01101R_en.docx

DOCX document 145 KB Posted

Attached to
Replace Piping Connections, Multi, Area F, Aviano Air Base, Aviano AB
Solicitation number
FA5682-16-R-0009
Issued by

About this file

Section 01101R Master Specifications

View the file

Other files

File Type Posted
Amendment_FA5682-16-R-0009-0004.pdf PDF
Amendment_FA5682-16-R-0009-0004.pdf PDF
CCB_blank_Revision_2_-_09_May_2016.pdf PDF
Amendment_FA5682-16-R-0009-0003.pdf PDF
ASHE_16-1021_TEC_SPECS_rev2_date_04_may_2016.pdf PDF
BLDG_1480-81-82-83_Existing_HVAC_SYSTEM.pdf PDF
Amendment_FA682-16-R-0009-0002.pdf PDF
M1_ASHE_16-1021.pdf PDF
ASHE_16-1021_TEC_SPECS_Rev_1_date_20_April_2016.pdf PDF
BLDG_1484_Existing_HVAC_SYSTEM.pdf PDF
Amendment_FA682-16-R-0009-0001.pdf PDF
ADDITIONAL_REQUIREMENTS_23_Mar_2016.doc DOC document
ASHE_16-1021_TEC_SPECS_revised_23_Mar_2016.pdf PDF
Solicitation_FA5682-16-R-0009.pdf PDF
CCB_blank_22_Mar_2016.xls XLS spreadsheet
MAB.4.001.pdf PDF
MAB.4.023.pdf PDF
MAB.4.004.pdf PDF
MAB.4.025.pdf PDF
MAB.4.021.pdf PDF
MAB.4.002.pdf PDF
MAB.4.014.pdf PDF
MAB.4.022.pdf PDF
MAB.4.015.pdf PDF
MAB.4.003.pdf PDF
BLDG_3 4.pdf PDF
MAB.4.011.pdf PDF
MAB.4.013.pdf PDF
BLDG_1 2.pdf PDF
MAB.4.024.pdf PDF
MAB.4.005.pdf PDF
MAB.4.012.pdf PDF
ASHE_16-1021_TEC_SPECS.pdf PDF
15050_en.doc DOC document
CCEB_blank.xls XLS spreadsheet
15080_en.doc DOC document
01100_en.doc DOC document
15950_en.doc DOC document
15601_en.doc DOC document
15400_en.doc DOC document
16402_en.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01101R

PROJECT SIGN

PART 1 - PROJECT SIGN

1.1 Scope

Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.

PART 2 - GENERAL

The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site. The sign shall be 120 cm wide x 80 cm high and shall be constructed of a material suitable to withstand exposure to inclement weather for the duration of the contract, and must not show evidence of warping, cracking, or other defects. The sign shall have a blue background with white lettering, and shall contain the following information in English:

a. Project No.

b. Project description

c. Constructed under Supervision of Base Civil Engineering

d. Contracted by 31st Contracting Squadron

e. Contractor

f. Design Engineer: 31CES/CEPM

g. Inspector

h. Contract Management: 31 CONS Construction Flight

i. ERP Coord

Lettering of the sign may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.

PROJECT TITLE

Design by

31CES/CEPM

Design by

31CES/CEPM

AREA 1, AVIANO AIR BASE ITALY

ASJD 10-1159 RPR ROOF/FLASHING, GUTTERS & DOWNSPOUTS,

CLINIC, FAC. #121

AREA "1", AVIANO AB, ITALY

AREA F

-- End of Section --

2Section 01101
Section 01101R1

image1.jpeg

File details come from the government source that posted it. Updated .