AF3052 CONSTRUCTION ESTIMATE BREAKDOWN/COSTI IN DETTAGLIO
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682 09 R 0026 0001 Amendment.doc | DOC document | |
| FA5682 09 R 0026 Solicitation.doc | DOC document | |
| NOTA AGLI OFFERENTI.docx | DOCX document | |
| FA5682 09 R 0026 Solicitation.doc | DOC document | |
| DRAWINGS ASHE 08 1066.PDF.pdf | ||
| ASHE 08-1066 Addendum 1.doc | DOC document | |
| RFSS 100_DWGS_PDF.pdf | ||
| Work area Hazard notification_mdt.docx | DOCX document | |
| SpecificheTecniche.pdf | ||
| Verbale Informativo Area di Lavoro_mdt.doc | DOC document | |
| TechnicalSpecifications.pdf | ||
| Presolicitation Notice Fire suppression detection system Wind 2003.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps Of
Engineers Europe District
Prepared and Submitted by:
SO.IN.CI. S.r.l.
Architecture, Engineering & Consulting Services
Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it
PROJECT ASHE 08-1066
REPAIR FIRE SUPPRESSION/DETECTION SYSTEM
“AREA F”, AVIANO AIR BASE
AVIANO, ITALY
CONSTRUCTION COST ESTIMATE
FINAL SUBMITTAL (100%)
Date: MAY 2009
A/E CONTRACT No.: W912GB-08-D-0003 D.O.: 0004
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
BUILDING No. 1000/ Edificio No. 1000
REMOVAL OF EXISTING PREFABRICATED METAL
STRUCTURE TECHNICAL ROOM.
Rimozione della struttura metallica prefabbricata del locale tecnico esistente.
IT. No.
Art. n. 1 LS/AC
BUILDING No. 1121/ Edificio No. 1121
EXECUTION OF HOLES IN PERIMENTER WALLS FOR
OVERPRESSURE DAMPERS INSTALLATION WITH
RECONSTRUCTION.
Esecuzione di fori nella muratura perimetrale per l'installazione di serrande di sovrappressione compresa ricostruzione.
IT. No.
Art. n. 2 LS/AC
3 REMOVAL OF INTERIOR METAL DOOR.
Rimozione di porta interna in metallo.
IT. No.
Art. n.
3 LS/AC
Total Architectural Work - Totale Lavori Architettonici
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 1 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
Ib Civil Work - Ib Lavori Civili
BUILDING No. 1000/ Edificio No. 1000
DEMOLITION OF EXISTING SPRINKLER ROOM REINFORCED
CONCRETE PAD .
Demolizione soletta in cemento armato dell'esistente locale sprinkler.
IT. No.
Art. n.
4 m2
DEMOLITION OF BITUMINOUS CONCRETE PAVEMENT
Demolizione di pavimento in conglomerato bituminoso
IT. No.
Art. n. 5 m2
EXCAVATION IN ANY KIND OF SOIL, 30 cm DEEP Scavo di terreno di qualsiasi natura, 30cm profondo
IT. No.
Art. n. 6 m3
Total Civil Work - Totale Lavori Civili
Id Mechanical Work - Id Lavori Meccanici
BUILDING No. 1000/ Edificio No. 1000
7 DEMOLITION AND REMOVAL OF EXISTING FIRE
SUPPRESSION FOAM STATION
Demolizione e rimozione dell'esistente centrale antincendio a schiuma.
IT. No.
Art. No. 7 LS/AC
8 REMOVAL OF EXISTING FIRE SUPPRESSION PIPELINE INSIDE
THE BUILDING
Rimozione dell'esistente rete di distribuzione dell'impianto di spegnimento a schiuma all'interno dell'edificio
IT. No.
Art. No.
8 LS/AC
Total Mechanical Work - Totale Lavori Meccanici
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 2 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
Ie Electrical Work - Ie Lavori Elettrici
BUILDING No. 1000/ Edificio No. 1000
MONACO TRASMITTER REMOVAL AND STORAGE
Rimozione ed immagazzinamento trasmettitore Monaco
IT. No.
Art. n. 9 LS/AC
REMOVAL AND DISPOSAL EXISTING FIRE ALARM SYSTEM
Rimozione e smaltimento impianto di rivelazione incendi esistente
IT. No.
Art. n. 10 LS/AC
BUILDING No. 1121/ Edificio No. 1121
MONACO TRASMITTER DESCONNECTING AND PROTECTION
Scollegamento e protezione del trasmettitore Monaco
IT. No.
Art. n. 11 LS/AC
REMOVAL AND DISPOSAL OF EXISTING FIRE ALARM SYSTEM
Rimozione e smaltimento dell'impianto di rivelazione incendi esistente
IT. No.
Art. n. 12 LS/AC
Total Electrical Work - Totale Lavori Elettrici
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 3 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
IIa Architectural Work - IIa Lavori Architettonici
BUILDING No. 1121/ Edificio No. 1121
INTERIOR PERIMETER FENCE WITH "KELLER" GALVD STEEL
GRATE, HEIGHT 2.10m.
Recinzione interna perimetrale in grigliato di acciaio zincato "keller", altezza 2,10m.
IT. No.
Art. n.
1 m2
BLOCK-UP OF ROOM No.003 DOOR OPENING WITH CMU
WALL.
Chiusura del vano porta del locale No.003 con blocchetti forati di cls.
IT. No.
Art. n. 2 m2
1.5 cm THICK INTERIOR WALL PLASTER FINISH ON CLOSED
DOOR AND CLOSED WINDOW.
Intonaco per pareti interne spessore 1,5 cm sulle chiusure porta e finestra.
