ADDENDUM 1 DATED 10 FEBRUARY 2016 TO TECHNICAL SPECIICATIONS -REVISION 2

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 10 February 2016 1 Technical Specifications-Revision 2

TECHNICAL SPECIFICATIONS FOR

ASHE 16-1037

RENOVATE FAC. 1381 FOR 606 ACS BED DOWN,

AREA F, AVIANO AB, ITALY-REVISION 2

ADDENDUM #1_____________________________________________________________________

Paragraph 2.WORKS LOCATION:

-After Fac.#13809 add the following: “and at Fac#1380”.

-Communication Requirements-Floor Plan: be advised that the

- ” Number of NIPR CPU Drops has to be read E.a. 37”

- Given list shall mention 7 additional drops as follows (blue colour)

COMMUNICATION REQUIREMENTS-FLOOR PLAN-REPLACING FLOOR PLAN

PAGE 5 OF TECHNICAL SPECIFICATIONS –REVISION 2

Date: 10 February 2016 2 Technical Specifications-Revision 2

Paragraph 4. WORK DESCRIPTION:

Item 4m., changes as following:

Furnishing and installation anodized aluminum double door of main entrance, size 180x240 cm., the opening will be controlled by keyboard numeric code. The article includes top thermopane glass 6 + 12 + 6 mm., blind transom, door closers, panic hardware, adjustable hinges min. 3 ea., electrical power supply line, removal/reinstallation part of false ceiling which interferes with door installation and any other required for installation in a workmanlike manner.

Ea. 1

Item 4o., add the following:

“Number of NIPR CPU drops is Ea. 34 more Ea. 3 in room n.4 for a total Ea.37, not to consider different notes. All SIPR CPU drops will be in view, cable Cat IV and quad-ports for wall jacks”.

Item 4p., after DISANO “Lord” add the following:

“or equal”.

Item 4u., add the following:

The Fire Alarm System will be connected to central of fac. 1380, all new components will remain in the same position.

Item 4x., add the following:

The power of the new MDP is approx. 1950 A. The power of the three (3) transformers is 150/200/700 A. The size of the manual switch has to be the same of new MDP. The outlets 3P+N+G 100A that have to be installed in the 12 panels must be heavy duty standard Europeo (CEE).