CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files for this federal contract opportunity

Other files attached to ASHE 18-1003 RPR PASs ELEC SYSTEM AT SIERRA LOOP, newest first.
File Type Posted
ASHE18-1003_Add_2.pdf PDF
FA568218R0019_0004.pdf PDF
ASHE_18-1003_CCEB_Rev.1.xls XLS spreadsheet
ASHE_18-1003_WorkItems_Add_1.pdf PDF
FA568218R0019_0003.pdf PDF
FA568218R0019_0002.pdf PDF
FA568218R0019_0001.pdf PDF
Master_Technical_Specs_Nov_2005_English.zip ZIP file
Design_Guides_Aviano.zip ZIP file
Attachment_3_ASHE_18-1003_Additional_Requirements.pdf PDF
FA568218R0019.pdf PDF
Door.pdf PDF
Electrical.pdf PDF
General.pdf PDF
ASHE_18-1003_Tech_Specs_EN.pdf PDF
Mechanical.pdf PDF
Civil.pdf PDF
Architectural.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CENM

AVIANO AIR BASE, ITALY

PROJECT : ASHE 18-1003

SUBMITTAL : 100%

SUBMITTAL DATE : DEC 2017

Cost Estimate Breakdown Preventivo Lista Lavori

Project : ASHE 18-1003 RPR PASs ELEC SYS Sierra, Fac 1191, 1192, 1193, & 1194

Location :

AREA F, AVIANO AB, ITALY.

Project Phase:

100% FINAL

Date:

DEC 2017

Prepared and Submitted by:

“HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT ASHE 18-1003 RPR PASs ELEC SYS SIERRA LOOP, 1191, 1192, 1193, 1194 AREA F AVIANO AIR BASE, I DECLARE THAT I HAVE ACCERTAINED THAT THE STRUCTURES AND THE

TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABILE ITALIAN NORMS.

DATE: DEC 2017

SIGNATURE

FOR OFFICIAL USE ONLY

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A.

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Work - Ia Lavori Architettonici

NOT APPLICABLE

Non Applicabile

Total Architectural Work - Totale Lavori Architettonici

Ib Structural Work - Ib Lavori Strutturali

NOT APPLICABLE

Non Applicabile

Total Structural Work - Totale Lavori Strutturali

Ic Civil Work - Ic Lavori Civili

NOT APPLICABLE

Non Applicabile

Total Civil Work - Totale Lavori Civili

Id Mechanical Work - Ic Lavori Meccanici

NOT APPLICABLE

Non Applicabile

NEW CONSTRUCTION / Nuova Costruzione

FOR OFFICIAL USE ONLY Sheet 1 of 4

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Total Mechanical Work - Totale Lavori Meccanici

Ie Electrical Work - Ic Lavori Elettrici

NOT APPLICABLE

Non Applicabile

Total Mechanical Work - Totale Lavori Meccanici

TOTAL PART I - Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

NOT APPLICABLE

Non Applicabile

Total Architectural Work - Totale Lavori Architettonici

IIb Structural Work - IIb Lavori Strutturali

NOT APPLICABLE

Non Applicabile

Total Structural Work - Totale Lavori Strutturali

IIc Civil Work - IIc Lavori Civili

NOT APPLICABLE

Non Applicabile

FOR OFFICIAL USE ONLY Sheet 2 of 4

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Total Civil Work - Totale Lavori Civili

TOTAL PART II / Totale Parte II

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

IIIa HVAC System - IIIa Impianto di Condizionamento

NOT APPLICABLE

Non Applicabile

Total HVAC Systems - Totale Impianti HVAC

PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler

NOT APPLICABLE

Non Applicabile

Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler

TOTAL PART III / Totale Parte III

PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici

NOT APPLICABLE

Non Applicabile

TOTAL PART IV / Totale Parte IV

FOR OFFICIAL USE ONLY Sheet 3 of 4

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,9049€)

PART IV - ELECTRICAL WORK

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

FOR OFFICIAL USE ONLY Sheet 4 of 4

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

B.

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Work - Ia Lavori Architettonici

ASBESTOS REMOVAL. COMPLETE OF DUMP FEE

BLDG 1191, 1192, 1193, 1194

Rimozione amianto. Competo di oneri discarica.

