ASHE_18-1003_Cost_Estimate_Breakdown.pdf
PDF 734 KB Posted
- Attached to
- ASHE 18-1003 RPR PASs ELEC SYSTEM AT SIERRA LOOP Federal contract opportunity
- Solicitation number
- FA5682-18-R-0019
About this file
CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ASHE18-1003_Add_2.pdf | ||
| FA568218R0019_0004.pdf | ||
| ASHE_18-1003_CCEB_Rev.1.xls | XLS spreadsheet | |
| ASHE_18-1003_WorkItems_Add_1.pdf | ||
| FA568218R0019_0003.pdf | ||
| FA568218R0019_0002.pdf | ||
| FA568218R0019_0001.pdf | ||
| Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| Design_Guides_Aviano.zip | ZIP file | |
| Attachment_3_ASHE_18-1003_Additional_Requirements.pdf | ||
| FA568218R0019.pdf | ||
| Door.pdf | ||
| Electrical.pdf | ||
| General.pdf | ||
| ASHE_18-1003_Tech_Specs_EN.pdf | ||
| Mechanical.pdf | ||
| Civil.pdf | ||
| Architectural.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
PROJECT : ASHE 18-1003
SUBMITTAL : 100%
SUBMITTAL DATE : DEC 2017
Cost Estimate Breakdown Preventivo Lista Lavori
Project : ASHE 18-1003 RPR PASs ELEC SYS Sierra, Fac 1191, 1192, 1193, & 1194
Location :
AREA F, AVIANO AB, ITALY.
Project Phase:
100% FINAL
Date:
DEC 2017
Prepared and Submitted by:
“HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT ASHE 18-1003 RPR PASs ELEC SYS SIERRA LOOP, 1191, 1192, 1193, 1194 AREA F AVIANO AIR BASE, I DECLARE THAT I HAVE ACCERTAINED THAT THE STRUCTURES AND THE
TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABILE ITALIAN NORMS.
DATE: DEC 2017
SIGNATURE
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
A.
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
NOT APPLICABLE
Non Applicabile
Total Architectural Work - Totale Lavori Architettonici
Ib Structural Work - Ib Lavori Strutturali
NOT APPLICABLE
Non Applicabile
Total Structural Work - Totale Lavori Strutturali
Ic Civil Work - Ic Lavori Civili
NOT APPLICABLE
Non Applicabile
Total Civil Work - Totale Lavori Civili
Id Mechanical Work - Ic Lavori Meccanici
NOT APPLICABLE
Non Applicabile
NEW CONSTRUCTION / Nuova Costruzione
FOR OFFICIAL USE ONLY Sheet 1 of 4
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Total Mechanical Work - Totale Lavori Meccanici
Ie Electrical Work - Ic Lavori Elettrici
NOT APPLICABLE
Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici
TOTAL PART I - Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
NOT APPLICABLE
Non Applicabile
Total Architectural Work - Totale Lavori Architettonici
IIb Structural Work - IIb Lavori Strutturali
NOT APPLICABLE
Non Applicabile
Total Structural Work - Totale Lavori Strutturali
IIc Civil Work - IIc Lavori Civili
NOT APPLICABLE
Non Applicabile
FOR OFFICIAL USE ONLY Sheet 2 of 4
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC System - IIIa Impianto di Condizionamento
NOT APPLICABLE
Non Applicabile
Total HVAC Systems - Totale Impianti HVAC
PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler
NOT APPLICABLE
Non Applicabile
Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici
NOT APPLICABLE
Non Applicabile
TOTAL PART IV / Totale Parte IV
FOR OFFICIAL USE ONLY Sheet 3 of 4
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,9049€)
PART IV - ELECTRICAL WORK
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
FOR OFFICIAL USE ONLY Sheet 4 of 4
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
B.
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
ASBESTOS REMOVAL. COMPLETE OF DUMP FEE
BLDG 1191, 1192, 1193, 1194
Rimozione amianto. Competo di oneri discarica.
