CCB_blank_Revision_2_-_09_May_2016.pdf
PDF 10 KB Posted
- Solicitation number
- FA5682-16-R-0009
About this file
Construction Cost Estimate Breakdown Revision 2
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
ASHE 16-1021 REPLACE PIPING CONNECTION MULTI, AREA F - REVISION 2
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1021 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I – DEMOLITIONS AND REMOVALS
Ia - Architectural Works not applicable
Ib - Structural Works not applicable
Ic – Civil Works not applicable
Id - Mechanical Works not applicable, minor item included into construction work
Ie - Electrical Works not applicable
IIa - Architectural Works 1 not applicable
IIb - Structural Works not applicable
IIc - Civil Work not applicable
PART II – ARCHITECTURAL, CIVIL and STRUCTURAL WORK
Sheet 1 of 2
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
ASHE 16-1021 REPLACE PIPING CONNECTION MULTI, AREA F - REVISION 2
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1021 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III – MECHANICAL WORK
1 buildings 1480/81/82/83 ls 1.00 building 1484 ls 1.00 not applicable
Total EURO
PART IV – ELECTRICAL WORK
Sheet 2 of 2
File details come from the government source that posted it. Updated .