||||||||||
| 43 | ||||||||||
| 44 | ||||||||||
| 45 | ||||||||||
| 46 | ||||||||||
| 47 | ||||||||||
| 48 | ||||||||||
| 49 | ||||||||||
| 50 | ||||||||||
| 51 | ||||||||||
| 52 | ||||||||||
| 53 | ||||||||||
| 54 | ||||||||||
| 55 | ||||||||||
| 56 | ||||||||||
| 57 | ||||||||||
| 58 | ||||||||||
| 59 | ||||||||||
| 60 | ||||||||||
| 61 | ||||||||||
| 62 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12 FOR OFFICIAL USE ONLY&RSheet &P of &N
Grand Total
| RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY (Revision 1 dated 02 May 2018) | |||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM | |||||||||
| B. REPAIR | TOTAL B (€) | ||||||||
| TOTAL MATERIAL COSTS | € | 0.00 | € | 0.00 | |||||
| TOTAL LABOR COSTS | € | 0.00 | € | 0.00 | |||||
| TOTAL OTHER DIRECT COSTS | € | 0.00 | € | 0.00 | |||||
| TOTAL DIRECT COSTS | € | 0.00 | 0.00 | € | 0.00 | ||||
| OVERHEAD | % | € | 0.00 | € | 0.00 | ||||
| SUBTOTAL | € | 0.00 | € | 0.00 | |||||
| PROFIT | % | € | 0.00 | € | 0.00 | ||||
| TOTAL PRICE | € | 0.00 | € | 0.00 | |||||
| DATE | FIRM NAME | ||||||||
| TITLE | BY | ||||||||
| INSTRUCTIONS TO OFFERORS | |||||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 | |||||||||
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 | |||||||||
| 48 | |||||||||
| 49 | |||||||||
| 50 | |||||||||
| 51 | |||||||||
| 52 | |||||||||
| 53 | |||||||||
| 54 | |||||||||
| 55 | |||||||||
| 56 | |||||||||
| 57 | |||||||||
| 58 | |||||||||
| 59 | |||||||||
| 60 | |||||||||
| 61 | |||||||||
| 62 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &Pof &N
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.