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

1 LS/AC

WINCH, BASE AND METAL SCREEN REMOVAL

BLDG 1191, 1192, 1193, 1194

Rimozione verricello, basamento e schermo metallico

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

2a LS/AC

SENTRY BOX REMOVAL

BLDG 1191, 1192, 1193, 1194

Rimozione guardiole prefabbricate

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

2b LS/AC

Total Architectural Work - Totale Lavori Architettonici

Ib Structural Work - Ib Lavori Strutturali

PERFORATION METAL AND CONCRETE WALLS

BLDG 1191, 1192, 1193, 1194

Esecuzione di carrotaggi su pareti in metallo e calcestruzzo

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

1 LS/AC

REPAIR WORK / Lavori di Ristrutturazione

FOR OFFICIAL USE ONLY Sheet 1 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FOR MECHANICAL SYSTEMS: ENLARGE THE EXISTING

HOLE AT THE 800mm DIAMETER WITH INSERTION OF NEW

STEEL BARS

BLDG 1191,1192,1193 & 1194

Per impianti meccanici: ingrandire il foro esistente al diametro di

800mm con inserimento di nuove barre in acciaio

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

2 LS/AC

Total Structural Work - Totale Lavori Strutturali

Ic Civil Work - Ic Lavori Civili

Not Applicable

Non applicabile

Total Civil Work - Totale Lavori Civili

Id Mechanical Work- Id Lavori Meccanici

REMOVING EXISTING MECHANICAL INSTALLATIONS OF THE

MONO SPLIT SYSTEM AND OF THE AIR EXTRACTION.

COMPLETE PUBLIC LANDFILL CHARGES.

BLDG 1191,1192,1193 & 1194

Rimozione degli impianti meccanici esistenti del sistema mono split e dell'estrazione dell'aria.

Completo di oneri pubblica discarica.

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

1 LS/AC

Total Mechanical Work - Totale Lavori Meccanici

Ie Electrical Work - Ie Lavori Elettrici

FOR OFFICIAL USE ONLY Sheet 2 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION

SYSTEM. COMPLETE OF PUBBLIC DUMP FEE.

BLDG 1191,1192,1193 & 1194

Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.

Edifici 1191,1192,1193 & 1194

IT. No.

Art. n.

1 LS/AC

Total Electrical Work - Totale Lavori Elettrici

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural Work - IIa Lavori Architettonici

Not Applicable

Non applicabile

Total Architectural Work - Totale Lavori Architettonici

IIb Structural Work - IIb Lavori Strutturali

Not Applicable

Non applicabile

Total StructuralL Work - Totale Lavori Strutturali

IIc Civil Work - IIc Lavori Civili

FOR OFFICIAL USE ONLY Sheet 3 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

INSTALL DOOR SEALS - ANTI NAPALM GASKETS

BLDG 1191-1192-1193-1194

Installare nuove guarnizioni porta - guarnizione anti-napalm

Edifici 1191-1192-1193-1194

IT. No.

Art. n.

1 LS/AC

ADJUSTING EPOXY RESIN FLOOR COATING

BLDG 1191-1192-1193-1194

Ripristino della pavimentazione in resina eposidica

Edifici 1191-1192-1193-1194

IT. No.

Art. n.

2a SM/MQ

PAINT WALL AND DOORS SURFACES

BLDG 1191-1192-1193-1194

Verniciatura superfici pareti e porte

Edifici 1191-1192-1193-1194

IT. No.

Art. n.

2b SM/MQ

SURVEY OF UNDERGROUND PIPES (tav c-1) AND

INSTALLATION NEW MANHOLE - BLDG 1191-1192-1193-1194

Individuazione e ricerca delle tubazioni interrate (tav C-1) e installaizonje nuovo pozzetto - Edifici 1191-1192-1193-1194

IT. No.

Art. n.

3 LS/AC

Total Civil Work - Totale Lavori Civili

TOTAL PART II / Totale Parte II

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

PART IIIa - HVAC SYSTEMS / Parte IIIa - Impianti HVAC

FOR OFFICIAL USE ONLY Sheet 4 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

GALVANIZED SHEET METAL DUCT, COMPLETE BY

SUPPORTS AND ACCESSORIES.

BLDG 1191,1192,1193 & 1194

Canali in lamiera zincata, completo di staffaggi ed accessori.

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

1 KG/Kg

EXHAUST AIR MOTOR - 14000 mc/h – 1000 mm

BLDG1191,1192,1193 & 1194

Aspiratore antideflagrante - 14000 mc/h –10900 mm

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

2 EA/NO

EXHAUST AIR GRILL WHIT REGULATION DAMPER- 800x300 mm

BLDG 1191,1192,1193 & 1194

Griglia di estrazione aria con serranda di regolazione - 800x300 mm

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

3 EA/NO

CONTAINER FOR FILTERS IN LINE

BLDG 1191,1192,1193 & 1194

Contenitore per filtri in linea

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

4 EA/NO

FINAL TEST MECHANICAL SYSTEM. SUBMITTAL

MECHANICAL WORK CERTIFICATIONS.

BLDG 1191,1192,1193 & 1194

Verifica impianto meccanico. Sottomissione delle dichiarazioni di conformità DM 37/08.

Edificio 1191,1192,1193 & 1194

IT. No.

Art. n.

5 LS/AC

Total HVAC Systems - Totale Impianti HVAC

PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler

Not Applicable

Non applicabile

FOR OFFICIAL USE ONLY Sheet 5 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler

TOTAL PART III / Totale Parte III

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici

ADJUSTING AND REVAMPING EXISTING AUTOMATIC

MOTOR SYSTEM AND EQUIPMENT - BLDG1191,1192,1193 &

Adeguamento e sistemazione impinto e apparecchiature per il controllo dei motori - edificio 1191, 1192, 1193 e 1194

IT. No.

Art. n.

1 EA/NO

ADJUSTING AND REVAMPING ELECTRICAL PANEL QBT

INSEDE BUILDING 15/71192-17/71193-18/71189 .SEE

DRAWING.

Adeguamento e sistemazione quadri elettrici esistenti QBT all'interno della cabina elettrica 15/71192-17/71193-18/71189.

Vedere disegni.

IT. No.

Art. n.

2 LS/AC

"MDP" ELECTRICAL PANEL - EXPLOSION PROOF.

BLDG 1191,1192,1193 & 1194

Quadro elettrico "MDP" tipo ATEX

EDIFICIO 1191,1192,1193 & 1194

IT. No.

Art. n.

3 EA/NO

"GEN" ELECTRICAL PANEL

Quadro elettrico "GEN"

IT. No.

Art. n.

4a EA/NO

TRANSFORMER

Trasformatore

IT. No.

Art. n.

4b EA/NO

FOR OFFICIAL USE ONLY Sheet 6 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN

WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE

"HDPE DIAM. 90

Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 90

IT. No.

Art. n.

5 m

ELECTRICAL CABLE FG7R 1x35mmq

Cavo elettrico FG7R 1x35mmq

IT. No.

Art. n.

6a m

ELECTRICAL CABLE FG7R 1x25mmq

Cavo elettrico FG7R 1x25mmq

IT. No.

Art. n.

6b m

ELECTRICAL CABLE FG7R 1x16mmq

Cavo elettrico FG7R 1x16mmq

IT. No.

Art. n.

6c m

AUXILIARY ELECTRICAL CABLE WITH FG16OR16

Collegamento ausiliari con cavo FG16OR16

IT. No.

Art. n.

7a LS/AC

ELECTRICAL CABLE FG16OR16 3G1,5mmq

Cavo elettrico FG16OR16 3G1,5mmq

IT. No.

Art. n.

7b m

ELECTRICAL CABLE FG16OR16 3G2,5mmq

Cavo elettrico FG16OR16 3G2,5mmq

IT. No.

Art. n.

7c m

ELECTRICAL CABLE FG16OR16 3G4mmq

Cavo elettrico FG16OR16 3G4mmq

IT. No.

Art. n.

7d m

ELECTRICAL CABLE FG16OR16 3G6mmq

Cavo elettrico FG16OR16 3G6mmq

IT. No.

