Project ASHE 16-1037 Technical Specifications
DATE: DEC 2015
31CES/CENMP 1
DATE: DIC 2015
U.S. AIR FORCE
ST
FIGHTER WING
ST
CES/CENM
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATIONS FOR
ASHE 16-1037
RENOVATE FAC. 1381 FOR 606 ACS BED DOWN,
AREA F, AVIANO AB, ITALY
31CES/CENMP 2
1. SCOPE OF WORK: The scope of the project is to adequate the facility n.1381 to the 606th
ACS bed down, with the following works:
exterior and interior painting, replace carpet with tile floor. Repair exterior doors.
Repair the following utilities: HVAC sys, electrical sys, COM/Data system, fire sys. Update plumbing (previous occupants reported toilets overflowing and flooding building on a weekly basis).
Renovations required as part of the 606 ACS move from Spangdahlem AB, Germany to Aviano
AB, Italy in accordance with the European Infrastructure Consolidation, and USAFE PPlan 5135-
15: Relocation of the 606th Air Control Squadron..
2. WORKS LOCATION: Works has to be done at Fac. # 1381, Area F, Aviano Air Base, Italy.-
31CES/CENMP 3
SITE PLAN
31CES/CENMP 4
FACILITY # 1381- FLOOR PLAN
31CES/CENMP 5
COMMUNICATION REQUIREMENTS- FLOOR PLAN
2 3
Room 1:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x Leadership Room 2:
1x SIPR CPU Drop 1x SIPR Phone Drop 1x SIPR Phone Line 2x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x Conference Room Room 3:
1x SIPR CPU Drop 1x SIPR Phone Drop 1x SIPR Phone Line 4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x CC Room 4:
12x NIPR CPU Drops 10x Phone Drops 5x Phone Lines 4x CSS/ Temp DET 1 Room 5:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x CEM Room 6:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x 1st Sgt
Note: This is the facility projected for the ADVON/detachment operations upon arrival.
The personnel reflected for each office will vary as additional personnel arrive.
Total NIPR CPU Drops = 30 Total Phone Drops = 20
31CES/CENMP 6
VIEWS
31CES/CENMP 7
31CES/CENMP 8
31CES/CENMP 9
EXISTING ELECTRICAL PANELS
31CES/CENMP 10
EXISTING TOILETS
31CES/CENMP 11
3. WORK SITE CONDITIONS:
a. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
b. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08.00 to 17.00 hours. Work during week-ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.
c. Toilet facilities in the vicinity of the work site shall not be available for Contractor use. The
Contractor shall provide toilet facilities for use on the site
d. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.
e. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.M.
81/08.
f. If welding is to be performed the Contractor shall ensure a welding permit is obtained from the
Aviano Air Base Fire Department prior to performing welding operations.
g. At least 5 days prior to the pre-final inspection, the Contractor shall furnish to the Contracting
Officer all installed equipment operation and maintenance documentation, certificates concerning installed systems as required by host country laws, test reports and results and as built drawings where required by host nation laws.
31CES/CENMP 12
4. WORK DESCRIPTION:
Each item of the schedule is inclusive of furnishing and installation of materials and equipment, scaffolding, transportation to dump, and storage of demolished and/or removed materials, in accordance with contracting officer’s instructions and all finishing work required to make each item complete in a workmanlike manner.
All the quantities that are indicated or successively added are estimates. Therefore the government shall not be held responsible for the accuracy of the estimated quantities.
The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if it not mentioned in the specifications but included in the drawings or manifestly necessary to deliver a complete project based on its overall scope.
4a. Removal of existing carpet, base board and transportation of the material to authorized public dump
L.S.
4b. Removal all sanitary, sinks, faucets and plumbing components in the bathrooms and transportation of the material to authorized public dump.
4c. Removal toilets equipment: paper towel dispenser, mirrors, hand dryers, wood panel for disengagement of the urinal in man toilet and transportation of the material to authorized public dump.
