ASHE_16-1037_Construction_Cost_Est_Breakdown.xlsx
XLSX spreadsheet 101 KB Posted
- Solicitation number
- FA5682-16-T-0002
About this file
ASHE 16-1037 CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 16-1037
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| EIC. RENOVATE FAC. #1381 FOR 606 ACS BED DOWN | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| ASHE 16-1037 | FAC. # 1381 - AREA F | ||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||
| LINE ITEM NO. | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | MANHOUR MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |
| 1 | REMOVAL CARPET | 4a. | L.S. | 1 | |||||||
| 2 | REMOVAL SANITARY | 4b. | L.S. | 1 | |||||||
| 3 | REMOVAL TOILETS EQUIPMENT | 4c. | L.S. | 1 | |||||||
| 4 | REMOVAL ELECTRICAL PANEL | 4d. | L.S. | 1 | |||||||
| 5 | REMOVAL FIRE COMPONENTS | 4e. | L.S. | 1 | |||||||
| 6 | REMOVAL A/C UNITS | 4f. | L.S. | 1 | |||||||
| 7 | REMOVAL DOUBLE DOOR | 4g. | L.S. | 1 | |||||||
| 8 | REMOVAL WALL/FLOOR CERAMIC TILE | 4h. | L.S. | 1 | |||||||
| 9 | REMOVAL OUTLETS 110 V. | 4i. | L.S. | 1 | |||||||
| 10 | INSTALLATION CERAMIC TILES 30X30 CM. | 4j. | Sq.m. | 240 | |||||||
| 11 | INSTALLATION CERAMIC TILES 20X20 CM. | 4k. | Sq.m. | 70 | |||||||
| 12 | INSTALLATION BASE BOARD | 4l. | L.M. | 170 | |||||||
| 13 | INSTALLATION ALUMINUM DOUBLE DOOR | 4m. | Ea. | 1 | |||||||
| 14 | INSTALLATION ELECTRICAL PANEL | 4n. | Ea. | 1 | |||||||
| 15 | INSTALLATION NEW COMMUNICATION SYSTEM | 4o. | L.S. | 1 | |||||||
| 16 | INSTALLATION EXTERIOR LED LIGHTS | 4p. | Ea. | 2 | |||||||
| 17 | INSTALLATION SANITARY | 4q. | L.S. | 1 | |||||||
| 18 | INSTALLATION PVC PIPES | 4r. | L.S. | 1 | |||||||
| 19 | INSTALLATION A/C UNITS | 4s. | Ea. | 2 | |||||||
| 20 | INSTALLATION TOILETS EQUIPMENT | 4t. | L.S. | 1 | |||||||
| 21 | INSTALLATION FIRE COMPONENT | 4u. | L.S. | 1 | |||||||
| 22 | PAINT INTERIOR WALL | 4v. | Sq.m. | 505 | |||||||
| 23 | PAINT EXTERIOR WALL | 4z. | Sq.m. | 300 | |||||||
| 0.00 | 0.00 | € - 0 | |||||||||
| RATE 1$= € 0.9049 | $ - 0 |
&12FOR OFFICIAL USE ONLY
&12 FOR OFFICIAL USE ONLY Sheet &P of &N