ASHE_16-1037_Fac_1381_Comm_Requirements.pdf
PDF 75 KB Posted
- Solicitation number
- FA5682-16-T-0002
About this file
ASHE 16-1037 Fac 1381 COMM REQUIREMENTS
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3
Room 1:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x Leadership Room 2:
1x SIPR CPU Drop 1x SIPR Phone Drop 1x SIPR Phone Line 2x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x Conference Room Room 3:
1x SIPR CPU Drop 1x SIPR Phone Drop 1x SIPR Phone Line 4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x CC Room 4:
12x NIPR CPU Drops 10x Phone Drops 5x Phone Lines 4x CSS/ Temp DET 1 Room 5:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x CEM Room 6:
4x NIPR CPU Drops 2x Phone Drops 2x Phone Lines 1x 1st Sgt
Note: This is the facility projected for the ADVON/detachment operations upon arrival.
The personnel reflected for each office will vary as additional personnel arrive.
Total NIPR CPU Drops = 30 Total Phone Drops = 20
Slide Number 1
File details come from the government source that posted it. Updated .