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
1 LS/AC
WINCH, BASE AND METAL SCREEN REMOVAL
BLDG 1191, 1192, 1193, 1194
Rimozione verricello, basamento e schermo metallico
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
2a LS/AC
SENTRY BOX REMOVAL
BLDG 1191, 1192, 1193, 1194
Rimozione guardiole prefabbricate
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
2b LS/AC
Total Architectural Work - Totale Lavori Architettonici
Ib Structural Work - Ib Lavori Strutturali
PERFORATION METAL AND CONCRETE WALLS
BLDG 1191, 1192, 1193, 1194
Esecuzione di carrotaggi su pareti in metallo e calcestruzzo
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
1 LS/AC
REPAIR WORK / Lavori di Ristrutturazione
FOR OFFICIAL USE ONLY Sheet 1 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FOR MECHANICAL SYSTEMS: ENLARGE THE EXISTING
HOLE AT THE 800mm DIAMETER WITH INSERTION OF NEW
STEEL BARS
BLDG 1191,1192,1193 & 1194
Per impianti meccanici: ingrandire il foro esistente al diametro di
800mm con inserimento di nuove barre in acciaio
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
2 LS/AC
Total Structural Work - Totale Lavori Strutturali
Ic Civil Work - Ic Lavori Civili
Not Applicable
Non applicabile
Total Civil Work - Totale Lavori Civili
Id Mechanical Work- Id Lavori Meccanici
REMOVING EXISTING MECHANICAL INSTALLATIONS OF THE
MONO SPLIT SYSTEM AND OF THE AIR EXTRACTION.
COMPLETE PUBLIC LANDFILL CHARGES.
BLDG 1191,1192,1193 & 1194
Rimozione degli impianti meccanici esistenti del sistema mono split e dell'estrazione dell'aria.
Completo di oneri pubblica discarica.
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
1 LS/AC
Total Mechanical Work - Totale Lavori Meccanici
Ie Electrical Work - Ie Lavori Elettrici
FOR OFFICIAL USE ONLY Sheet 2 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION
SYSTEM. COMPLETE OF PUBBLIC DUMP FEE.
BLDG 1191,1192,1193 & 1194
Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.
Edifici 1191,1192,1193 & 1194
IT. No.
Art. n.
1 LS/AC
Total Electrical Work - Totale Lavori Elettrici
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural Work - IIa Lavori Architettonici
Not Applicable
Non applicabile
Total Architectural Work - Totale Lavori Architettonici
IIb Structural Work - IIb Lavori Strutturali
Not Applicable
Non applicabile
Total StructuralL Work - Totale Lavori Strutturali
IIc Civil Work - IIc Lavori Civili
FOR OFFICIAL USE ONLY Sheet 3 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
INSTALL DOOR SEALS - ANTI NAPALM GASKETS
BLDG 1191-1192-1193-1194
Installare nuove guarnizioni porta - guarnizione anti-napalm
Edifici 1191-1192-1193-1194
IT. No.
Art. n.
1 LS/AC
ADJUSTING EPOXY RESIN FLOOR COATING
BLDG 1191-1192-1193-1194
Ripristino della pavimentazione in resina eposidica
Edifici 1191-1192-1193-1194
IT. No.
Art. n.
2a SM/MQ
PAINT WALL AND DOORS SURFACES
BLDG 1191-1192-1193-1194
Verniciatura superfici pareti e porte
Edifici 1191-1192-1193-1194
IT. No.
Art. n.
2b SM/MQ
SURVEY OF UNDERGROUND PIPES (tav c-1) AND
INSTALLATION NEW MANHOLE - BLDG 1191-1192-1193-1194
Individuazione e ricerca delle tubazioni interrate (tav C-1) e installaizonje nuovo pozzetto - Edifici 1191-1192-1193-1194
IT. No.
Art. n.
3 LS/AC
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
PART IIIa - HVAC SYSTEMS / Parte IIIa - Impianti HVAC
FOR OFFICIAL USE ONLY Sheet 4 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
GALVANIZED SHEET METAL DUCT, COMPLETE BY
SUPPORTS AND ACCESSORIES.
BLDG 1191,1192,1193 & 1194
Canali in lamiera zincata, completo di staffaggi ed accessori.