IT. No.
Art. n.
3 m2
PAINTING OF INTERIOR WALLS.
Tinteggiatura di pareti interne.
IT. No.
Art. n. 4 m2
SILICATE PANELS INTERIOR WALL TO PROVIDE REI 120
COMPARTMENT, ROOM 003.
Parete interna di lastre in silicato di calcio per compartimentazione REI120, stanza 003.
IT. No.
Art. n.
5 m2
POLYURETHANE FOAM REI 120 IN FLOOR TRENCH TO
PROVIDE FIRE RESISTANCE AND AIR TIGHT SEALING
BETWEEN ADJACENT ROOMS.
Schiuma poliuretanica REI 120 in canaletta a pavimento esistente per fornire sigillatura resistente al fuoco e a tenuta d'aria tra i locali adiacenti.
IT. No.
Art. n. 6 LS/AC
Total Architectural Work - Totale Lavori Architettonici
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 4 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
IIb Civil Work - IIb Lavori Civili
BUILDING No. 1000/ Edificio No. 1000
20 cm THICK REINFORCED CONCRETE PAD Basamento in cemento armato, spessore 20 cm
IT. No.
Art. n. 7 m2
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 5 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
BUILDING No. 1000/ Edificio No. 1000
20 PROVIDE NEW WATER LINE FROM MAIN BASE PIPELINE TO
NEW FIRE STATION
Realizzazione della nuova linea di adduzione idrica dalla dorsale idrica della Base sino alla nuova stazione antincendio
IT. No.
Art. No. 1 LS/AC
21 FURNISCHING AND INSTALLATION OF NEW PREASSEMBLED
FIRE SUPPRESSION FOAM STATION
Fornitura e posa in opera della nuova stazione antincendio a schiuma preassemblata
IT. No.
Art. No.
2 LS/AC
22 NEW FIRE FOAM PIPELINES INSIDE THE BUILDING
Nuova rete di distribuzione antincendio all'interno dell'edificio
IT. No.
Art. No. 3 LS/AC
23 FURNISHING AND INSTALLATION OF SPRINKLER NOZZLES
Fornitura e posa in opera di erogatori sprinkler
IT. No.
Art. No. 4 EA/NO
24 FURNISHING SPARE SPRINKLER NOZZLES
Fornitura di erogatori sprinkler di ricambio
IT. No.
Art. No. 5 EA/NO
BUILDING No. 1121/ Edificio No. 1121
25 NEW GASEOUS FIRE SUPPRESSION SYSTEMs Nuovo impianto di spegnimento incendi a gas
IT. No.
Art. No. 6 LS/AC
26 TEST, AS BUILT DRAWINGS AND CERTIFICATION FOR NEW
GASEOUS FIRE SUPPRESSION SYSTEM
Prove, disegni del come costruito e certificazioni dei nuovi impianti di spegnimento a gas
IT. No.
Art. No.
7 LS/AC
27 PRESSURE RELIEF DAMPERS 300x200 Serranda di sovrapressione 300x200
IT. No.
Art. No. 8a EA/NO
28 PRESSURE RELIEF DAMPERS 400x200 Serranda di sovrapressione 400x200
IT. No.
Art. No. 8b EA/NO
29 PRESSURE RELIEF DAMPERS De 150 Serranda di sovrapressione De 150
IT. No.
Art. No. 8c EA/NO
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 6 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
BUILDING No. 1000/ Edificio No. 1000
METALLIC CONDUITS AND WIRING
Tubazione metallica e cablaggio
IT. No.
Art. n. 1 LS/AC
FIRE ALARM SYSTEM
Impianto di allarme incendi
IT. No.
Art. n. 2 LS/AC
NEW ELECTRICAL LINE
Nuova linea elettrica
IT. No.
Art. n. 3 LS/AC
NEW ELECTRICAL PANEL
Nuovo quadro elettrici
IT. No.
Art. n. 4 EA/NO
SYSTEM TEST AND SETUP
Prove e messa a punto dell'impianto
IT. No.
Art. n. 5 LS/AC
AS BUILT DRAWINGS
Disegni del come costruito
IT. No.
Art. n. 6 LS/AC
BUILDING No. 1121/ Edificio No. 1121
METALLIC CONDUITS AND WIRING
Tubazione metallica e cablagio
IT. No.
Art. n. 7 LS/AC
FIRE ALARM SYSTEM
Impianto di allarme
IT. No.
Art. n. 8 LS/AC
SYSTEM TEST AND SETUP
Prove e messa a punto dell'impianto
IT. No.
Art. n. 9 LS/AC
AS BUILT DRAWINGS
Disegni del come costruito
IT. No.
Art. n. 10 LS/AC
TOTAL PART IV / Totale Parte IV
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 7 of 9
Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 08-1066 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM
UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL
OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REPAIR FIRE SUPPRESSION - DETECTION SYSTEM, BLDGS #1000 AND #1221
Ripristino impianto soppressione - rivelazione incendi, edifici No. 1000 e 1221
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,7905€)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
AF Form 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE FOR OFFICIAL USE ONLY Sheet 8 of 9
ASHE 08-1066 - REPAIR FIRE SUPPESSION/DETECTION SYSTEMS, AREA "F", AVIANO AIR BASE, ITALY
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS € $
TOTAL LABOR COSTS € $
TOTAL OTHER DIRECT COSTS € $
TOTAL DIRECT COSTS € $
OVERHEAD % € $
SUBTOTAL € $
PROFIT % € $
TOTAL PRICE € $
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
(Reverse of AF Form 3052, Jan 88)
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
FOR OFFICIAL USE ONLY Sheet 9 of 9