AMENDMENT FA5682-16-R-0009-0004
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A26068A001 ASHE 16-1021
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
- change the closing date for receipt of offers;
- change the number of days for Government acceptance of offers;
- replace the Construction Cost Estimate Breakdow n
- add clauses to Section I as indicated in the below Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-R-0009
X 9B. DATED (SEE ITEM 11)
05-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-May-2016
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5682-16-R-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-May-2016 04:00 PM to 12-May-2016 04:00 PM.
The offeror acceptance period has decreased by 1 from 265 to 264.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The NSN has changed from Z1NB-ST-RAD-DLEE to Z2NB-ST-RAD-DLEE.
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW
AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS PROJECT
ASHE 16-1021 REPLACE PIPING CONNECTIONS, MULTI, AREA F, AVIANO AIR BASE, AVIANO, ITALY, DATED MAY 4TH, 2016 AND MARKED TECHNICAL SPECIFICATIONS REV 2, 04 MAY 2016-81
WRITTEN PAGES INCLUDING COVER PAGE AND APPLICABLE SECTIONS OF MASTER
SPECIFICATIONSB. AS-BUILT DRAWINGS AND NEW- 44 SHEETSC. ADDITIONAL REQUIREMENTS
DATED 23 MAR 2016 - 3 WRITTEN PAGES to THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK
TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW AND STRICTLY IN
ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE
FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS PROJECT ASHE 16-1021
REPLACE PIPING CONNECTIONS, MULTI, AREA F, AVIANO AIR BASE, AVIANO, ITALY, DATED MAY
4TH, 2016 AND MARKED TECHNICAL SPECIFICATIONS REV 2, 04 MAY 2016-81 WRITTEN PAGES
INCLUDING COVER PAGE AND APPLICABLE SECTIONS OF MASTER SPECIFICATIONSB. AS-BUILT &
NEW DRAWINGS - 44 SHEETSC. ADDITIONAL REQUIREMENTS DATED 23 MAR 2016 - 3 WRITTEN
PAGES.
The FSC code has changed from Z1NB to Z2NB.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
The following have been added by full text:
5352.223-9000
ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (NOV 2012)
(a) Contractors shall not:
(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
[Note: This prohibition does not apply to manufacturing.]
(b) For the purposes of Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:
(1) Halons: 1011, 1202, 1211, 1301, and 2402;
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and
(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Air Force definition of a Class I ODS.]
(End of clause)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents shall be submitted and shall constitute the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through
K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown form Revision 2. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate breakdown
Revision 2 shall be returned in their entirety.
http://www.e-publishing.af.mil/shared/media/epubs/AFI32-7086.pdf
2. TECHNICAL ACCEPTABILITY
Submit current SOA certification for category OG11 and/or OS28 and classification adequate to cover offeror’s amount for project performance.
(End of Summary of Changes)