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
1 KG/Kg
EXHAUST AIR MOTOR - 14000 mc/h – 1000 mm
BLDG1191,1192,1193 & 1194
Aspiratore antideflagrante - 14000 mc/h –10900 mm
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
2 EA/NO
EXHAUST AIR GRILL WHIT REGULATION DAMPER- 800x300 mm
BLDG 1191,1192,1193 & 1194
Griglia di estrazione aria con serranda di regolazione - 800x300 mm
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
3 EA/NO
CONTAINER FOR FILTERS IN LINE
BLDG 1191,1192,1193 & 1194
Contenitore per filtri in linea
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
4 EA/NO
FINAL TEST MECHANICAL SYSTEM. SUBMITTAL
MECHANICAL WORK CERTIFICATIONS.
BLDG 1191,1192,1193 & 1194
Verifica impianto meccanico. Sottomissione delle dichiarazioni di conformità DM 37/08.
Edificio 1191,1192,1193 & 1194
IT. No.
Art. n.
5 LS/AC
Total HVAC Systems - Totale Impianti HVAC
PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler
Not Applicable
Non applicabile
FOR OFFICIAL USE ONLY Sheet 5 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
ADJUSTING AND REVAMPING EXISTING AUTOMATIC
MOTOR SYSTEM AND EQUIPMENT - BLDG1191,1192,1193 &
Adeguamento e sistemazione impinto e apparecchiature per il controllo dei motori - edificio 1191, 1192, 1193 e 1194
IT. No.
Art. n.
1 EA/NO
ADJUSTING AND REVAMPING ELECTRICAL PANEL QBT
INSEDE BUILDING 15/71192-17/71193-18/71189 .SEE
DRAWING.
Adeguamento e sistemazione quadri elettrici esistenti QBT all'interno della cabina elettrica 15/71192-17/71193-18/71189.
Vedere disegni.
IT. No.
Art. n.
2 LS/AC
"MDP" ELECTRICAL PANEL - EXPLOSION PROOF.
BLDG 1191,1192,1193 & 1194
Quadro elettrico "MDP" tipo ATEX
EDIFICIO 1191,1192,1193 & 1194
IT. No.
Art. n.
3 EA/NO
"GEN" ELECTRICAL PANEL
Quadro elettrico "GEN"
IT. No.
Art. n.
4a EA/NO
TRANSFORMER
Trasformatore
IT. No.
Art. n.
4b EA/NO
FOR OFFICIAL USE ONLY Sheet 6 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN
WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE
"HDPE DIAM. 90
Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 90
IT. No.
Art. n.
5 m
ELECTRICAL CABLE FG7R 1x35mmq
Cavo elettrico FG7R 1x35mmq
IT. No.
Art. n.
6a m
ELECTRICAL CABLE FG7R 1x25mmq
Cavo elettrico FG7R 1x25mmq
IT. No.
Art. n.
6b m
ELECTRICAL CABLE FG7R 1x16mmq
Cavo elettrico FG7R 1x16mmq
IT. No.
Art. n.
6c m
AUXILIARY ELECTRICAL CABLE WITH FG16OR16
Collegamento ausiliari con cavo FG16OR16
IT. No.
Art. n.
7a LS/AC
ELECTRICAL CABLE FG16OR16 3G1,5mmq
Cavo elettrico FG16OR16 3G1,5mmq
IT. No.
Art. n.
7b m
ELECTRICAL CABLE FG16OR16 3G2,5mmq
Cavo elettrico FG16OR16 3G2,5mmq
IT. No.
Art. n.
7c m
ELECTRICAL CABLE FG16OR16 3G4mmq
Cavo elettrico FG16OR16 3G4mmq
IT. No.
Art. n.
7d m
ELECTRICAL CABLE FG16OR16 3G6mmq
Cavo elettrico FG16OR16 3G6mmq
IT. No.
Art. n.
7e m
ELECTRICAL CABLE FG16OR16 5G4mmq
Cavo elettrico FG16OR16 5G4mmq
IT. No.
Art. n.
7f m
ELECTRICAL CABLE FG16OR16 5G6mmq
Cavo elettrico FG16OR16 5G6mmq
IT. No.
