AMENDMENT_OF_SOLICITATION_FA5682-16-T-0002.pdf
PDF 32 KB Posted
- Solicitation number
- FA5682-16-T-0002
About this file
AMENDMENT 1 OF SOLICITATION FA5682-16-T-0002
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A26007A002 ASHE 16-1037
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes as indicated below and in the following pages:
Section A: Change document title in Block 10;
Section B: Change the extended description of item 0001 to reflect the revised Technical Specifications;
Section J: Incorporate the revised Technical Specifications;
Section L: Change one provision to full text and change provision L-01, paragraph 1(d).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-T-0002
X 9B. DATED (SEE ITEM 11)
28-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Feb-2016
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5682-16-T-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required performance has changed from TECHNICAL SPECIFICATIONS FOR
ASHE16-1037 RENOVATE FAC.1381 FOR 606 ACS BED DOWN, AREA F, AVIANO AB,
ITALY-REVISION 1 1. SEE SECTION J FOR APPLICABLE DOCUMENTS IDENTIFYING
NUMBER AND DATE.2. SEE SECTION L PROVISION 52.236-27 FOR SITE VISIT TIME
AND PLACE OF CONVENING.3. THE MAGNITUDE OF THIS PROJECT IS BETWEEN
$25,000 AND $100,000.4. NOTICE TO OFFERORS: FUNDS ARE NOT PRESENTLY
AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS
SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE BID ACCEPTANCE PERIOD
SHOULD BE VALID THROUGH 30 SEPTEMBER 2016. THE GOVERNMENT RESERVES
THE RIGHT TO CANCEL THIS SOLICITATION. to TECHNICAL SPECIFICATIONS FOR
ASHE16-1037 RENOVATE FAC.1381 FOR 606 ACS BED DOWN, AREA F, AVIANO AB,
ITALY-REVISION 21. SEE SECTION J FOR APPLICABLE DOCUMENTS IDENTIFYING
NUMBER AND DATE.2. SEE SECTION L PROVISION 52.236-27 FOR SITE VISIT TIME
AND PLACE OF CONVENING.3. THE MAGNITUDE OF THIS PROJECT IS BETWEEN
$25,000 AND $100,000.4. NOTICE TO OFFERORS: FUNDS ARE NOT PRESENTLY
AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS
SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE BID ACCEPTANCE PERIOD
SHOULD BE VALID THROUGH 30 SEPTEMBER 2016. THE GOVERNMENT RESERVES
THE RIGHT TO CANCEL THIS SOLICITATION..
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS,TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY
WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW AND
STRICTLY IN ACCORDANCE WITH TH TERMS AND CONDITSIONS OF THIS CONTRACT INCLUDING
THE FOLLOWING ATTACHED DOCUMENTS:A.TECHNICAL SPECIFICATIONS FOR ASHE 16-1037
RENOVATE FAC.1381 FOR 606 ACS BED DOWN, AREA F, AVIANO AB, ITALY-REVISION 1 DATED DEC 2015 AND MARKED TECHNICAL SPECIFICATIONS -REVISION 1 - 14 PAGES INCLUDING THE COVER PAGE;B. ADDITIONAL REQUIREMENTS, DATED 27 JANUARY 2016 - 3 PAGES to THE
CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS,TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED
DOCUMENTS:A.TECHNICAL SPECIFICATIONS FOR ASHE 16-1037 RENOVATE FAC.1381 FOR 606 ACS BED DOWN, AREA F, AVIANO AB, ITALY-REVISION 2 DATED FEB 2016 AND MARKED TECHNICAL
SPECIFICATIONS -REVISION 2 - 15 PAGES INCLUDING THE COVER PAGE;B. ADDITIONAL
REQUIREMENTS, DATED 27 JANUARY 2016 - 3 PAGES.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specification for ASHE 16-1037 Renovate Fac. 1381 for 606 ACS Bed Down, Area F, Aviano AB, Italy- Revision 2, dated February 2016 and marked Technical Specifications –Revision 2
- 15 pages including the cover page;
b. Attachment 2:
Additional Requirements, dated 27 January 2016
- 3 pages
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents shall be submitted and shall constitute the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate breakdown- Revision 2 shall be returned in their entirety.
2. TECHNICAL ACCEPTABILITY
Submit current SOA certification for category OG01 and classification adequate to cover offeror’s amount for project performance.
The following were previously included by reference and are now included by full text:
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .