CCEB_blank.xls

XLS spreadsheet 235 KB Posted

Attached to
Replace Piping Connections, Multi, Area F, Aviano Air Base, Aviano AB
Solicitation number
FA5682-16-R-0009
Issued by

About this file

Construction Cost Estimate

View the file

Other files

File Type Posted
Amendment_FA5682-16-R-0009-0004.pdf PDF
Amendment_FA5682-16-R-0009-0004.pdf PDF
CCB_blank_Revision_2_-_09_May_2016.pdf PDF
Amendment_FA5682-16-R-0009-0003.pdf PDF
ASHE_16-1021_TEC_SPECS_rev2_date_04_may_2016.pdf PDF
BLDG_1480-81-82-83_Existing_HVAC_SYSTEM.pdf PDF
Amendment_FA682-16-R-0009-0002.pdf PDF
M1_ASHE_16-1021.pdf PDF
ASHE_16-1021_TEC_SPECS_Rev_1_date_20_April_2016.pdf PDF
BLDG_1484_Existing_HVAC_SYSTEM.pdf PDF
Amendment_FA682-16-R-0009-0001.pdf PDF
ADDITIONAL_REQUIREMENTS_23_Mar_2016.doc DOC document
ASHE_16-1021_TEC_SPECS_revised_23_Mar_2016.pdf PDF
Solicitation_FA5682-16-R-0009.pdf PDF
CCB_blank_22_Mar_2016.xls XLS spreadsheet
MAB.4.001.pdf PDF
MAB.4.023.pdf PDF
MAB.4.004.pdf PDF
MAB.4.025.pdf PDF
MAB.4.021.pdf PDF
MAB.4.002.pdf PDF
MAB.4.014.pdf PDF
MAB.4.022.pdf PDF
MAB.4.015.pdf PDF
MAB.4.003.pdf PDF
BLDG_3 4.pdf PDF
MAB.4.011.pdf PDF
MAB.4.013.pdf PDF
BLDG_1 2.pdf PDF
MAB.4.024.pdf PDF
MAB.4.005.pdf PDF
MAB.4.012.pdf PDF
ASHE_16-1021_TEC_SPECS.pdf PDF
15050_en.doc DOC document
15080_en.doc DOC document
01100_en.doc DOC document
15950_en.doc DOC document
01101R_en.docx DOCX document
15601_en.doc DOC document
15400_en.doc DOC document
16402_en.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Items

CONSTRUCTION COST BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 16-1021 REPLACE HVAC PIPING CONNECTION MULTI, AREA F
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 16-1021AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I – DEMOLITIONS AND REMOVALS
Ia - Architectural Works
not applicable
Ib - Structural Works
not applicable
Ic – Civil Works
not applicable
Id - Mechanical Works
not applicable, minor item included into construction work
Ie - Electrical Works
not applicable
PART II – ARCHITECTURAL, CIVIL and STRUCTURAL WORK
IIa - Architectural Works
1RPR suspend ceiling
IIb - Structural Works
not applicable
IIc - Civil Work
not applicable
PART III – MECHANICAL WORK
1buildings 1480/81/82/83ls1.00
building 1484ls1.00
PART IV – ELECTRICAL WORK
not applicable
Total EURO0.000.000.000.000.000.00
0.000.000.000.00

&C&12FOR OFFICIAL USE ONLY

&C &12FOR OFFICIAL USE ONLY&RSheet &P of &N

File details come from the government source that posted it. Updated .