Art. n.
7g m
FOR OFFICIAL USE ONLY Sheet 7 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PRECAST REINFORCED CONCRETE MANHOLES WITH
MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND
INFORMATION GROUNDING SYSTEM.
Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra.
IT. No. 8a EA/NO
PRECAST REINFORCED CONCRETE MANHOLES WITH
MANHOLE DRIVEWAY VIBRATED BY 60X60X60X5cm, Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 60x60x60x5cm, IT. No. 8b EA/NO
BURRIED GROUND CABLE - 95mmq COPPER
Corda di rame nuda 95mmq interrata
IT. No.
Art. n.
9 m
HOT GALVANISED STEEL STRIP - 40x4mm
Barra di terra in acciaio zincato - 40x4mm
IT. No.
Art. n.
10a m
GALVANIZED STEEL ROUND WIRE - D.8mm
Tondino in acciaio zinacato - D.8mm
IT. No.
Art. n.
10b m
PICKING-UP ROD H=2,5m
Asta di captazione H=2,5m
IT. No.
Art. n.
10c EA/NO
NEW EQUIPOTENTIONAL CONNECTIONS SEE DROWING
Collegamenti equipotenziali come da disegni elettrici
IT. No.
Art. n.
10d LS/AC
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 1/2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1/2 pollice
IT. No. 11a m
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 3/4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 3/4 pollice
IT. No. 11b m
FOR OFFICIAL USE ONLY Sheet 8 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 1 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice
IT. No. 11c m
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 1"1/4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice e 1/4
IT. No. 11d m
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 1"1/2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 1 pollice e 1/2
IT. No. 11e m
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 2 pollicI
IT. No. 11f m
FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI
7683) - 3 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) -diametro 3 pollicI
IT. No. 11g m
CABLE TRAY 100X75mm + 200X75mm
Canale metallico 100x75mm + 200X75mm IT. No. 12 m
180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION
PROOF II2GD Ex de IIC T5
Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5
IT. No. 13a EA/NO
FOR OFFICIAL USE ONLY Sheet 9 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
LIGHTING FIXTURE SLED 400 WITH LIGHT BEAM
OPERATING - TYPE II 2GD Ex-de IIB T5/T6 - CORTEM SLED-
400W Proiettore LED 194W (20000 lm; 194W).
Proiettore sled 400W con fascio luminoso - tipo ii 2gd ex-de iib t5/t6 100 cortem sled-400w proiettore led 194w (20000 lm; 194w).
IT. No. 13b EA/NO
LED LIGHTING FIXTURE 1x22W - TYPE II 2GD Ex-d IIC T6 -
FLFE-122L (GE) CORTEM TYPE (1731lm; 22W) ONLY
EMERGENCY.
Plafoniera a led 1x22W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-
122L (GE) TYPO CORTEM (1731lm; 22W)
IT. No. 13c EA/NO
LED LIGHTING FIXTURE 2x31W -TYPE II 2GD Ex-d IIC T6 -
FLFE-231L (GE) CORTEM TYPE (5414 lm; 52.0 W).
Plafoniera a led 2x31W - tipo TIPO II 2GD Ex-d IIC T6 - FLFE-
231L (GE) TYPO CORTEM (5414lm; 52W)
IT. No. 13d EA/NO
EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66
Proiettore asimmetrico industriale da esterno a LED - 92W - IP66 IT. No. 13e EA/NO
FLUORESCENT EMERGENCY LIGHTING FIXTURE 1x18W - Ex-d, WITH KIT EMERGENCY-150', WITH EMERGENCY EXIT
SIGN - CORTEM EVF-18EX TYPE
Plafoniera di emergenza per lampade, fluorescenti 1x18w-ex-d-completa di kit di emergenza -150', segnaletica per uscite di emergenza.