Art. n.

7e m

ELECTRICAL CABLE FG16OR16 5G4mmq

Cavo elettrico FG16OR16 5G4mmq

IT. No.

Art. n.

7f m

ELECTRICAL CABLE FG16OR16 5G6mmq

Cavo elettrico FG16OR16 5G6mmq

IT. No.

Art. n.

7g m

FOR OFFICIAL USE ONLY Sheet 7 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PRECAST REINFORCED CONCRETE MANHOLES WITH

MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND

INFORMATION GROUNDING SYSTEM.

Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra.

IT. No. 8a EA/NO

PRECAST REINFORCED CONCRETE MANHOLES WITH

MANHOLE DRIVEWAY VIBRATED BY 60X60X60X5cm, Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 60x60x60x5cm, IT. No. 8b EA/NO

BURRIED GROUND CABLE - 95mmq COPPER

Corda di rame nuda 95mmq interrata

IT. No.

Art. n.

9 m

HOT GALVANISED STEEL STRIP - 40x4mm

Barra di terra in acciaio zincato - 40x4mm

IT. No.

Art. n.

10a m

GALVANIZED STEEL ROUND WIRE - D.8mm

Tondino in acciaio zinacato - D.8mm

IT. No.

Art. n.

10b m

PICKING-UP ROD H=2,5m

Asta di captazione H=2,5m

IT. No.

Art. n.

10c EA/NO

NEW EQUIPOTENTIONAL CONNECTIONS SEE DROWING

Collegamenti equipotenziali come da disegni elettrici

IT. No.

Art. n.

10d LS/AC

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 1/2 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1/2 pollice

IT. No. 11a m

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 3/4 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 3/4 pollice

IT. No. 11b m

FOR OFFICIAL USE ONLY Sheet 8 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 1 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice

IT. No. 11c m

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 1"1/4 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice e 1/4

IT. No. 11d m

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 1"1/2 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice e 1/2

IT. No. 11e m

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 2 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 2 pollicI

IT. No. 11f m

FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI

7683) - 3 INCH DIAMETER

Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 3 pollicI

IT. No. 11g m

CABLE TRAY 100X75mm + 200X75mm

Canale metallico 100x75mm + 200X75mm IT. No. 12 m

180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION

PROOF II2GD Ex de IIC T5

Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5

IT. No. 13a EA/NO

FOR OFFICIAL USE ONLY Sheet 9 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

LIGHTING FIXTURE SLED 400 WITH LIGHT BEAM

OPERATING - TYPE II 2GD Ex-de IIB T5/T6 - CORTEM SLED-

400W Proiettore LED 194W (20000 lm; 194W).

Proiettore sled 400W con fascio luminoso - tipo ii 2gd ex-de iib t5/t6 100 cortem sled-400w proiettore led 194w (20000 lm; 194w).

IT. No. 13b EA/NO

LED LIGHTING FIXTURE 1x22W - TYPE II 2GD Ex-d IIC T6 -

FLFE-122L (GE) CORTEM TYPE (1731lm; 22W) ONLY

EMERGENCY.

Plafoniera a led 1x22W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-

122L (GE) TYPO CORTEM (1731lm; 22W)

IT. No. 13c EA/NO

LED LIGHTING FIXTURE 2x31W -TYPE II 2GD Ex-d IIC T6 -

FLFE-231L (GE) CORTEM TYPE (5414 lm; 52.0 W).

Plafoniera a led 2x31W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-

231L (GE) TYPO CORTEM (5414lm; 52W)

IT. No. 13d EA/NO

EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66

Proiettore asimmetrico industriale da esterno a LED - 92W - IP66 IT. No. 13e EA/NO

FLUORESCENT EMERGENCY LIGHTING FIXTURE 1x18W - Ex-d, WITH KIT EMERGENCY-150', WITH EMERGENCY EXIT

SIGN - CORTEM EVF-18EX TYPE

Plafoniera di emergenza per lampade, fluorescenti 1x18w-ex-d-completa di kit di emergenza -150', segnaletica per uscite di emergenza.