4d. Removal existing electrical panels, lines of 110V/220V, outlets 110 V, external light, exit sign led and transportation of the material to authorized public dump.
4e. Removal of fire component (detectors, alarms and cabling) and transportation of the material to authorized public dump.
4f. Removal existing A/C units and transportation of the material to authorized public dump.
Ea. 2
4g. Removal existing double door main entrance and all tool and transportation of the material to authorized public dump.
4h. Removal of wall/floors ceramic tiles in bathrooms, plumbing line, floor drain and transportation of the material to authorized public dump.
31CES/CENMP 13
4i. Removal existing outlets 110 V. and transportation of the material to authorized public dump.
4j. Furnishing and installation of new ceramic tile size 30x30 cm. , item includes repair and levelling floor surfaces and adhesive for installation.
Sq.m. 240,00
4k. Furnishing and installation of new wall/floor ceramic tile size 20x20 cm. in the bathrooms, item includes adhesive for installation.
Sq.m. 70,00
4l. Furnishing and installation of new wood base board h= 7 cm. , 1 cm. thk.
L.M. 170,00
4m. Furnishing and installation anodized aluminum double door of main entrance ,size 160x220 cm., the opening will be controlled by keyboard numeric code. The article includes top thermopane glass 6 + 12 + 6 mm., blind transom, door closers, panic hardware, adjustable hinges min. 3 ea., electrical power supply line and any other item required for installation in a workmanlike manner.
EA. 1
4n. Furnishing and installation of new electrical panel line 220V, item include electrical lines connection, switches , plate cover for removed 110V outlets any other item required for installation in a workmanlike manner.
Ea. 1
4o. Furnishing and installation of new Communications system composed by phone lines, NIPR SPU drops, SIPR CPU drops, SIPR Phone drop, phone drops as shown in attached
“Communication Requirements – Floor Plan”. Contractor is allowed to use existing equipment
(outlet, distribution boxes and ducts, cable tray, patch panels, main cabinets, etc) if operational and in accordance with Base Standard and Communication requirements. Item includes cabling, outlets, main panel, patch panels, terminations, connections, and every other item to provide an operational system as required and a job in a workmanlike manner.
4p. Furnishing and installation of new exterior led light 10W type DISANO “Lord” with crepuscular manual overider swich on main entrance / exit doors, exit sign led, occupancy sensor, item includes upgraded of electrical lines.
Ea.
31CES/CENMP 14
4q. Furnish and installation of new sanitary in two toilets, faucets and any other item required for an installation in a workmanlike manner.
- Sink Ea. 2
- Tank Ea. 1
- Urinal Ea.1
- w.c. Ea. 2
4r. Furnish and installation plumbing system line and any other item required for
An installation in a workmanlike manner:
- Pvc pipe waste water draining dia 110 mm. L.M. 4,00
- Pvc pipe dia. 60 mm. for connection floor drain L.M.3,00
- New floor drain with siphon Ea. 2
4s. Furnising and installation A/C unit fixed wall, mono split inverter, heat pump, power 12,000
Btu / h Class A ++. Item includes connection to existing electrical /condensate lines and any other item required for installation in a workmanlike manner.
Ea. 2
4t. Furnishing and installation of new toilets equipment:
1. Mirrors with light Ea.2
2. Paper towel dispenser Ea.2
3. Trash Ea.2
4. Towels electrical Ea. 2
5. Aluminum panel for disengagement of the urinal in man toilet Ea. 1
6. Sitting w.c. EA.2
4u. Furnishing and installation of new fire component:
- Alarms
- Detectors
- Cabling any other item required to provide a fully operational system and for a job in a workmanlike manner.
4v. Paint interior wall surfaces with two hand washable paint, item includes repairing of surfaces before installation of paint.
Sq.m. 505,00
4z. Painting with 3 hand of washable emulsion paint for exterior surfaces, item includes the preventive washing of the walls with a pressure washer.
Sq.m. 300,00