IT. No. 13f EA/NO
PHOTOCELL SWITCH
Sensore crepuscolare IT. No. 14 EA/NO
INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF
II2GD Ex de IIC T5
Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC
T5
IT. No. 15a EA/NO
FOR OFFICIAL USE ONLY Sheet 10 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
INTERLOCKED OUTLET 2P+G 16A 110V - EXPLOSION PROOF
II2GD Ex de IIC T5
Presa interbloccata 2P+G 16A 110V - CE ATEX II2GD Ex de IIC
T5
IT. No. 15b EA/NO
INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH
CIRCUIT BREAKER - GENERATOR.
Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - Generatore
IT. No. 15c EA/NO
OUTLET OR FM SUPPLY POINT
Punto di alimentazione prese o FM IT. No. 15d EA/NO
LIGHTING SUPPLY POINT
Punto di alimentazione illuminazione.
IT. No. 15e EA/NO
JUNCTION BOX FOR INSTALLATION OF COMMUNICATION
EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON
FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT)
TRAILING SOCKETS, N.8 CABLE GLANDS (ELECTRICAL SET
UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm -
EXPLOSION PROOF II2GD Ex d IIB T5/T6
Custodia per apparati impianto dati. Completa di int.
magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 8 pressavavi per futuri punti di ingresso, barra di terra. -dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB
T5/T6
IT. No. 16a EA/NO
CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4
PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6
Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC
T5/T6
IT. No. 17a EA/NO
FOR OFFICIAL USE ONLY Sheet 11 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
N°3 MOTION SELECTOR HOMING
(MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES
AND JUNCTION BOX - IP65
Selettore di comando luci a tre posizioni
(manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65
IT. No. 17b EA/NO
N°3 MOTION SELECTOR HOMING
(MANUAL/STOP/AUTOMATIC) FOR LIGHTS. INSTAL CABLES
AND JUNCTION BOX - IP65
Selettore di comando luci a tre posizioni
(manuale/stop/automatico) per accensione luci. installare scatole e cavi elettrici - IP65
IT. No. 17c EA/NO
OCCUPANCY SENSORS
Sensori di presenza
IT. No.
Art. n.
17d EA/NO
RECONNECT EXISTING SYSTEMS OR DEVICES
Ricollegare gli impianti o le apparecchiature esistenti non rimosse
IT. No.
Art. n.
18 LS/AC
SEALING THE HOLES
BLDG 1191, 1192 1193, 1194
Sigillare i fori o gli attraversamenti
Edifici 1191, 1192 1193, 1194
IT. No.
Art. n.
19 LS/AC
FINAL TEST ELECTRICAL SYSTEM. SUBMITTAL ELECTRICAL
WORK CERTIFICATIONS.
BLDG 1191, 1192, 1193, 1194
Verifica impianto elettrico. Sottomissione delle dichiarazioni di conformità DM 37/08.
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
20 LS/AC
FOR OFFICIAL USE ONLY Sheet 12 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM
SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN
50200 - sezione 2x1 mmq.
IT. No. 21a m
FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM
SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN
50200 - sezione 2x1,5 mmq.
IT. No. 21b m
FURNISH AND INSTALL IN/OUT MODULE
Fornitura e posa in opera di modulo IN/OUT IT. No. 21c EA/NO
FURNISH AND INSTALL CONVENTIONAL MANUAL CALL
POINT - PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIB
T6
Fornitura e posa in opera di pulsante antincendio completo di cartello monitore - CE ATEX II2GD Ex d IIB T6
IT. No. 21d EA/NO
FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION
PROOF II 2GD Ex d IIC T6
Fornitura e posa in opera lampeggiatore luminoso rosso - CE
ATEX II 2GD Ex d IIC T6
IT. No. 21e EA/NO
FURNISH AND INSTALL SOUNDER - EXPLOSION PROOF II
2GD Ex d IIC T6
Fornitura e posa in opera avvisatore acustico - CE ATEX II 2GD
Ex d IIC T6
IT. No. 21f EA/NO
FURNISH AND INSTALL TRIPLE IR FLAME DETECTOR -
EXPLOSION PROOF Ex II 2GD
Fornitura e posa in opera di rivelatore di fiamma - CE ATEX Ex II
2GD
IT. No. 21g EA/NO
FOR OFFICIAL USE ONLY Sheet 13 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FURNISH AND INSTALL ADRESSABLE FIRE ALARM
CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH
BATTERIES AND ACCESSORIES, IN WATERPROOF BOX
Fornitura e posa in opera di centrale allarme incendio.
Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno.
IT. No. 21h EA/NO
FURNISH AND INSTALL GAS ALARM CONTROL PANEL.
EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND
ACCESSORIES, IN WATERPROOF BOX
Fornitura e posa in opera di centrale GAS. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori, in contenitore stagno.
IT. No. 21i EA/NO
SUPPLY AND INSTALLATION OF TRANSMITTER MONACO.
COMPLETE WITH ANTENNA, cable, SPD, ECC., IN
WATERPROOF BOX
Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc., in contenitore stagno
IT. No. 21j EA/NO
FURNISH AND INSTALL JP8 FUEL GAS DETECTOR -
EXPLOSION PROOF Ex-d IIC 2GD T6
Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6
IT. No. 21k EA/NO
TEST AND CERTIFICATION OF THE NEW FIRE AND GAS
ALARM SYSTEM. BLDG 1191, 1192, 1193, 1194
Collaudo e certificazione del nuovo impianto allarme incendio e gas. Edifici 1191, 1192, 1193, 1194
IT. No. 21l LS/AC
LOUNDSPEAKERS
Altoparlanti IT. No. 22 EA/NO
TELECOM EQUIPMENT
Apparecchiatira telefonica IT. No. 23 EA/NO
COMMUNICATION CABLE CAT.6 UTP
cavo UTP cat.6, non schermato IT. No. 24 m
FOR OFFICIAL USE ONLY Sheet 14 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
IDS PANEL
Quadro IDS IT. No. 25 EA/NO
TEST AND CERTIFICATION OF COMMUNICATION SYSTEM.
BLDG 1191, 1192, 1193, 1194
Collaudo e certificazione dell'impianto dati.
Edifici 1191, 1192, 1193, 1194
IT. No. 26 LS/AC
RECONNECT EXISTING COMMUNICATION SYSTEMS OR
DEVICES
BLDG 1191, 1192, 1193, 1194
Ricollegare l'impianto o le apparecchiature dati esistenti.
Edifici 1191, 1192, 1193, 1194
IT. No.
Art. n.
27 LS/AC
TOTAL PART IV / Totale Parte IV
REPAIR WORK SUMMARY / Riepilogo Lavori di
Ristrutturazione
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,9049€)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
FOR OFFICIAL USE ONLY Sheet 15 of 15
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1003
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
A.
SUB TOTAL A.
B. REPAIR / Ristutturazione
SUB TOTAL B.
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,9049€)
AREA F, AVIANO AIR BASE, ITALY
NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
FOR OFFICIAL USE ONLY Sheet 1 of 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS € € € $
TOTAL LABOR COSTS € € € $
TOTAL OTHER DIRECT COSTS € € € $
TOTAL DIRECT COSTS € € € $
OVERHEAD % € € € $
SUBTOTAL € € € $
PROFIT % € € € $
TOTAL PRICE € € € $
DATE FIRM NAME
TITLE MANAGING DIRECTOR BY
INSTRUCTIONS TO OFFERORS
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
TOTAL A+B (€) TOTAL A+B ($)A. NEW CNSTR B. REPAIR
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet-
SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
FOR OFFICIAL USE ONLY Sheet 1of 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS € € € $
TOTAL LABOR COSTS € € € $
TOTAL OTHER DIRECT COSTS € € € $
TOTAL DIRECT COSTS € € € $
OVERHEAD % € € € $
SUBTOTAL € € € $
PROFIT % € € € $
TOTAL PRICE € € € $
DATE FIRM NAME
TITLE MANAGING DIRECTOR BY
INSTRUCTIONS TO OFFERORS
RPR PASs ELEC SYS ,Sierra, Fac 1191,1192,1193 & 1194 AREA F, AVIANO AB, ITALY
TOTAL A+B (€) TOTAL A+B ($)A. NEW CNSTR B. REPAIR
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet-
SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
FOR OFFICIAL USE ONLY Sheet 1of 1