IT. No. 13f EA/NO

PHOTOCELL SWITCH

Sensore crepuscolare IT. No. 14 EA/NO

INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF

II2GD Ex de IIC T5

Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC

T5

IT. No. 15a EA/NO

FOR OFFICIAL USE ONLY Sheet 10 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

INTERLOCKED OUTLET 2P+G 16A 110V - EXPLOSION PROOF

II2GD Ex de IIC T5

Presa interbloccata 2P+G 16A 110V - CE ATEX II2GD Ex de IIC

T5

IT. No. 15b EA/NO

INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH

CIRCUIT BREAKER - GENERATOR.

Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - Generatore

IT. No. 15c EA/NO

OUTLET OR FM SUPPLY POINT

Punto di alimentazione prese o FM IT. No. 15d EA/NO

LIGHTING SUPPLY POINT

Punto di alimentazione illuminazione.

IT. No. 15e EA/NO

JUNCTION BOX FOR INSTALLATION OF COMMUNICATION

EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON

FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT)

TRAILING SOCKETS, N.8 CABLE GLANDS (ELECTRICAL SET

UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm -

EXPLOSION PROOF II2GD Ex d IIB T5/T6

Custodia per apparati impianto dati. Completa di int.

magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 8 pressavavi per futuri punti di ingresso, barra di terra. -dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB

T5/T6

IT. No. 16a EA/NO

CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4

PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6

Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC

T5/T6

IT. No. 17a EA/NO

FOR OFFICIAL USE ONLY Sheet 11 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

N°3 MOTION SELECTOR HOMING

(MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES

AND JUNCTION BOX - IP65

Selettore di comando luci a tre posizioni

(manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65

IT. No. 17b EA/NO

N°3 MOTION SELECTOR HOMING

(MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES

AND JUNCTION BOX - IP65

Selettore di comando luci a tre posizioni

(manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65

IT. No. 17c EA/NO

OCCUPANCY SENSORS

Sensori di presenza

IT. No.

Art. n.

17d EA/NO

RECONNECT EXISTING SYSTEMS OR DEVICES

Ricollegare gli impianti o le apparecchiature esistenti non rimosse

IT. No.

Art. n.

18 LS/AC

SEALING THE HOLES

BLDG 1191, 1192 1193, 1194

Sigillare i fori o gli attraversamenti

Edifici 1191, 1192 1193, 1194

IT. No.

Art. n.

19 LS/AC

FINAL TEST ELECTRICAL SYSTEM. SUBMITTAL ELECTRICAL

WORK CERTIFICATIONS.

BLDG 1191, 1192, 1193, 1194

Verifica impianto elettrico. Sottomissione delle dichiarazioni di conformità DM 37/08.

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

20 LS/AC

FOR OFFICIAL USE ONLY Sheet 12 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM

SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM.

Fornitura e posa in opera di cavo loop per allarme incendio EN

50200 - sezione 2x1 mmq.

IT. No. 21a m

FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM

SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM.

Fornitura e posa in opera di cavo loop per allarme incendio EN

50200 - sezione 2x1,5 mmq.

IT. No. 21b m

FURNISH AND INSTALL IN/OUT MODULE

Fornitura e posa in opera di modulo IN/OUT IT. No. 21c EA/NO

FURNISH AND INSTALL CONVENTIONAL MANUAL CALL

POINT - PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIB

T6

Fornitura e posa in opera di pulsante antincendio completo di cartello monitore - CE ATEX II2GD Ex d IIB T6

IT. No. 21d EA/NO

FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION

PROOF II 2GD Ex d IIC T6

Fornitura e posa in opera lampeggiatore luminoso rosso - CE

ATEX II 2GD Ex d IIC T6

IT. No. 21e EA/NO

FURNISH AND INSTALL SOUNDER - EXPLOSION PROOF II

2GD Ex d IIC T6

Fornitura e posa in opera avvisatore acustico - CE ATEX II 2GD

Ex d IIC T6

IT. No. 21f EA/NO

FURNISH AND INSTALL TRIPLE IR FLAME DETECTOR -

EXPLOSION PROOF Ex II 2GD

Fornitura e posa in opera di rivelatore di fiamma - CE ATEX Ex II

2GD

IT. No. 21g EA/NO

FOR OFFICIAL USE ONLY Sheet 13 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FURNISH AND INSTALL ADRESSABLE FIRE ALARM

CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH

BATTERIES AND ACCESSORIES, IN WATERPROOF BOX

Fornitura e posa in opera di centrale allarme incendio.

Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno.

IT. No. 21h EA/NO

FURNISH AND INSTALL GAS ALARM CONTROL PANEL.

EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND

ACCESSORIES, IN WATERPROOF BOX

Fornitura e posa in opera di centrale GAS. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno.

IT. No. 21i EA/NO

SUPPLY AND INSTALLATION OF TRANSMITTER MONACO.

COMPLETE WITH ANTENNA, cable, SPD, ECC., IN

WATERPROOF BOX

Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc., in contenitore stagno

IT. No. 21j EA/NO

FURNISH AND INSTALL JP8 FUEL GAS DETECTOR -

EXPLOSION PROOF Ex-d IIC 2GD T6

Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6

IT. No. 21k EA/NO

TEST AND CERTIFICATION OF THE NEW FIRE AND GAS

ALARM SYSTEM. BLDG 1191, 1192, 1193, 1194

Collaudo e certificazione del nuovo impianto allarme incendio e gas. Edifici 1191, 1192, 1193, 1194

IT. No. 21l LS/AC

LOUNDSPEAKERS

Altoparlanti IT. No. 22 EA/NO

TELECOM EQUIPMENT

Apparecchiatira telefonica IT. No. 23 EA/NO

COMMUNICATION CABLE CAT.6 UTP

cavo UTP cat.6, non schermato IT. No. 24 m

FOR OFFICIAL USE ONLY Sheet 14 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IDS PANEL

Quadro IDS IT. No. 25 EA/NO

TEST AND CERTIFICATION OF COMMUNICATION SYSTEM.

BLDG 1191, 1192, 1193, 1194

Collaudo e certificazione dell'impianto dati.

Edifici 1191, 1192, 1193, 1194

IT. No. 26 LS/AC

RECONNECT EXISTING COMMUNICATION SYSTEMS OR

DEVICES

BLDG 1191, 1192, 1193, 1194

Ricollegare l'impianto o le apparecchiature dati esistenti.

Edifici 1191, 1192, 1193, 1194

IT. No.

Art. n.

27 LS/AC

TOTAL PART IV / Totale Parte IV

REPAIR WORK SUMMARY / Riepilogo Lavori di

Ristrutturazione

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,9049€)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

FOR OFFICIAL USE ONLY Sheet 15 of 15

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1003

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A.

SUB TOTAL A.

B. REPAIR / Ristutturazione

SUB TOTAL B.

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,9049€)

AREA F, AVIANO AIR BASE, ITALY

NEW CONSTRUCTION / Nuova Costruzione

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

FOR OFFICIAL USE ONLY Sheet 1 of 1

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS € € € $

TOTAL LABOR COSTS € € € $

TOTAL OTHER DIRECT COSTS € € € $

TOTAL DIRECT COSTS € € € $

OVERHEAD % € € € $

SUBTOTAL € € € $

PROFIT % € € € $

TOTAL PRICE € € € $

DATE FIRM NAME

TITLE MANAGING DIRECTOR BY

INSTRUCTIONS TO OFFERORS

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

TOTAL A+B (€) TOTAL A+B ($)A. NEW CNSTR B. REPAIR

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data

(see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet-

SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

FOR OFFICIAL USE ONLY Sheet 1of 1

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS € € € $

TOTAL LABOR COSTS € € € $

TOTAL OTHER DIRECT COSTS € € € $

TOTAL DIRECT COSTS € € € $

OVERHEAD % € € € $

SUBTOTAL € € € $

PROFIT % € € € $

TOTAL PRICE € € € $

DATE FIRM NAME

TITLE MANAGING DIRECTOR BY

INSTRUCTIONS TO OFFERORS

RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY

TOTAL A+B (€) TOTAL A+B ($)A. NEW CNSTR B. REPAIR

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data

(see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet-

SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows: